10-007669BID
American Lighting And Signalization vs.
Department Of Transportation
Status: Closed
Recommended Order on Wednesday, December 1, 2010.
Recommended Order on Wednesday, December 1, 2010.
1STATE OF FLORIDA
4DIVISION OF ADMINISTRATIVE HEARINGS
8AMERICAN LIGHTING )
11AND SIGNALIZATION, )
14)
15Petitioner, )
17)
18vs. ) Case No. 10 - 7669BID
25)
26DEPARTMENT OF TRANSPORTATION, )
30)
31Respondent, )
33)
34and )
36)
37MILLER ELECTRIC COMPANY, )
41)
42Inte rvenor. )
45)
46RECOMMENDED ORDER
48A formal hearing was conducted in this case on September 16,
592010, and October 1, 2010, in Tallahassee, Florida, before
68Suzanne F. Hoo d, Administrative Law Judge with the Division of
79Administrative Hearings.
81APPEARANCES
82For Petitioner: Karen D. Walker, Esquire
88Holland and Knight
91315 South Calhoun Street, Suite 600
97Tallahassee, Flo rida 32301
101For Respondent: C. Denise Johnson, Esquire
107Department of Transportation
110Haydon Burns Building, Mail Station 58
116605 Suwannee Street
119Tallahassee, Florida 32399 - 0450
124For Intervenor: Charles R. Walker, Jr., Esquire
131Regan Zebouni and Walker, P.A.
1369905 Old St. Augustine Road
141Jacksonville, Florida 32257
144STATEMENT OF THE ISSUE
148The issue is whether Respondent Florida Dep artment of
157TransportationÓ s (the Department or FDOT) determination that
165Intervenor Miller Electric Company (Miller) is a responsive
173design - build proposer was clearly erroneous, contrary to
182competition, or arbitrary and capricious.
187PRELIMINARY STATEMENT
189B y formal written protest dated July 2, 2010, Petitioner
199American Lighting and Signalization, Inc. (ALS) protested FDOT's
207intended decision to award a design - build contract to Miller.
218The contract involves the design and construction of the SR 5
229(U.S. 1) I ntelligent Transportation System (ITS) from SR 9 north
240to Wister Street, Duval County, Florida, Contract Number E2077
249(Project).
250The Department referred this matter to the Division of
259Administrative Hearings on August 17, 2010. A Notice of Hearing
269date d August 18, 2010, scheduled the hearing for September 16,
2802010.
281On August 26, 2010, Miller filed its Petition to Intervene.
291An Order Granting Petition to Intervene was entered on
300September 1, 2010.
303The hearing commenced on September 16, 2010, as sc heduled.
313However, the matter could not be concluded in the time allotted.
324Therefore, the case was continued to October 1, 2010.
333During the hearing, Stipulated Exhibits 1 - 21 were received
343into evidence.
345AL S called five witnesses. ALS offered seven exhibits that
355were accepted as evidence.
359The Department called two witnesses. The Department offered
367one exhibit that was accepted as evidence.
374Miller called two witnesses. Miller offered one exhibit
382that was received into evidence.
387The transcript s of the first and second day of the hearing
399were filed on September 30, 2010, and October 14, 2010,
409respectively. The parties filed their Proposed Recommended
416Orders on October 28, 2010.
421Except as otherwise noted, all references hereinafter shall
429be t o Florida Statutes 2010.
435FINDINGS OF FACT
4381. This protest arises out of FDOT's April 19, 2010,
448request for a design - build proposal (RFP) relating to the Project
460referenced above. The RFP requires the services performed by the
470Proposer to be in complian ce with all applicable manuals and
481guidelines. FDOT issued three addenda to the RFP, the last of
492which (Addendum #3) was issued two days prior to the advertised
503proposal submission deadline.
5062. The specific services were outlined as follows in the
516RFP :
518The ITS Project (Project) consists of the
525installation of ten (10) arterial dynamic
531message signs (ADMS), interconnection with
536the existing FDOT District 2 and City of
544Jacksonville fiber optic networks (FON),
549installation of a closed - circuit televisio n
557(CCTV) camera subsystem with eighteen (18)
563CCTV cameras, and the upgrade of eighteen
570(18) existing signal cabinets for central
576command and communication. The Project shall
582also include all ancillary components and
588device configuration adjustments needed to
593connect and operate a complete ITS.
5993. The RFP is a low bid design - build technically acceptable
611procurement. The RFP states that after the public bid opening:
621The FDOT shall open all bids received at a
630public bid opening on the date found in
638Se ction II of this document. The FDOT
646Technical Review Committee will review the
652Technical Proposal of the lowest bidder. The
659Technical Review Committee will then
664establish if the Technical Proposal is
670responsive or non - responsive based on the
678criteria des cribed in the document. If the
686proposal is responsive, that Proposer will be
693awarded the project. If the proposal is
700found to be non - responsive, the FDOT
708Technical Review Committee will review the
714Technical Proposal of the next lowest bidder
721and establis h if the Technical Proposal is
729responsive or non - responsive based on the
737criteria described in this RFP and so on.
