17-000795
Suncoast Waterkeeper, Inc.; Florida Institute For Saltwater Heritage, Inc.; And Joseph Mcclash vs.
Long Bar Pointe, Lllp, And Department Of Environmental Protection
Status: Closed
Recommended Order on Tuesday, March 6, 2018.
Recommended Order on Tuesday, March 6, 2018.
1STATE OF FLORIDA
4DIVISION OF ADMINISTRATIVE HEARINGS
8SUNCOAST WATERKEEPER, INC.;
11FLORIDA INSTITUTE FOR SALTWATER
15HERITAGE, INC.; AND JOSEPH
19MCCLASH,
20Petitioners,
21vs. Case Nos. 17 - 0795
2717 - 0796
30LONG BAR POINTE, LLLP, AND
35DEPARTMENT OF ENVIRONMENTAL
38PROTECTION,
39Respo ndents.
41_______________________________/
42RECOMMENDED ORDER
44Administrative Law Judge D. R. Alexander conducted a
52hearing in these cases on December 5 and 6, 2017, in Sarasota,
64Florida.
65APPEARANCES
66For Petition ers: Ralf Gunars Brookes, Esquire
73(Suncoast and Ralf Brookes Attorney
78FISH) 1217 East Cape Coral Parkway
84Suite 107
86Cape Coral, Florida 33904 - 9604
92For Petitioner: Joseph McClash, pro se
98(McClash) 711 89th Street Northwest
103Bradenton, Florida 34209 - 9692
108For Respondent: Chris R. Tanner, Esquire
114(Long Bar) Amy Wells Brennan, Esquire
120Manson Bolves Donaldson Varn, P.A.
125Suite 300
127109 North Brush Street
131Tampa, Florida 33602 - 4167
136For Respondent: Marianna Sarkisyan, Esquire
141(Department) Department of Environmental Protection
146Mail Station 35
1493900 Commonwealth Boul evard
153Tallahassee, Florida 32399 - 3000
158STATEMENT OF THE ISSUE
162The issue is whether Long Bar Pointe, LLLP's (Long Bar),
172application for a Mitigation Bank/Environmental Resource Permit
179(ERP) to establish a mitigation bank on a 260.80 - acre coastal
191site located in western Manatee County should be approved.
200PRELIMINARY STATEMENT
202By letter dated December 16, 2017, the Department of
211Environmental Protection (Department) issued its Notice of
218Intent to Issue Mitigation Bank Permit No. 0338349 - 002 (Notice)
229authorizing Long Bar to establish the Long Bar Pointe Mitigation
239Bank on a 260.80 - acre site in Manatee County. The Notice
251indicates that a total of 18.01 potential mitigation bank
260credits will be awarded.
264Petitioners, Suncoast Waterkeeper, Inc. (Suncoast), and
270Florida Institute for Saltwater Heritage, Inc. (FISH), timely
278filed a Verified Petition challenging the agency action. After
287the initial pleading was dismissed by the Department, an Amended
297Verified Petition was filed. The matter was ref erred to the
308Division of Administrative Hearings (DOAH) and assigned Case
316No. 17 - 0795. Petitioner, Joseph McClash (McClash), also timely
326filed a Verified Petition challenging the same action. After
335his initial pleading was dismissed by the Department, a First
345Amended Verified Petition for Formal Administrative Hearing was
353filed. This filing was referred to DOAH and assigned Case
363No. 17 - 0796. The two cases were then consolidated.
373At the hearing, Petitioners jointly presented the testimony
381of seven witnes ses, including Mr. McClash. Also, Petitioners'
390Exhibits 1 through 47, 55 (treated as hearsay only), 63, 67
401(Land Use Map only), 78, and 81 (except the Key West photograph)
413were accepted in evidence. The remainder of Exhibit 67 and
423Exhibits 68, 69, and 75 were accepted on a proffer basis only.
435Long Bar presented the testimony of two witnesses. Long Bar
445Exhibits 1 through 12 were accepted in evidence. The Department
455presented no witnesses; however, Department Exhibit 1 was
463accepted in evidence. Finally, Joint Exhibit 1 was accepted in
473evidence.
474A two - volume Transcript of the hearing was prepared.
484Proposed findings of fact and conclusions of law were filed by
495the parties on February 16 and 19, 2018, and they have been
507considered in the preparation of t his Recommended Order.
516FINDING S OF FACT
520The Parties
5221. The Department is the state agency having concurrent
531jurisdiction with the water management districts for permitting
539mitigation banks pursuant to chapter 373, Florida Statutes.
547Pursuant to an opera ting agreement executed by the Department
557and the water management districts, the Department is
565responsible for reviewing and taking final agency action on this
575activity.
5762. Long Bar is a Florida limited liability limited
585partnership registered to do busi ness in the state. Its address
596is 1651 Whitfield Avenue, Sarasota, Florida.
6023. Suncoast has been registered as a nonprofit corporation
611in Florida since 2012. Its mission is to "protect and restore
622the Suncoast's waterways through enforcement, fieldwork,
628advocacy, and environmental education for the benefit of the
637communities that rely upon these precious coastal resources."
645Respondents have stipulated that at least 25 members reside
654within Manatee County.
6574. Suncoast's geographical area of interest is the coastal
666waters of Manatee and Sarasota Counties, including the waterways
675and coastline in the immediate area of the project site and
686within the proposed Mitigation Service Area (MSA) of the bank.
6965. Suncoast's representative, Mr. Merriam, testified that
703the organization has more than 800 members residing within
712Manatee County. However, he does not know the exact number of
723members who actually use the site or MSA and might reasonably be
735expected to be affected by the proposed activities. Moreover,
744h e was unaware of what activities the proposed permit actually
755authorizes that would adversely affect the interests of the
764members. After learning what activities are authorized by the
773permit, he admitted they have a beneficial purpose.
