Published on: 28629858. variance or waiver pursuant to section 120.542, F.S. from Vanderbilt Naples Holdings, LLC. The petition requested a variance from Rules: 62B-33.005(13) and 62B-33.0155(n), F.A.C., relating to requirements for tinting on ....
Published on: 20866948. Definitions, Exemptions from Permit Requirements, General Criteria for Areawide and Individual Permits, Application Requirements and Procedures for Areawide and Individual Permits, Application Fees, Electronic Submittals, Permit Modifications, Time Extensions, Renewals, and Reissuances, Emergency Procedures, General Permit Conditions, Thirty-Year Erosion Projection Procedures
Published on: 20574105. The Department is amending Chapter 62B-33, F.A.C., Rules and Procedures for Coastal Construction and Excavation (Permits for Construction Seaward of the Coastal Construction Control Line and Fifty-Foot Setback), authorized by Sections 161.053 and 161.052, F.S., respectively.
Published on: 19405158. The Department is proposing amendments to Chapter 62B-33, F.A.C., Rules and Procedures for Coastal Construction and Excavation (Permits for Construction Seaward of the Coastal Construction Control Line and Fifty-Foot Setback), authorized by Sections 161.053 and 161.052, F.S., respectively. The proposed amendments will clarify and update existing rule language, delete obsolete definitions, revise the definition for “armoring”, “coastal system”, “construction debris”, “Department”, add definitions for “native vegetation”, “registered professional”, and “reissued permit”. The revisions provide additional exemptions from permitting for certain minor activities, delete obsolete references to the Florida Building Code, establish criteria for fill material, provide more specific criteria for siting of both major and minor structures (including those where armoring exists), establish criteria for rebuilt pipelines and ocean outfalls crossing the beach, clarify requirements for geotechnical data and other information required in the application process, delete the requirement to submit multiple copies of certain documents to the Department, simplify fee calculations, eliminate the permit fee for exemption determinations and permit transfers, reduce the permit fee for reissued permits, provide for electronic submission of applications and related documents, provide success criteria for site re-vegetation, eliminate a requirement for construction progress reports, and clarify the methodology used to establish the 30-year erosion projection line.
Published on: 15541066. This is the second workshop to discuss the proposed amendments to Chapter 62B-33, F.A.C., and creation of the CCCL Applicant’s Handbook which contains the rules and procedures for coastal construction and excavation seaward of the coastal construction control line or 50 foot setback. The original Notice of Rule Development/Workshop was published on June 9, 2014 in Vol. 40, No. 111, F.A.R. Additionally, a live Webinar will be available. Participants may register at https://attendee.gotowebinar.com/register/6431938877060464385.; February 12, 2015, 9:30 a.m.; 2600 Blairstone Road, Room 609, Tallahassee, FL 32399-2400
Published on: 15525255. This is the SECOND WORKSHOP to discuss the proposed amendments to Chapter 62B-33, F.A.C., and creation of the CCCL Applicant’s Handbook which contain the rules and procedures for coastal construction and excavation seaward of the coastal construction control line or 50 foot setback. Additionally, a live Webinar will be available. Participants may register at https://www2.gotomeeting.com/register/XXXXX.
The original Notice of Rule Development was published; February 12, 2015 at 9:30 am; 2600 Blairstone Road, Room 609, Tallahassee, FL 32399-2400
Published on: 14668648. The Department of Environmental Protection proposes amendments to Chapter 62B-33, F.A.C., Rules and Procedures for Coastal Construction and Excavation (Permits for Construction Seaward of the Coastal Construction Control Line (CCCL) and 50-Foot Setback). The proposed amendments will clarify and update existing rule language to reflect current procedures for exemptions, marine turtle protection and vegetation maintenance criteria, siting criteria, survey requirements, thirty year erosion projections, permit time limits and extensions, general conditions, definitions, forms, and fees. The Department is also proposing to update and add new general permits for activities seaward of the CCCL. In addition to amendments to the rule chapter, the Department proposes the creation of a CCCL Applicant’s Handbook.