7454. In a low bid design - build procurement, price is
756particularly important because bidders are eliminated solely on
764price. In this RFP, bi dders were to base their technical and
776price proposals on the RFP package as well as the addenda and
788question and answers issued by FDOT. In Section III, Subsection
798H, the RFP states as follows in relevant part:
807The Department may waive minor informali ties
814or irregularities in proposals received where
820such is merely a matter of form and not
829substance, and the correction or waiver of
836which is not prejudicial to other Proposers.
843Minor irregularities are defined as those
849that will not have an adverse effe ct on the
859Department's interest and will not affect the
866price of the Proposals by giving a Proposer
874an advantage or benefit not enjoyed by other
882proposers.
8831. Any design submittals that are part of a
892proposal shall be deemed preliminary only.
8982. Prel iminary design submittals may vary
905from the requirements of the Design and
912Construction Criteria. The Department, at
917their discretion, may elect to consider those
924variations in awarding points to the proposal
931rather than rejecting the entire proposal.
9373. In no event will any such elections by
946the Department be deemed to be a waiver of
955the Design and Constructions Criteria.
9604. The Proposer who is selected for the
968project will be required to fully comply with
976the Design and Construction Criteria for the
983price bid, regardless that the proposal may
990have been based on a variation from the
998Design and Construction Criteria.
10025 . In Section III, Subsection I, the RFP addressed
1012modification of proposals. Proposers could modify previously
1019submitted proposals at any time prior to the proposal due date.
10306 . The Department opened eight proposals on June 9, 2010.
1041Miller was the low bidder with a total price of $1,549,875.00.
1054ALS was the second lowest bid with a total price of
1065$1,564,189.00, a difference of $1 4,314.00.
10747 . MillerÓ s proposal was submitted to the Department's
1084Technical Review Committee (TRC) for a determination whether its
1093Technical Proposal was responsive or non - responsive. The TRC was
1104comprised of the following members of FDOT's staff: (a) John
1114Kell, ITS Project Manager; (b) Jerry Ausher, P.E., Traffic
1123Operation Engineer; and (c) Amy Williams, P.E., Senior Project
1132Manager. Kathy Thomas, P.E., District Two Consultant Design
1140Engineer, was not a member of the TRC but provided guidance to
1152it.
11538 . The Department has adopted Design Build Guidelines (the
1163guidelines) that address the role of the TRC in low bid design -
1176build procurements. In Section 4.13, the guidelines state that
1185the "TRC shall review the design concepts and preliminary designs
1195of the lowest bidder proposed in order to assess the
1205resp onsiveness of the lowest bidderÓ s technical proposal compared
1215to the Design and Construction Criteria Package." The guidelines
1224also state as follows in pertinent part:
1231In the event the lowest bidd er's technical
1239proposal is found to be non - responsive, the
1248TRC will then review the next lowest bidder's
1256technical proposal to determine its
1261responsiveness . . . A Bid Proposal is
1269considered non - responsive if it does not
1277contain all of the required informa tion and
1285level of detail, or is non - compliant with the
1295design and construction criteria defined in
1301the RFP. It may be appropriate for the
1309Department to contact the non - responsive firm
1317to discuss/clarify its concerns prior to
1323moving on to the next lowest b idder.
1331However, once determined that the low bidder
1338is non - responsive, the process shall continue
1346until the lowest bidder having a responsive
1353proposal is found.
13569 . The Department has also adopted a Design - Build
1367Procurement and Administration Policy ( the policy) which
1375specifically references the guidelines and contains language
1382similar to the guidelines with respect to the role of the TRC.
1394The policy authorizes the Department to contact a firm to discuss
1405or clarify its concerns before moving on to the next lowest
1416bidder.
141710 . Sometime before the Department issued the RFP, it had a
1429meeting with some of its staff, including Ms. Thomas. During the
1440meeting, the Department's staff was advised that they were
1449scrutinizing technical proposals submitted by low bidders too
1457thoroughly. The new philosophy was for TRCs to ask clarifying
1467questions of the low bidder if they had concerns and if those
1479questions were not answered correctly, to find the low bidder
1489non - responsive.
149211 . The TRC in this case met for the first time on June 15,
15072010. During that meeting, the TRC developed a list o f concerns
1519they had with MillerÓ s proposal and su bmitted those to the
1531DepartmentÓ s procurement staff.
153512 . The Department forwarded three questions to Miller.