7816. FISH is an ac tive not - for - profit corporation in good
795standing since 1991 and has an address at 4515 124th Street
806West, Cortez, Florida. FISH owns and maintains real property,
815including coastal land within the village of Cortez. FISH also
825owns and maintains a wetland restoration/mitigation project
832known as the "FISH Preserve" property located in Cortez.
8417. The mission and goal of FISH includes the protection of
852the nature and natural resources within Manatee County,
860including Anna Maria Sound an d Perico Island located within the
871MSA. Respondents have stipulated that FISH has at least
88025 members who reside in Manatee County.
8878. According t o a representative of FISH, Mr. Stevely,
897there are more than 150 members who reside or own property in
909Manatee County. The numbe r who actually use and enjoy the
920natural resources located in the bank site and MSA is not known.
932Mr. Stevely could not explain how the activities authorized by
942the proposed permit would adversely affect its members. He also
952admitted that the removal of exotics, planting of native plants,
962and recording of a conservation easement (the only activities
971authorized by the permit) may actually benefit his environmental
980interests. Mr. Stevely asserted that the trimming of mangroves
989would adversely affect his in terests, but the permit, as
999proposed, does not authorize mangrove impacts. He speculated
1007that the proposed placement of buoys along the shoreline might
1017attract inexperienced boaters to the area, but admitted that
1026good channel marking is one of the best wa ys to protect
1038seagrasses. Moreover, the installation of buoys requires a
1046separate permit from the Florida Fish and Wildlife Conservation
1055Commission (FFWCC). Presumably, a point of entry to contest
1064that action will be provided by the agency.
10729. Mr. McCla sh is a resident of Bradenton who uses the
1084waters in the vicinity of the project site for fishing,
1094crabbing, boating, and wildlife observation. He contends the
1102informational buoys will attract inexperienced boaters to the
1110area, who will harm the seagrasse s. He is also concerned that
1122if the application is approved, other ERPs may be issued in the
1134future and their impacts could potentially be offset by the
1144purchase of credits from the Project.
1150The Project Site
115310. The property designated to become the miti gation bank
1163is a 260.80 - acre site located in western Manatee County, west of
1176El Conquistador Parkway and 75th Street West, and an adjacent
1186unsurveyed portion of Sarasota Bay, an Outstanding Florida Water
1195(OFW), Class II Waters. Around half of the site is adjacent to
1207agricultural lands that may be developed with a mixed use
1217residential/commercial project. The other half is contiguous
1224with Sarasota Bay and/or existing conservation lands. The
1232project site has more than two miles of shoreline making it the
1244l argest continuous mangrove shoreline along Sarasota Bay. The
1253site is near other properties with high ecological value, such
1263as Emerson Point, Robinson Preserve, Neal Preserve, Tidy Island,
1272Sister Keys, and Legends Bay. All of these properties are
1282conserv ation lands. Long Bar has a sufficient real property
1292interest to conduct the proposed activities.
129811. Based on historical aerial photography, the area
1306encompassing the Project site has remained essentially
1313undeveloped since 1944, with the exception of mosquito ditching
1322that was conducted in the northwestern portion of the property
1332from the 1940s to the 1970s, and agricultural ditching that has
1343occurred adjacent to and within some portions of the site.
135312. The site is dissected by four, approximately 3 0 - foot -
1366wide strips of land owned by Manatee Fruit Company (MFC), which
1377are excluded from the credit assessment. However, Long Bar has
1387sufficient ownership interest in the MFC strips of land and will
1398be required to maintain the area free of debris and nuis ance and
1411exotic vegetation.
141313. The Town of Longboat Key also has a 30 - foot - wide
1427easement in the southeastern portion of the site, which will be
1438preserved, enhanced, and maintained similar to the adjacent area
1447of the project site , but is excluded from th e credit
1458assessment.
145914. The project site consists of privately - owned submerged
1469Sarasota Bay bottomlands that are dominated by seagrasses;
1477mangrove swamps; mangrove hedges; areas of salt marsh/saltern;
1485coastal freshwater herbaceous wetlands; and areas of coastal
1493uplands (maritime hammock).
149615. The seagrass areas are dominated by shoal grass with
1506patches of turtle grass in deeper pockets. The mangrove areas
1516are predominately black mangroves, mixed with red mangroves
1524closer to the shoreline and with whit e mangroves in the more
1536landward mangrove areas. Red mangroves increase in dominance in
1545the vicinity of the mosquito ditches in the northwestern portion
1555of the site, and white mangroves increase in dominance in the
1566formerly disturbed portions of the site. The salt marsh/saltern
1575area is generally open and sandy, but supports some herbaceous
1585vegetation, such as buttonwood, glasswort, and saltwort. The
1593coastal freshwater herbaceous wetlands and much of the coastal
1602uplands are currently dominated by a near m onoculture of
1612invasive exotic Brazilian Pepper, though areas of intact
1620maritime hammock remain. Brazilian Pepper is present in the
1629ecotone areas (the transition area between two communities)
1637between the freshwater herbaceous and mangrove swamp assessment
1645areas. There are also spoil mounds within the mangrove swamp
1655assessment areas.
1657Mitigation Bank Permits
166016. Section 373.403(19), Florida Statutes, defines a
1667mitigation bank as "a project permitted under Section 373.4136,
1676F.S. undertaken to provide for the withdrawal of mitigation
1685credits to offset adverse impacts authorized" by an ERP issued
1695under Part IV, chapter 373. A mitigation bank permit is a type
1707of ERP. See Fla. Admin. Code R. 62 - 330.301(3).
171717. Section 373.4136(1) authorizes the Department an d
1725water management districts to require an ERP to establish,
1734implement, and operate a mitigation bank. A bank acts as a
1745repository for wetland mitigation credits that can be used to
1755offset adverse impacts to wetlands that occur as the result of
1766future ERP projects. A bank is designed to "enhance the
1776certainty of mitigation and provide ecological value due to the
1786improved likelihood of environmental success associated with
1793their proper construction, maintenance, and management," often
1800within larger, contig uous, and intact ecosystems.
