Published on: 28759256. To update and clarify the rules, and to update Rule 25-6.0345 with the most recent version of the National Electrical Safety Code (NESC). The NESC is also mentioned via cross-reference to Rule 25-6.0345 in Rule 25-18.020, ....
Published on: 22222329. Public electric utility storm protection plans and storm protection cost recovery clause rulemaking to implement Section 366.96, F.S.
Docket No. 20190131-EU
; Tuesday, August 20, 2019, at 9:30 a.m.; Room 148, Betty Easley Conference Center, 4075 Esplanade Way, Tallahassee, Florida.
Published on: 21954221. To implement Section 366.96, FS, which was passed by the Florida Legislature in the 2019 session. Section 366.96, FS, requires public electric utilities to file storm protection plans with the Commission and allows a public electric utility to petition for cost recovery annually through a storm plan cost recovery clause. To adopt new rules and to determine whether existing rules should be amended or repealed to implement Section 366.96, FS.
Undocketed
Published on: 19055570. To update the rule so that the 2017 Edition of the National Electrical Safety Code is incorporated by reference into the rule.
Docket No. 170034-EU
Published on: 18373660. To update the rule so that the most recent version of the National Electric Safety Code (NESC) (IEEE C2- 2017 edition) is incorporated by reference.