1544First, the T RC questioned whether Miller intended to reference
"1554mast arm" structures or cantilever sign structures in a section
1564of the proposal. Second, th e TRC questioned whether MillerÓ s bid
1576included the installation of new conduit at Shad Road as opposed
1587to using the less expensive existing conduit. Third, th e TRC
1598questioned whether MillerÓ s proposal included the deletion of the
1608wireless assembly at Shad Road.
161313 . On or about June 16, 2010, Kirk Townsend, MillerÓ s
1625Senior Project Manager, responded to all three questions. The
1634next day, the TRC met and voted unanimously to recommend the
1645award to Miller.
164814 . The TRC did not look at each requirement in the RFP.
1661Instead, the TRC looked at the overall intent of MillerÓ s
1672technical proposal.
167415 . Mr. Kell, a m ember of the TRC, stated at hearing that
1688the procurement process for this RFP was different from any other
1699procurement that he has participated in and that he did not make
1711a specific responsiveness determination. Mr. Kell also stated
1719that Miller's proposa l did not contain all of the information
1730required by the RFP and that under the guidelines and policy
1741manuals, the proposal would have been deemed non - responsive.
1751However, under the terms of the RFP, Mr. Kell found that there
1763was sufficient information in MillerÓ s preliminary plans to
1772understand how Miller would prosecute the work to his
1781satisfaction.
178216 . Mr. Ausher, another member of the TRC, testified at the
1794hearing. According to Mr. Ausher, the essential items in the RFP
1805were included in MillerÓ s tec hnical proposal. Mr. Ausher was of
1817the opinion that the role of the TRC was to review the
1829requirements of the RFP, review the proposal, and verify that the
1840proposal met the intent of the RFP.
184717 . Ms. Williams was the third member of the TRC. She
1859evalua ted Miller Ó s proposal and found it to be responsive. She
1872did not believe that any additional clarificati on was needed, but
1883heard MillerÓ s response to the three clarifying questions and
1893found the response satisfactory.
189718 . On June 22, 2010, the Departm ent posted its notice of
1910intent to award the contract to Miller.
191719 . Whe n ALS learned of the DepartmentÓ s intended contract
1929award to Miller, ALS requested a copy of MillerÓ s technical
1940proposal from the Department. ALS then reviewed the proposal and
1950id entified a number of issues that ALS believed would render the
1962Miller proposal non - responsive.
196720 . James Hardiman is Vice President of ALS. Mr. Hard iman
1979contacted Jane Jones, FDOTÓ s Purchasing Director, and asked if
1989she would meet with him to discuss issues that ALS had with the
2002intended contract.
200421 . Ms. Jones met with Mr. Hardiman after June 22, 2010,
2016but prior to the protest period running on June 25, 2010.
2027Ms. Jones made a list of ALSÓ concer ns and provided the list to
2041Ms. Thomas by e - mail.
204722 . Ms. Thomas provided a revised list of issues to
2058Ms. Jones with instructions to question Miller regarding the
2067revised issue list. Ms. ThomasÓ revised list reflected only
2076those questions that she felt needed to be asked of Miller.
208723 . Ms. Jones se nt an e - mail to Mr. Townsend, Miller Ó s
2103Senior Project Manager on June 24, 2010. The e - mail stated that
2116the Department would like to clarify certain contract
2124requirements. The e - mail asked Miller to verify that it would
2136complete the scope in the RFP for t he price bid and within the
2150contract duration. The e - mail requested Miller to provide the
2161required listing of categories for the Schedule of Values.
217024 . On the evening of June 24, 2010, Mr. Townsend responded
2182by e - mail, stating that Miller would compl ete the scope req uired
2196by the RFP within the 360 - day contract duration. The following
2208morning, Mr. Townsend sent an e - mail to Ms. Jones, providing the
"2221preliminary schedule of values as required by the RFP."
223025 . The clarifications from Miller, as a re sult of the
2242allegations by Mr. Hardiman, were not received or considered by
2252the TRC. The TRC did not meet again following the posting of the
2265intended award to Miller.
226926 . There is nothing in the RFP, the guidelines or the
2281policy that authorizes the De partment to ask clarifying questions
2291of a bidder or to ask the bidder to provide additional
2302information not included in the technical proposal after the
2311intended award has been posted and prior to the protest period
2322running. It concerned Ms. Jones that th e Department was asking
2333Miller questions about its proposal during this time period.
234227 . On July 2, 2010, ALS filed its formal written protest
2354with the Department. The protest alleg es in relevant part that
2365MillerÓ s technical proposal was non - responsiv e for the following
2377reasons: (a) MillerÓ s preliminary schedule failed to provide 45
2387days for Department shop drawing review; (b) Miller failed to
2397provide splice boxes at all fiber optic splice field locations;
2407(c) Miller failed to include a preliminary li sting of categories
2418for the Schedule of Values; (d) Miller failed to comply with the
2430requirements for guardails ; and (e) Miller did not show a 60 -
2442month warranty period for the Ethernet Field Switches.