180718. Mitigation banks are intended to "emphasize the
1815restoration and enhancement of degraded ecosystems and the
1823preservation of uplands and wetlands as intact ecosystems." Id.
1832Therefore, the Department and the water managem ent districts are
1842directed to participate in and encourage the establishment of
1851mitigation banks. Id.
185419. A mitigation bank is to be awarded a number of
1865mitigation credits by the permitting agency. § 373.4136(4),
1873Fla. Stat. A mitigation credit is a "st andard unit of measure
1885which represents the increase in ecological value resulting from
1894restoration, enhancement, preservation, or creation activities."
1900Fla. Admin. Code R. 62 - 345.200(8). The number of credits must
1912be "based upon the degree of improvemen t in ecological value
1923expected to result from the establishment and operation of the
1933mitigation bank as determined using a functional assessment
1941methodology." § 373.4136(4), Fla. Stat. In this case, the
1950Department is proposing to issue 18.01 credits.
1957Mit igation Service Area (MSA)
196220. Rule 62 - 342.600 requires the establishment of a MSA
1973for a mitigation bank. An MSA is a geographical area within
1984which adverse impacts may be offset by the bank credits. A
1995single MSA is proposed for the Project, covering bo th freshwater
2006and saltwater credits. The MSA includes portions of Charlotte,
2015Manatee, and Sarasota Counties within the South Coastal Drainage
2024Basin and portions of the Manatee River Basin west of Interstate
203575 and the portion of the Tampa Bay Drainage Bas in located west
2048of Interstate 75 and south and west of Interstate 275. Credits
2059are not allowed for use outside the MSA, except as provided for
2071by section 373.4136(6)(d).
2074Criteria for a Mitigation Bank
207921. Besides statutory criteria in section 373.4136(1) , a
2087maze of Department rules applies to the creation of a mitigation
2098bank. Pertinent to this case, rule 62 - 342.400 sets forth
2109criteria specifically applicable to a mitigation bank.
2116Rule 62 - 330.301 sets forth criteria for the issuance of an ERP,
2129while ru le 62 - 330.302 establishes additional ERP criteria that
2140form the basis for the public interest test. In the Joint Pre -
2153hearing Stipulation, Petitioners agree that only the criteria in
2162rule 62 - 330.301(1)(d) and (f), rule 62 - 330.302(1)(a)2., 4.,
2173and 5., and r ule 62 - 342.400(1)(a) - (f) are at issue. Petitioners
2187also agree that Long Bar has provided reasonable assurance in
2197regards to all requirements of financial responsibility.
2204The Project
220622. Long Bar submitted to the Department its application
2215for a permit o n September 12, 2016. After additional
2225information was submitted, the application was deemed complete
2233on December 16, 2016. See Fla. Admin. Code R. 62 - 342.450.
224523. The majority of the site is mangrove swamp and
2255privately owned submerged seagrass bottoml ands that are proposed
2264for preservation only. The site also contains areas of coastal
2274freshwater marsh and coastal uplands that are currently degraded
2283by invasive exotic vegetation which will be enhanced through
2292removal of invasive exotic vegetation, plan ting of desirable
2301vegetation, and implementation of a perpetual management plan.
2309No wetland creation or dredging or filling activities are
2318proposed for the Project.
232224. The Project has the potential to generate several
2331credit types, including seagrass, m angrove swamp, mangrove
2339hedge, salt marsh/saltern, and freshwater herbaceous credits.
2346The credit release schedule provides for an initial credit
2355release upon recordation of a conservation easement and
2363establishment of financial assurance mechanisms, follo wed by a
2372series of potential credit releases based on satisfactory
2380completion of specified mitigation activities, and a final
2388credit release once all success criteria are met.
239625. Prior to the release of credits, the site will be
2407preserved by a conservati on easement in favor of the Department
2418and Southwest Florida Water Management District. Long Bar will
2427establish financial assurance performance bonds for construction
2434and implementation and perpetual management. Financial
2440assurance is required to ensure the Project reaches success, it
2450remains in compliance, and the perpetual management activities
2458have a dedicated funding source.
246326. In addition to protection provided by the conservation
2472easement, Long Bar proposes implementation of a Seagrass
2480Information al Buoy Placement Plan (Plan) in an effort to provide
2491additional protection to the submerged seagrass beds within and
2500in the vicinity of the Project. The Plan contemplates the
2510installation of non - regulatory seagrass information buoys at
2519approximately the three - foot bathymetric contour along the
2528Project site, and which follows the path of the traditional
2538unmarked navigational channel where they can be readily seen.
2547The buoys will inform boaters of the presence of seagrasses
2557surrounding the Project site, wh ich support significant
2565estuarine habitats and can be harmed or destroyed from vessel
2575groundings or prop scarring. Installation of the buoys will
2584provide a significant public benefit in that it should
2593significantly reduce or eliminate prop scars within th e seagrass
2603beds along the project site. Good channel marking is one of the
2615best ways to protect seagrasses from prop scarring. There is no
2626credible evidence that signage will attract inexperienced
2633boaters who will damage the seagrasses in the area.
264227. The permit does not authorize the installation of the
2652buoys. In order to implement the Plan, Long Bar must apply to
2664the FFWCC for a Uniform Waterways Markers in Florida Waters
2674permit. The Plan must be implemented prior to credit release.
268428. No mangrove trimming is authorized by the permit.
2693Pursuant to a Conceptual Mangrove Trimming Plan, attached to the
2703permit as Attachment A, Long Bar has reserved the right to trim
2715approximately 30 percent of the onsite mangrove acreage to a
2725minimum height of 12 feet, as measured from the substrate. No
2736trimming will be allowed within the Project's mangrove swamps
2745that are greater than 500 feet in width from the shoreline, and
2757no trimming can result in fragmentation of the remaining intact
2767mangrove forest into more tha n four individual fragments. Prior
2777to the initial release of credits, Long Bar must develop and
2788submit a Final Mangrove Trimming Plan and modify the permit to
2799substitute the final plan for the conceptual plan, adjust the
2809assessment area configuration and acreages, and recalculate the
2817total potential mitigation credits.