245028 . To support its protest at hearing, ALS relied h eavily
2462on a strict interpretation of RFP language requiring a technical
2472proposal to contain all required information and level of detail
2482in order to be responsive. However, if that language was
2492strictly enforced, the Department could never award a contrac t.
250229 . With a design - build project there is more than one way
2516to build something. The technical proposals submissions are
2524preliminary in nature. The RFP would be the controlling document
2534if there is an unacceptable variance in the proposal.
2543Schedule of Values
254630 . ALS has complained that Miller failed to provide the
"2557preliminary listing of categories for the Schedule of Values"
2566with its technical proposal. Typically, the Department does not
2575request a Schedule of Values in a design - build proposal.
258631 . It is true that MillerÓ s original proposal did not
2598include the Schedule of Values. In Section V, Subsection P, the
2609RFP states the "[t]he Proposer shall submit a preliminary listing
2619of categories for the Schedule of Values with the Technical
2629Propos al. No price information shall be provided in the
2639Technical Proposal."
264132 . A Schedule of Values usually is the way a contractor
2653breaks down items for payment. It is a tool that the Department
2665uses to make sure that a contractor does not front load pa yments
2678on a job. In this case, the Department wanted to see a
2690preliminary listing of the categories of the Schedule of Values
2700so that it would know what the pay items would be and that they
2714would cover the contract.
271833 . Mr. Kell, as a member of the TR C, testified on direct
2732examination that the use of the word "shall" in the RFP made the
2745requirement for a Schedule of Values a mandatory requirement.
2754Mr. Kell also testified that under the terms of the guidelines
2765and policy manuals, the failure to include the Schedule o f Values
2777would mean that MillerÓ s proposal was non - responsive.
278734 . Mr. Kell testified that he helped develop the RFP but
2799did not know why the Department used the word "shall" in
2810requiring a Schedule of Values. His testimony that the wor d
"2821shall" was included in the RFP only because the Department used
2832a generic form to write the RFP is not persuasive.
284235 . Dale Cody is Senior Vice President over production for
2853Metric Engineer ing. Mr. Cody served as MillerÓ s proposal
2863designer. At the hearing, Mr. Cody admitted th at the plans
2874included in MillerÓ s proposal were not designed to show all of
2886the required parts of the RFP.
289236 . The most persuasive evidence indicates that the TRC
2902overlooked the missi ng Schedule of Values in MillerÓ s propo sal.
2914Allowing Miller to provide the schedule after announcing the
2923contract award permitted Miller to supplement its proposal.
293137 . In this case, the omission of the Schedule of Values
2943had no affect on the pricing of the project. During the hearing,
2955Ph il Karaganis, Supervisor for ALS, admitted that the failure to
2966timely submit a Schedule of Values had no price impact on the
2978bid. However, the absence of the mandatory schedule deprived the
2988Department of having knowledge of the proposed pay items and
2998know ledge that they would cover the contract.
3006Cantilevered Sign Supports
300938 . ALS contends that MillerÓ s technical proposal is non -
3021responsive based on a typographic al error in one place of
3032MillerÓ s proposal that references mast arm structures instead of
3042tr icord cantilever structures. MillerÓ s proposal clearly
3050included tricord cantilever sign supports. Several areas of the
3059technic al proposal demonstrated MillerÓ s understanding that
3067cantilevered sign supports were required. This issue was
3075resolved pursuant to the clarifying questions asked by the
3084Department before making the award.
3089Preliminary Schedule
309139 . ALS asserts that MillerÓ s proposal is non - responsive
3103based on alleged omission in the preliminary schedule submitted
3112with MillerÓ s technical proposal. The schedule provided with the
3122technical proposal is preliminary and simply shows that the
3131proposer possesses a basic understanding of the requirements of
3140the RFP.
314240 . The RFP required a construction sche dule to be included
3154in a bidderÓ s technical pr oposal with a maximum contract duration
3166of no more than 360 calendar days. Failure to complete the
3177project in 360 days would n egatively impact the DepartmentÓ s
3188interest and increase the cost of the project.
319641 . In Section VI, Subsection I, the RFP ini tially stated
3208as follows:
3210The Proposer must account for a 10 working
3218day shop drawing review time by the
3225Department in its schedule.
322942 . On June 7, 2010, the Department issued Addendum #3,
3240which changed the time to 45 working days for the Department Ó s
3253shop drawing review time. The addendum did not extend the
3263maximum contract duration of 360 days.