282129. Any mangrove trimming must be conducted by a licensed
2831professional mangrove trimmer and take place under a mangrove
2840trimming permit issued pursuant to section 373.327 that may be
2850issu ed at some time in the future by the Department if
2862applicable criteria are met. Long Bar's reserved right to
2871conduct limited mangrove trimming was accounted for in the
2880credit scores.
288230. Many of the current communities on the site are
2892generally similar t o the types of communities that would have
2903been present historically, but have been adversely affected by
2912invasion of nuisance and exotic vegetation, including Brazilian
2920Pepper and Australian Pine. As such, the Project also involves
2930a number of enhancemen t activities on the site. Approximately
294017.35 acres of degraded coastal freshwater marsh will be
2949enhanced by removing invasive exotic vegetation and replanting
2957with appropriate native vegetation. Approximately 13.13 acres
2964of degraded coastal uplands will be enhanced by removing
2973invasive exotic vegetation and replanting with appropriate
2980native vegetation. Approximately 6.44 acres of relatively
2987intact coastal uplands will be enhanced by removing nuisance
2996vines and exotic vegetation. All areas of preserved mangroves
3005and salt marsh/saltern will be treated to remove existing low
3015levels of nuisance and invasive exotic vegetation. Upon
3023implementation and planting, the permit requires Long Bar to
3032conduct "time zero" monitoring to establish a baseline for use
3042in future monitoring events to determine whether success
3050criteria have been achieved.
305431. Although the proposed activities are expected to
3062maintain and enhance site conditions in perpetuity, Long Bar
3071will employ other strategies, based on continual evaluati on of
3081environmental data collected from the site, to ensure the goals
3091of the Project continue to be met in perpetuity.
310032. Long Bar will implement a Security Plan to take all
3111measures necessary to ensure the integrity of the Project is
3121upheld in perpetuit y. Large hole 50 - inch high hog fencing will
3134be installed at the Project boundary where it interfaces with
3144offsite areas to ensure separation and protection from any
3153future development on adjacent lands. Fencing will act as a
3163barrier to deter trespassing, but will still allow wildlife to
3173move across and into the Project site. Conservation easement
3182signage will also be installed at a minimum of every 300 feet,
3194and at every bank boundary turn along the fence line. The buoy
3206plan is also part of the Security Plan. Long Bar will conduct
3218quarterly inspections of the fencing and signage, as well as
3228Project site lands, and will repair or replace fencing as soon
3239as the need is discovered. Any trash and other debris will be
3251removed during site inspections either by hand or by a method
3262that minimizes disturbances to Project lands. If habitat
3270impacts are discovered during an inspection, adaptive management
3278actions will be implemented.
328233. After the Project's final success criteria are met,
3291the Perpetual Management Plan will ensure that the Project is
3301managed by Long Bar in a manner that ensures all permit
3312conditions are maintained. The Perpetual Management Plan
3319includes quarterly inspections of the Project site, including
3327security measures.
3329The Calculation of Cred its
333434. In 2004, the Department adopted chapter 62 - 345, the
3345Uniform Mitigation Assessment Method (UMAM) rule, which provides
3353a standardized procedure for assessing the functions provided by
3362wetlands and other surface waters, the amount those functions
3371are decreased by a proposed project, and the amount of
3381mitigation necessary to offset that loss. UMAM is the sole
3391means for determining the amount of mitigation credits to be
3401awarded to mitigation banks and applied to Long Bar.
341035. When applying UMAM, rea sonable scientific judgment
3418must be used. Therefore, even though UMAM is a standardized
3428procedure, UMAM is not a precise assessment, and in the exercise
3439of reasonable scientific judgment, two scientists can arrive at
3448different results.
345036. In general t erms, the UMAM analysis consists of two
3461parts. Part I is a qualitative characterization of the
3470property, which divides the property into assessment areas.
3478Part II assigns mitigation bank credits to those areas based on
3489scoring criteria established in UMA M.
349537. The mitigation proposal was assessed by the Department
3504using UMAM. The Department determined that the Project had the
3514potential to generate a total of 18.01 credits. These credits
3524are differentiated as 7.38 for seagrass - dominated submerged
3533botto mlands, 0.23 for salt marsh/saltern, 7.07 for mangrove
3542swamps, 0.68 for trimmed mangrove hedge, and 2.65 for coastal
3552freshwater marsh.
355438. The environmental communities present at the site are
3563subdivided into 47 different assessment areas. The assessment
3571areas were established by Long Bar's expert, Mr. Hoffner, who
3581has worked on the Project since 2014 and has spent hundreds of
3593hours evaluating the site. The assessment areas were generally
3602grouped into seagrass, mangrove, saltwater, salt marsh,
3609freshwater marsh, and uplands, and then sub - assessed based on
3620their proximity to different habitats and different activities
3628within the bank.
363139. Assessment area boundaries were based upon aerial
3639photography interpretation, the Florida Land Use, Cover and
3647Forms C lassification System, habitat map, Natural Resources
3655Conservation Service soil maps, site inspections, formal
3662wetlands jurisdiction determination, surveys performed by
3668professional land surveyors, field verification, and reasonable
3675scientific judgment. Th e record shows that ecotone community
3684boundaries in the environment do not often have distinct lines
3694of demarcation and two adjacent communities can be identified as
3704unique assessment areas and yet have ecotone areas that share
3714characteristics of both comm unities. For example, Brazilian
3722Pepper is present within the ecotone areas between the mangrove
3732and freshwater marsh assessment areas.
373740. The Department's expert, Mr. Rach, verified the
3745boundaries of the bank and assessment areas both in the field
3756and t hrough aerial photographs and descriptions provided by the
3766applicant. Mr. Rach reiterated that the determination of
3774assessment areas is not an exact science and requires the use of
3786scientific judgment. He determined that Long Bar provided
3794sufficient info rmation for each assessment area to be evaluated
3804under the second part of the UMAM analysis and that they provide
3816an appropriate frame of reference to use in the Part II
3827evaluation.
382841. While Petitioners' expert, Mr. Hull, disagreed with
3836the assessment ar ea boundaries, he agreed that UMAM is not an
3848exact science. He conceded that he was not sure whether he
3859visited every assessment area on the site, and he was unable to
3871provide an explanation of where he believed each specific
3880boundary should be located.
38844 2. Petitioners did not establish by a preponderance of
3894the evidence that the assessment areas are in contravention of
3904Department rules.
390643. The Department's scoring of the Project was determined
3915by review of the UMAM scores provided by Long Bar, review o f
3928available information provided, numerous discussions with Long
3935Bar, and field work. The Department's summary of the credit
3945evaluation for each of the 47 assessment areas is contained in
3956Condition 11 of the permit and is accepted as being the most
3968persua sive on this issue. The actual scores for each assessment
3979area are contained in Exhibit H of the draft permit.
398944. While Mr. Hull disagreed with the scoring of the
3999project, the difference between his and Long Bar's numbers are a
4010reflection in the differe nce in the application of reasonable
4020scientific judgment.
402245. Petitioners failed to prove by a preponderance of the
4032evidence that the Department's determination that the project
4040could generate 18.01 credits was incorrect.
4046Petitioners' Objections
404846. In their PROs, Petitioners raise three broad
4056objections. First, they contend that no credits should be
4065awarded to Long Bar for seagrasses, or that a much smaller
4076number is appropriate. Second, they contend fewer credits
4084should be awarded for areas where ma ture mangroves that are
409540 to 50 feet in height could be trimmed to 12 feet simply to
4109provide a view for future residents of the adjacent upland
4119residential development conceptually proposed by Long Bar.
4126Finally, they contend the site is bisected by a 100 - foot gap
4139that is excluded from the bank because Long Bar intends to allow
4151future access from the planned adjacent upland residential
4159development to the shoreline. They argue that by creating this
4169gap, Long Bar fails to maintain an intact ecosystem. Give n
4180these considerations, Suncoast and FISH contend that no more
4189than 4.18 mitigation credits shoul d be awarded, while
4198Mr. McClash argues that the application should be denied.
420747. As to the first issue, Petitioners generally contend
4216that in the seagrass a reas, the bank is focused on preservation
4228only, and not restoration, and therefore no additional
4236protection or functional lift will be provided for any seagrass
4246assessment areas. To begin with, preservation is a goal
4255expressly included in the UMAM rule, w hich emphasizes
4264preservation of undegraded areas and restoration of degraded
4272systems over alteration of existing landscapes to create
4280artificial wetlands. The proposed conservation easement
4286increases protection to the wetlands and other surface waters in
4296the site by preventing structures (such as docks or piers)
4306within the seagrass assessment areas. If the site is not
4316preserved, it is likely to be used to access Sarasota Bay from
4328the uplands. As previously found, there will also be
4337enhancement activities in adjacent assessment areas. In short,
4345the steps being proposed by Long Bar provide additional
4354protection to the seagrasses. The UMAM seagrass score is
4363appropriate.
436448. As to the second issue, no mangrove trimming is
4374authorized by the permit. Long Ba r has, however, reserved the
4385right to modify the permit to trim approximately 30 percent of
4396the onsite mangrove acreage to a minimum height of 12 feet, as
4408measured from the substrate. The potential trimming was
4416properly accounted for in the UMAM scores. If Long Bar chooses
4427not to implement the proposed trimming, it would likely receive
4437more credits. Notably, no trimming can result in fragmentation
4446of the remaining intact mangrove forest into more than four
4456individual fragments. And prior to the release of credits, Long
4466Bar must develop and submit a final mangrove trimming plan and
4477modify the permit, adjust the assessment area configuration and
4486acreages, and recalculate the total potential mitigation
4493credits. Petitioners did not prove by a preponderance of the
4503evidence that mangrove trimming affects the Department's
4510assessment of the number of credits to be awarded.
451949. Finally, the exclusion of a 100 - foot gap from the
4531conservation easement does not diminish the value of the bank as
4542an intact system as a whole. While this area will not be
4554included in the recorded plans, this will not fragment an intact
4565ecosystem. No construction is proposed in the gap, and current
4575Manatee County regulations do not allow for dredging in this
4585area. Therefore, wildlife u tilizing the site will be able to
4596continue to utilize the excluded area and traverse the gap,
4606regardless of the lines drawn on a set of plans. The net effect
4619of the Project is to preserve approximately two miles of intact
4630shoreline. The more persuasive e vidence supports a finding that
4640the 100 - foot wide strip does not affect the overall suitability
4652of the site as a mitigation bank. Petitioners did not prove by
4664a preponderance of the evidence that the so - called "gap" impacts
4676the number of credits to be awa rded.
4684Compliance with Applicable Criteria
468850. The preponderance of the evidence supports a finding
4697that Long Bar has satisfied all criteria in rule 62 - 330.301 for
4710the issuance of an ERP.
471551. The preponderance of the evidence supports a finding
4724that Long Bar has established that the Project is clearly in the
4736public interest, as required by rule 62 - 330.302(1).
474552. The preponderance of the evidence supports a finding
4754that Long Bar has satisfied all criteria for establishing a
4764mitigation bank, as required by rule 62 - 342.400 .
4774CONCLUSIONS OF LAW
477753. Suncoast and FISH allege standing to initiate this
4786proceeding under chapter 120 and section 413.412(6).
4793Respondents have stipulated that the facts established by the
4802two organizations provide standing under sec tion 403.412(6).