326943 . MillerÓ s proposal provides for only 14 calendar days
3280for review of shop drawings. Miller Ó s proposal identifies review
3291and approval of shop dra wing as a critical item by showing a red
"3305critical bar" next to this item on the schedule.
331444 . Despite showing only 14 days for the DepartmentÓ s
3325review and ap proval of shop drawings, MillerÓ s schedule would not
3337have to be significantly revised in order to complete the project
3348in 360 days. Miller can adjust its activities during the 90
3359percent design phase by overlapping the shop drawing review with
3369the plans development period. The scheduling can be accomplished
3378by sliding certain activities and using "negative lag" to allow
3388for shop drawing review during the plans development period.
339745 . Mr. Ausher, as a member of the TRC, testified that he
3410reviewed Miller's preliminary schedule and was satisfied that
3418Miller could meet the 45 - day shop drawing revi ew and approval
3431requirement. Ms. Ausher made this determination by no ting the
344150 - day float in MillerÓ s schedule with respect to shop drawing
3454submittal.
345546 . In contrast, ALS Ó proposal expressly provided for a 45 -
3468day period as required by Addendum #3. After receiving the
3478addendum, ALS adjusted its schedule to account for the 31
3488additional days.
349047 . ALS also adjusted its price to add additional dollars
3501for overtime, equipment costs, and possible night work that it
3511believed would be needed to accommod ate the additional review and
3522approval time. If ALS had not been required to include 45 days
3534for Department review of sho p drawings in its schedule, ALSÓ
3545price would have been approximately $20,000 less. On the other
3556hand, there is no persuasive evidenc e that MillerÓ s accommodation
3567of additional time for shop drawing review and approval in the
3578design phase w ould modify the price of MillerÓ s proposal or
3590impact the bid price.
3594New Conduit at Shad Road
359948 . ALS complained that MillerÓ s proposal did not ac count
3611for new conduit at Shad Road as provided in Addendum #1 to the
3624RFP. However, upon receipt of the addendum, Miller adjusted its
3634price proposal to account for new conduit at Shad Road. Miller
3645also confirmed its intent to install the new conduit in re sponse
3657to the Department's clarifying questions prior to the award of
3667the contract.
3669Splice Boxes
367149 . ALS complained that MillerÓ s technical proposal
3680included pay item references to pull boxes instead of splice
3690boxes. The R F P required a proposer to "f urnish and install
3703splice boxes at all fiber optic field locations as shown on the
3715plans and at other locations as required." The plans that were
3726part of the RFP specifications require splice boxes at four
3736locations.
373750 . A splice box is different fro m a pull box. A splice
3751box is larger, deeper, and more expensive than a pull box.
376251 . MillerÓ s plans include references to Pay Item No. 783 -
37755 - 1 at locations where the RFP calls for splice boxes. That pay
3789item is for a pull box. Pay Item No. 783 - 6 - 1 is the pay item for
3808a splice box.
381152. However, the plan sheets submitted by Miller clearly
3820identify the utili zation of splice boxes. MillerÓ s failure to
3831use specific language referencing splice boxes was due to a
3841technician oversight. Most important l y, MillerÓ s Price Proposal
3851included the use of splice boxes. The typographical error in
3861omitting specific references to splice boxes in the technical
3870proposal had no impact on the method used to arrive at MillerÓ s
3883Price Proposal.
3885Guard r ails
388853 . ALS c omplained that Miller failed to provide guard r ails
3901at locations required by the RFP. The RFP states that guard r ails
3914will only be permitted upon the writt en approval of the
3925Department.
392654 . Chapter 2 of the Department's Plans Preparations Manual
3936(PPM) pr ovides that if a sign has to be placed in the clear zone,
3951it must be protected with a barrier. Based on the plans included
3963in the RFP, two of the Arterial Dynamic Messaging Sign (ADMS)
3974structures for the Project have to be placed in the clear zone
3986due to overhead power lines in the area.
399455 . Chapter 4 of the PPM addresses roadside safety. This
4005chapter of the PPM provided that a non - breakaway sign, such as
4018the ADMS signs required by the Project, are normally considered
4028more hazardous than a roadside ba rrier, such as a guard r ails .
4042MillerÓ s proposal did not include any guard r ails and was priced
4055accordingly. Including the guard r ails added approximately
4063$18,000.00 to ALSÓ price proposal.
406956 . MillerÓ s decision not to include guard r ails was an
4082engineeri ng determination based on the application of the
4091Resurfacing, Restoration and Rehabilitation (RRR) criteria in
4098Chapter 25 of the PPM. The RRR criteria provide for more relaxed
4110clear zone requirements and would eliminate the requirement for a
4120guard r ails in this case.
412657 . Ch apter 2 of the PPM states that Ð design criteria for
4140Resurfacing, Restoration, and Rehabilitation are presented in
4147Chapter 25 of this volume and are applicable only on programmed
4158RRR projects. Ñ The Project here has not been programmed as and
4170is not an RRR project. Further, Chapter 25 of the PPM states
4182that it does not apply to strategic intermodal systems (SIS) or
4193to new construction. The instant Project is both.
420158 . In this case, Miller presented persuasive evidence that
4211the PPM is an engin eering guide to design. MillerÓ s design
4223engineer, Mr. Cody, pointed out that sections of the PPM
4233establish that RRR criteria can be used on projects not
4243specifically designated as RRR. In determining that guard r ail s
4254were not required, Mr. Cod y considered Chapters 2, 7, and 25 of
4267the PPM. Based on the only engineering testimony provided, the
4277Design - Build Criteria Requirements do not require the
4286installation of guard r ail s.
4292Warranty
429359. A table in MillerÓ s technical proposal relating to
4303war ranties included a typographical error referencing a 36 - month
4314warranty period instead of the specified 60 - month period for
4325Ethernet Swit ches. That same page of MillerÓ s proposal included
4336language clar ifying and demonstrating MillerÓ s knowledge that a
434660 - m onth warranty was required for the switches. The error had
4359no price impact on the bid.
4365ALSÓ Proposal
436760 . ALS alleged in its formal protest that its proposal was
4379fully compliant with the RFP. At hearing, Miller introduced
4388evidence in an attempt to sh ow that ALSÓ proposal was not
4400responsive, and therefore, that ALS had no standin g. FDOT has
4411never reviewed ALSÓ proposal.
441561 . ALSÓ construction schedule does not use the words
"4425operational test." However, the 14 - day operational test is
4435included in th e portion of the ALS schedule entitled Systems
4446Integration. Thus, ALS would not have to revise its construction
4456schedule to include the 14 - day operational test.
446562. ALS Ó construction schedule has no task that
4474specifically accounts for preparation of shop drawings. Even so,
4483there is no persuasive evidence that the failure to include time
4494for preparation of shop drawings would make ALSÓ proposal non -
4505responsive.
450663 . Similarly, although ALS did not specifically identify
4515environmental permit acquisit ion in its proposed schedule, this
4524was included under the heading of "Permitting" in ALSÓ
4533construction schedule inclu ded in its technical proposal.
454164 . ALSÓ proposal does not include pay items for a fiber
4553jumper or Gbic. There is no such pay item beca use the Gbic is
4567part of the Ethernet Switch included in ALSÓ proposal.
4576Additionally, jumpers are covered based on a plan note in the ALS
4588proposal.
458965 . ALSÓ proposal shows a directional bore for the fiber
4600optic conduit and cable, and uses the pay item 555 - 1 - 1 for the
4616directional bore. The proposal also uses a pay item for
4626underground conduit where there is a median.
463366 . Language in the RFP refers to CCTV cameras in MPEG2
4645format. The ALS proposal includes a cut sheet for a CCTV camera
4657that uses MPE G4 encoding, which is a better camera and cost about
4670the same as the camera required in the RFP.
467967 . The evidence relative to ALSÓ proposal shows that it
4690has standing to challenge the cont r act award to Miller. The
4702e vidence presented regarding ALSÓ pro posal does not speak to the
4714responsiveness of ALS Ó proposal as a whole.
4722CONCLUSIONS OF LAW
472568 . The Division of Administrative Hearings has
4733jurisdiction over the parties and the subject matter of this
4743proceeding pursuant to Sections 120.569, 120.57(1), and
4750120.57(3)(f), Florida Statutes.
475369 . ALS has two burdens in this case. First, ALS must
4765demonstrate that its bid was responsive before it can
4774successfully challenge the award of the contract to another
4783proposer. See Intercontinental Properties v. St ate of Florida,
4792Department of Health and Rehabilitative Services , 606 So. 2d 380,
4802384 (Fla. 3d DCA 1992). AlS has met its burden of proving
4814standing to challenge the contract award to Miller.
482270 . The scope of this p roceeding and the nature of ALSÓ
4835sec ond burden is set forth in Section 120.57(3)(f), Florida
4845Statutes, which states as follows in relevant part:
4853In a competitive - procurement protest, other
4860than a rejection of all bids, proposals o r
4869replies, the administrative l aw judge shall
4876conduct a de n ovo proceeding to determine
4884whether the agency's proposed action is
4890contrary to the agency's governing statutes,
4896the agency's rules or policies, or the
4903solicitation specification. The standard of
4908proof for such proceedings shall be whether
4915the proposed ag ency action was clearly
4922erroneous, contrary to competition,
4926arbitrary, or capricious.