481054. For an association to establish standing under
4818section 120.57(1) when acting solely as a representative of its
4828members, it must demonstrate that a substantial number of its
4838members, although not necessarily a majority, are substant ially
4847affected by the challenged action, that the subject matter of
4857the challenged action is within the association's general scope
4866of interest and activity, and that the relief requested is of a
4878type appropriate for an association to receive on behalf of its
4889members. See , e.g. , St. John's Riverkeeper, Inc. v. St. Johns
4899River Water Mgmt. Dist. , 54 So. 3d 1051, 1054 (Fla. 5th DCA
49112011); Fla. League of Cities, Inc. v. Dep't of Envtl. Reg. , 603
4923So. 2d 1363 (Fla. 1st DCA 1992). Suncoast and FISH have failed
4935t o quantify the number of members that reside in the area of the
4949Project that might reasonably be expected to be affected by the
4960proposed activities. Therefore, they have no standing under
4968chapter 120.
497055. Mr. McClash alleges he has standing under chapter 120
4980as a person whose substantial interests are affected by the
4990proposed issuance of the permit. Here, the evidence shows that
5000Mr. McClash is concerned with activities contemplated, but not
5009authorized, by the permit, and future ERPs that may have impacts
5020that could potentially be offset through the purchase of credits
5030from the Project. These concerns will not result in a direct
5041injury or place Mr. McClash in an immediate danger of sustaining
5052a direct injury as a result of the agency action. His concern
5064is with future permit impacts, which are too speculative and
5074remote to give rise to standing under chapter 120.
508356. Petitioners have challenged the issuance of a
5091mitigation bank permit issued under chapter 373. Therefore,
5099section 120.569(2)(p) is applica ble. Under this provision, the
5108permit applicant must present a prima facie case demonstrating
5117entitlement to the permit. Thereafter, a third party
5125challenging the issuance of the permit has the burden "of
5135ultimate persuasion" and the burden "of going for ward to prove
5146the case in opposition to the . . . permit." If the third party
5160fails to carry its burden, the applicant prevails by virtue of
5171its prima facie case.
517557. Issuance of the permit is dependent upon there being
5185reasonable assurance that the mit igation bank will meet
5194applicable statutory and regulatory standards. § 373.4136(1),
5201Fla. Stat.
520358. Reasonable assurance means "a substantial likelihood
5210that the project will be successfully implemented." See Metro.
5219Dade Cnty. v. Coscan Fla., Inc. , 609 So. 2d 644, 648 (Fla. 3d
5232DCA 1992). Reasonable assurance does not require absolute
5240guarantees that the applicable conditions for issuance of a
5249permit have been satisfied.
525359. Long Bar made its prima facie case of entitlement to
5264the permit. Therefore, th e burden of ultimate persuasion is on
5275Petitioners to prove their case in opposition to the permit by a
5287preponderance of the competent and substantial evidence.
5294Having failed to do so, Long Bar must prevail.
530360. In summary, Long Bar has provided reasonab le assurance
5313that all relevant criteria for the issuance of an ERP and
5324establishment of a mitigation bank have been satisfied.
5332RECOMMENDATION
5333Based on the foregoing Findings of Fact and Conclusions of
5343Law, it is
5346RECOMMENDED that the Department of Envi ronmental Protection
5354enter a final order approving the issuance of Mitigation Bank
5364Permit No. 0338349 - 002 to Long Bar.
5372DONE AND ENTERED this 6th day of March , 2018 , in
5382Tallahassee, Leon County, Florida.
5386S
5387D. R. ALEXANDER
5390Administrative Law Judge
5393Division of Administrative Hearings
5397The DeSoto Building
54001230 Apalachee Parkway
5403Tallahassee, Florida 32399 - 3060
5408(850) 488 - 9675
5412Fax Filing (850) 921 - 6847
5418www.doah.state.fl.us
5419Filed with the Clerk of the
5425Division of Administrative H earings
5430this 6th day of March , 2018 .
5437COPIES FURNISHED:
5439Joseph McClash
5441711 89th Street Northwest
5445Bradenton, Florida 34209 - 9692
5450(eServed)
5451Ralf Gunars Brookes, Esquire
5455Ralf Brookes Attorney
5458Suite 107
54601217 East Cape Coral Parkway
5465Cape Coral, Florida 33904
5469(eServed)
5470Douglas P. Manson, Esquire
5474Manson Bolves Donaldson, Varn P.A.
5479Suite 300
5481109 North Brush Street
5485Tampa, Florida 33602
5488(eServed)
5489Marianna Sarkisyan, Esquire
5492Department of Environmental Protection
5496Mail Station 35
54993900 Commonwealth Boulevard
5502Talla hassee, Florida 32399 - 3000
5508(eServed)
5509Chris R. Tanner, Esquire
5513Manson Bolves Donaldson, Varn P.A.
5518Suite 300
5520109 North Brush Street
5524Tampa, Florida 33602
5527(eServed)
5528Edward Vogler, II, Esquire
5532Vogler Ashton, PLLC
55352411 - A Manatee Avenue West
5541Bradenton, Florid a 34205 - 4948
5547(eServed)
5548Noah Valenstein, Secretary
5551Department of Environmental Protection
5555Douglas Building
55573900 Commonwealth Boulevard
5560Tallahassee, Florida 32399 - 3000
5565(eServed)
5566Lea Crandall, Agency Clerk
5570Department of Environmental Protection
5574Mail Stat ion 35
55783900 Commonwealth Boulevard
5581Tallahassee, Florida 32399 - 3000
5586(eServed)
5587Robert A. Williams, General Counsel
5592Department of Environmental Protection
5596Legal Department, Suite 1051 - J
5602Douglas Building, Mail Station 35
5607Tallahassee, Florida 32399 - 3000
5612(eSe rved)
5614Amy Wells Brennan, Esquire
5618Manson Bolves Donaldson Varn, P.A.
5623Suite 300
5625109 North Brush Avenue
5629Tampa, Florida 33602 - 2637
5634NOTICE OF RIGHT TO SUBMIT EXCEPTIONS
5640All parties have the right to submit written exceptions within
565015 days from the date of this Recommended Order. Any exceptions
5661to this Recommended Order should be filed with the agency that
5672will issue the Final Order in this case.
- Date
- Proceedings
- PDF:
- Date: 04/27/2018
- Proceedings: Department of Environmetal Protection's Responses to Petitioner McClash's Exceptions to Recommended Order filed.
- PDF:
- Date: 04/27/2018
- Proceedings: Respondent Long Bar Pointe, LLLP's Response to McClash's Exceptions to Recommended Order filed.
- PDF:
- Date: 04/27/2018
- Proceedings: Petitioner Joseph McClash Exceptions to Proposed Recommended Order filed.
- PDF:
- Date: 04/27/2018
- Proceedings: Florida Department of Environmental Protection's Exceptions to Recommended Order filed.
- PDF:
- Date: 03/06/2018
- Proceedings: Recommended Order (hearing held December 5 and 6, 2017). CASE CLOSED.
- PDF:
- Date: 03/06/2018
- Proceedings: Recommended Order cover letter identifying the hearing record referred to the Agency.
- Date: 02/22/2018
- Proceedings: Petitioner's Proposed Exhibits filed (exhibits not available for viewing).
- PDF:
- Date: 02/16/2018
- Proceedings: Respondent Long Bar Pointe, LLLP's Proposed Recommended Order filed.
- PDF:
- Date: 02/16/2018
- Proceedings: Respondent Long Bar Pointe, LLLP's Proposed Recommended Order filed.
- PDF:
- Date: 02/16/2018
- Proceedings: Petitioner Joseph McClash Proposed Recommended Order (filed in Case No. 17-000796).
- PDF:
- Date: 02/16/2018
- Proceedings: Suncoast Waterkeeper, Inc. and Florida Institute for Saltwater Heritage, Inc.'s Proposed Recommended Order filed.
- PDF:
- Date: 02/16/2018
- Proceedings: Department of Environmental Protection's Proposed Recommended Order (filed in Case No. 17-000796).
- Date: 01/17/2018
- Proceedings: Transcript of Proceedings Volumes 1-2 (not available for viewing) filed.
- PDF:
- Date: 01/17/2018
- Proceedings: Letter to Judge Alexander from Betsy Ridenour Regarding Filing of Hearing Transcripts filed.
- PDF:
- Date: 12/06/2017
- Proceedings: Petitioner Joseph McClash Notice of Subpoenas Issued for Testimony at the Hearing (filed in Case No. 17-000796).
- Date: 12/05/2017
- Proceedings: CASE STATUS: Hearing Held.
- PDF:
- Date: 11/07/2017
- Proceedings: Notice of Appearance (Amy Brennan) (filed in Case No. 17-000796).
- PDF:
- Date: 10/17/2017
- Proceedings: Amended Notice of Hearing (hearing set for December 5 through 7, 2017; 9:30 a.m.; Sarasota, FL; amended as to final hearing location).
- PDF:
- Date: 09/25/2017
- Proceedings: Notice of Hearing (hearing set for December 5, 2017; 9:30 a.m.; Sarasota, FL. December 6 and 7 are also reserved, if necessary).
- PDF:
- Date: 09/25/2017
- Proceedings: Amended Petitioner Joseph McClash Response to Respondent's Response to Amended Notice of Hearing and Motion for Reconsideration (filed in Case No. 17-000796).
- PDF:
- Date: 09/22/2017
- Proceedings: Petitioner Joseph McClash Response to Respondents Response to Amended Notice of Hearing and Motion for Reconsideration (filed in Case No. 17-000796).
- PDF:
- Date: 09/21/2017
- Proceedings: Respondents' Response to Amended Notice of Hearing and Motion for Reconsideration filed.
- PDF:
- Date: 09/07/2017
- Proceedings: Order Canceling Hearing (parties to advise status by September 18, 2017).
- PDF:
- Date: 09/07/2017
- Proceedings: Petitioner McClash's Response to Respondents', Long Bar Pointe, LLLP and Department of Environmental Protection's Motions in Limine (filed in Case No. 17-000796).
- PDF:
- Date: 09/01/2017
- Proceedings: Respondents, Long Bar Pointe, LLLP and Department of Environmental Protection's Motion in Limine filed.
- PDF:
- Date: 08/30/2017
- Proceedings: Petitioners Suncoast Waterkeeper, Inc,; Florida Institute for Saltwater Heritage, Inc.; and Joseph McClash, Notice of Taking Deposition Duces Tecum filed.
- PDF:
- Date: 08/22/2017
- Proceedings: Amended Notice of Hearing (hearing set for September 12 through 14, 2017; 9:30 a.m.; Sarasota, FL; amended as to final hearing location).
- PDF:
- Date: 08/17/2017
- Proceedings: Respondent, Long Bar Pointe, LLLP's Notice of Taking Deposition Duces Tecum (Clark Hull) filed.
- PDF:
- Date: 08/14/2017
- Proceedings: Respondent, Long Bar Pointe, LLLP's Amended Notice of Taking Deposition Duces Tecum (Stevely) filed.
- PDF:
- Date: 08/14/2017
- Proceedings: Respondent, Long Bar Pointe, LLLP's Notice of Taking Deposition Duces Tecum (John Stevely) filed.
- PDF:
- Date: 08/11/2017
- Proceedings: Respondent, Department of Environmental Protection's, First Request for Production of Documents to Petitioner, Florida Institute for Saltwater Heritage, Inc. filed.
- PDF:
- Date: 08/11/2017
- Proceedings: Respondent, Department of Environmental Protection's First Request for Production of Documents to Petitioner, Joseph McClash filed.
- PDF:
- Date: 08/11/2017
- Proceedings: Respondent, Department of Environmental Protection's, First Request for Production of Documents to Petitioner, Suncoast Waterkeeper, Inc. filed.