492971 . Section 337.11, Florida Statutes, requires the
4937Department to adopt procedures by rule for administering design -
4947build contracts, including rules relating to TRCs . The
4956Department has adopted Florida Administrative Code Rule 14 -
496591.007(4)(b), which states in pertinent part as follows:
4973A technical proposal shall include all
4979information requested in response to the
4985request for proposals.
498872 . The Department has al so adopted the guidelines and
4999policy referenced above in the Findings of Fact that expressly
5009address low bid design - build procurement . In this case, the
5021DepartmentÓ s TRC failed to follow the policies requiring a TRC to
5033find a bid non - responsive if it does not contain all mandatory
5046information and if it is non - compliant with the design and
5058construction criteria defined in the RFP.
506473 . The RFP here requested some preliminary information and
5074allowed the Department to ask clarifying questions before
5082announ cing the award. The RFP allows the Department to waive
5093minor irregularities. It does not allow the Depart to waive or
5104ignore information that is mandatory on its face.
511274 . In Robinson Electrical Co. v. Dade County , 417 So. 2d
51241032, 1034 (Fla. 3d DCA 1982), the court set forth the analysis
5136for determining what constitutes a material variance or
5144irregularity as follows:
5147In determining whether a specific
5152noncompliance constitutes a substantial and
5157hence nonwaivable irregularity, the courts
5162have applied t wo criteria - first, whether
5170the effect of a waiver would be to deprive
5179the [government entity] of its assurance that
5186the contract will be entered into, performed
5193and guaranteed according to its specified
5199requirements, and second, whether it is of
5206such a n ature that its waiver would adversely
5215affect competitive bidding by placing the
5221bidder in a position of advantage over other
5229bidders or by otherwise undermining the
5235common standard of competition.
523975 . MillerÓ s proposal contains a material variation fr om
5250the RFP specifications that the Department could not waive.
5259Specifically, the omission of preliminary listing of the
5267categories for the Schedule of Values was a mandatory requirement
5277t hat the TRC overlooked. MillerÓ s failure to include this
5288informatio n was fatal to the responsiveness of Miller's proposal.
5298In other words, it deprived FDOT of its assurance that the
5309contract will be entered into, performed and guaranteed according
5318to its "specified requirements."
532276 . The fa ilure of the TRC to find Mill erÓ s proposal non -
5338responsive based on the missin g schedule was contrary to FDOTÓ s
5350rules, policies, and/or the solicitation specifications. The
5357Department's contract award to Miller was clearly erroneous,
5365arbitrary and capricious, because the TRC did not r equire all
5376mandatory information to be included in the proposal. Instead,
5385the TR C looked only to whether MillerÓ s technical proposal
5396conformed to the "intent" of the RFP. See Coin Landry Equip. Co.
5408v. The University of West Florida , Case No. 96 - 0962BID ( DOAH
5421July 5, 1996)("The failure of a public entity to follow its own
5434bid specifications is an arbitrary and capricious act and
5443undermines the integrity of the bid process.") .
545277 . In all other respects , it is arguable that the TRC
5464properly waived other mi nor i rregularities in MillersÓ proposal.
5474As to the cantilevered sign supports, construction schedule, new
5483conduit, splice boxes, guardrails, and warranties, the TRC could
5492read the proposal as a whole to find that it was responsive.
5504RECOMMENDATION
5505Based o n the Foregoing Findings of Fact and Conclusions of
5516Law, it is
5519RECOMMENDED:
5520That the Department of Transportation enter a final order
5529rescinding its intended award to Miller, finding Miller Ó s
5539proposal non - responsive, and providing for review of ALSÓ
5549pro posal by FDOTÓ s TRC.
5555DONE AND ENTERED this 1st day of Dec ember , 2010, in
5566Tallahassee, Leon County, Florida.
5570S
5571SUZANNE F. HOOD
5574Administrative Law Judge
5577Division of Administrative Hearings
5581The DeSoto Building
55841230 Apalachee Parkway
5587Tallahassee , Florida 32399 - 3060
5592(850) 488 - 9675
5596Fax Filing (850) 921 - 6847
5602www.doah.state.fl.us
5603Filed with the Clerk of the
5609Division of Administrative Hearings
5613this 1st day of Dec em ber, 2010.
5621COPIES FURNISHED :
5624C. Denise Johnson, Esquire
5628Department of Transportation
5631Haydon Burns Building, Mail Station 58
5637605 Suwannee Street
5640Tallahassee, Florida 32399 - 0450
5645Karen D. Walker, Esquire
5649Holland & Knight, LLP
5653315 South Calhoun Street, Suite 600
5659Tallahassee, Florida 32301
5662Anthony B. Zebouni, Esquire
5666Regan Zebouni & Walker, P.A.
56719905 Old St. Augustine Road, Suite 400
5678Jacksonville, Florida 32257
5681Deanna Hurt, Clerk of Agency Proceedings
5687Department of Transportation
5690Haydon Burns Building, Mail Station 57
5696605 Suwannee Street
5699Tallahassee, Florida 32399 - 0450
5704Stephanie C. Kopel ousos, Secretary
5709Department of Transportation
5712Haydon Burns Building, Mail Station 57
5718605 Suwannee Street
5721Tallahassee, Florida 32399 - 0450
5726Alexis M. Yarbrough, General Counsel
5731Department of Transportation
5734Haydon Burns Building, Mail Station 58
5740605 Suwannee Street
5743Tallahassee, Florida 32399 - 0450
5748NOTICE OF RIGHT TO SUBMIT EXCEPTIONS
5754All parties have the right to submit written exceptions within
576410 days from the date of this recommended order. Any exceptions to
5776this recommended ord er should be filed with the agency that will
5788issue the final order in this case.
- Date
- Proceedings
- PDF:
- Date: 12/01/2010
- Proceedings: Recommended Order (hearing held September 16 and October 1, 2010). CASE CLOSED.
- PDF:
- Date: 12/01/2010
- Proceedings: Recommended Order cover letter identifying the hearing record referred to the Agency.
- PDF:
- Date: 10/29/2010
- Proceedings: Motion to Accept Late Filling of Intervenor's Recommended Order filed.
- Date: 10/14/2010
- Proceedings: Transcript of Proceedings Volume I-II (not available for viewing) filed.
- Date: 10/01/2010
- Proceedings: CASE STATUS: Hearing Held.
- Date: 09/30/2010
- Proceedings: Transcript of Proceedings Volume I and II (not available for viewing) filed.
- PDF:
- Date: 09/17/2010
- Proceedings: Order Granting Continuance and Re-scheduling Hearing (hearing set for October 1, 2010; 9:00 a.m.; Tallahassee, FL).
- Date: 09/16/2010
- Proceedings: CASE STATUS: Hearing Partially Held; continued to October 1, 2010; 9:00 a.m.; Tallahassee, FL.
- PDF:
- Date: 09/13/2010
- Proceedings: Respondent's Answers to Petitioner's First Set of Interrogatories filed.
- PDF:
- Date: 09/13/2010
- Proceedings: Notice of Filing Respondent's Answers to Petitioner's First Set of Interrogatories.
- PDF:
- Date: 09/09/2010
- Proceedings: Petitioner, American Lighting and Signalization, Inc's Notice of Service of Objections and Responses to Respondent, Department of Transportation's First Set of Interrogatories filed.
- PDF:
- Date: 09/08/2010
- Proceedings: Notice of Taking Deposition (Dale Cody, P.E., Lirk Townsend) filed.
- PDF:
- Date: 09/03/2010
- Proceedings: Notice of Serving Respondent, Department of Transportation's, First Set of Interrogatories to Petitioner filed.
- PDF:
- Date: 09/02/2010
- Proceedings: Amended Notice of Taking Deposition (Jerry Ausher, John Kell, Kathy Thomas) filed.
- PDF:
- Date: 09/02/2010
- Proceedings: Amended Notice of Taking Deposition (Any Williams, Richard Moss, Pastsy Elkins) filed.
- PDF:
- Date: 08/30/2010
- Proceedings: Respondent's Notice of Serving Answers to Petitioner's First Set of Interrogatories filed.
- PDF:
- Date: 08/25/2010
- Proceedings: American Lighting and Signlization, Inc.'s First Request for Production of Documents to Respondent filed.
- PDF:
- Date: 08/24/2010
- Proceedings: Notice of Taking Depositions (Amy Williams, Richard Moss, and Patsy Elkins) filed.
- PDF:
- Date: 08/23/2010
- Proceedings: Petitioner's, American Lighting and Signalization, Inc., First Request for Admissions to Respondent filed.
- PDF:
- Date: 08/23/2010
- Proceedings: American Lighting and Signalization, Inc.'s First Set of Interrogatories to Respondent filed.
- PDF:
- Date: 08/18/2010
- Proceedings: Notice of Hearing (hearing set for September 16, 2010; 10:00 a.m.; Tallahassee, FL).
Case Information
- Judge:
- SUZANNE F. HOOD
- Date Filed:
- 08/17/2010
- Date Assignment:
- 08/17/2010
- Last Docket Entry:
- 01/03/2011
- Location:
- Tallahassee, Florida
- District:
- Northern
- Agency:
- ADOPTED IN TOTO
- Suffix:
- BID
Counsels
-
C. Denise Johnson, Esquire
Address of Record -
Karen D. Walker, Esquire
Address of Record -
Anthony B. Zebouni, Esquire
Address of Record -
Karen D Walker, Esquire
Address of Record -
C. Denise Johnson, Assistant General Counsel
Address of Record