- PDF:
- Date: 08/03/2017
- Proceedings: Petitioners' Suncoast Waterkeeper, Inc., Florida Institute for Saltwater Heritage, Inc., and Joseph McClash's Joint Notice of Service of Discovery Responses to Long Bar Pointe, LLLP filed.
- PDF:
- Date: 07/17/2017
- Proceedings: Respondent, Long Bar Pointe, LLLP's Notice of Service of Request for Admissions to Petitioner, Suncoast Waterkeeper, Inc. filed.
- PDF:
- Date: 07/17/2017
- Proceedings: Respondent, Long Bar Pointe, LLLP's Notice of Service of Request for Admissions to Petitioner, Florida Institute for Saltwater Heritage, Inc. filed.
- PDF:
- Date: 07/14/2017
- Proceedings: Respondent, Long Bar Pointe, LLLP's Notice of Service of Request for Admissions to Petitioner, Joseph McClash filed.
- PDF:
- Date: 06/30/2017
- Proceedings: Respondent, Long Bar Pointe, LLLP's Notice of Service of First Interrogatories to Petitioner, Florida Institute for Saltwater Heritage, Inc. filed.
- PDF:
- Date: 06/30/2017
- Proceedings: Respondent, Long Bar Pointe, LLLP's Notice of Service of First Interrogatories to Petitioner, Suncoast Waterkeeper, Inc. filed.
- PDF:
- Date: 06/27/2017
- Proceedings: Respondent Long Bar Pointe, LLLP'S Notice of Service of First Interrogatories to Petitioner Joseph McClash filed.
- PDF:
- Date: 05/30/2017
- Proceedings: Petitioner Joseph McClash Acceptance of Stipulations Contained in the Response to Motion to Compel (Site Inspection) Submitted by Respondent Long Bar Pointe, LLLP (filed in Case No. 17-000796).
- PDF:
- Date: 05/24/2017
- Proceedings: Respondent Long Bar Pointe, LLLP's Response to Petitioner Joseph McClash's Motion to Compel (Site Inspection) filed.
- PDF:
- Date: 05/17/2017
- Proceedings: Petitioner Joseph McClash Motion to Compel (Site Inspection; filed in Case No. 17-000796).
- PDF:
- Date: 05/09/2017
- Proceedings: Notice and Certificate of Service of Petitioner Joseph McClash Request for Entry Upon Land for Inspecton and Other Purposes to Long Bar Pointe, LLLP (filed in Case No. 17-000796).
- PDF:
- Date: 04/17/2017
- Proceedings: Amended Notice of Hearing (hearing set for September 12 through 14, 2017; 9:30 a.m.; Bradenton, FL; amended as to final hearing dates).
- PDF:
- Date: 03/15/2017
- Proceedings: Respondent, Long Bar Pointe, LLLP'S, Notice of Service of Answers to Petitioner, Joseph McClash's First Set of Interrogatories (filed in Case No. 17-000796).
- PDF:
- Date: 03/15/2017
- Proceedings: Notice of Service of Department's Answers to Petitioner's First Set of Interrogatories (filed in Case No. 17-000796).
- PDF:
- Date: 02/22/2017
- Proceedings: Notice of Appearance (Edward Vogler; filed in Case No. 17-000796).
- PDF:
- Date: 02/20/2017
- Proceedings: Notice of Hearing (hearing set for September 19 through 21, 2017; 9:00 a.m.; Bradenton, FL).
- PDF:
- Date: 02/17/2017
- Proceedings: Department of Environmental Protection's Amended Response to Initial Order filed.
Case Information
- Judge:
- D. R. ALEXANDER
- Date Filed:
- 02/06/2017
- Date Assignment:
- 02/08/2017
- Last Docket Entry:
- 04/27/2018
- Location:
- Sarasota, Florida
- District:
- Middle
- Agency:
- ADOPTED IN PART OR MODIFIED
Counsels
-
Ralf G. Brookes, Esquire
Ralf Brookes Attorney
Suite 107
1217 East Cape Coral Parkway
Cape Coral, FL 33904
(239) 910-5464 -
James B. Fussell, Assistant General Counsel
Florida Department of Environmental Protection
MS-35
3900 Commonwealth Boulevard
Tallahassee, FL 32399
(850) 452-2248 -
Douglas P. Manson, Esquire
Manson Bolves Donaldson Varn, P.A.
1101 West Swann Avenue
Tampa, FL 336062637
(813) 514-4700 -
Joseph McClash
711 89 Street Northwest
Bradenton, FL 342099692
(941) 915-0684 -
Glenn Wallace Rininger, Assistant General Counsel
Jolly, Peterson & Truckenbrod, P.A.
2145 Delta Boulevard
Tallahassee, FL 32303
(850) 422-0282 -
Marianna Sarkisyan, Esquire
Department of Environmental Protection
Mail Station 35
3900 Commonwealth Boulevard
Tallahassee, FL 323993000
(850) 245-2263 -
Paria Shirzadi, Esquire
Manson Bolves Donaldson, P.A.
1101 West Swann Avenue
Tampa, FL 33606
(813) 514-4700 -
Chris R. Tanner, Esquire
Manson Bolves Donaldson, P.A.
1101 West Swann Ave.
Tampa, FL 33606
(813) 514-4700 -
Edward Vogler, II, Esquire
Vogler Ashton, PLLC
2411-A Manatee Avenue West
Bradenton, FL 342054948
(941) 388-9400 -
Amy Wells Brennan, Esquire
Address of Record -
Ralf Gunars Brookes, Esquire
Address of Record -
Douglas P Manson, Esquire
Address of Record -
Glenn Wallace Rininger, Assistant General Counsel
Address of Record -
Marianna Sarkisyan, Esquire
Address of Record -
Paria Shirzadi, Esquire
Address of Record -
Chris R. Tanner, Esquire
Address of Record -
Edward Vogler, II, Esquire
Address of Record -
Paria Shirzadi Heeter, Esquire
Address of Record -
Ralf G Brookes, Esquire
Address of Record -
Marianna R. Sarkisyan, Esquire
Address of Record