96-004576
Michael Paulsson vs.
Gulf County And Department Of Environmental Protection
Status: Closed
Recommended Order on Friday, May 9, 1997.
Recommended Order on Friday, May 9, 1997.
1STATE OF FLORIDA
4DIVISION OF ADMINISTRATIVE HEARINGS
8MICHAEL PAULSSON, )
11)
12Petitioner, )
14)
15vs. ) CASE NO. 96-4576
20)
21GULF COUNTY and )
25THE STATE OF FLORIDA )
30DEPARTMENT OF ENVIRONMENTAL )
34PROTECTION, )
36)
37Respondents. )
39_________________________________)
40RECOMMENDED ORDER
42Pursuant to notice, a formal hearing was held in this cause
53on April 18, 1997, in Port St. Joe, Florida, by Don W. Davis, a
67duly designated Administrative Law Judge of the Division of
76Administrative Hearings.
78APPEARANCES
79For Petitioner: Michael Paulsson, Pro Se
85Route 1, Box 347B
89Port St. Joe, Florida 32456
94For Respondent Gulf County:
98Timothy J. McFarland, Esquire
102Post Office Box 202
106Port St. Joe, Florida 32457
111For Respondent Department of Environmental Protection:
117Lynette L. Ciardulli, Esquire
121Department of Environmental Protection
125Mail Station 35
1283900 Commonwealth Boulevard
131Tallahassee, Florida 32399-3000
134STATEMENT OF THE ISSUE
138Whether the application of Respondent Gulf County (County)
146for permit to install a beach access road, constructed of oyster
157shell or dolomite, at the stumphole area on Cape San Blas should
169be granted.
171PRELIMINARY STATEMENT
173This matter began August 17, 1996, when Petitioner Michael
182Paulsson requested formal administrative proceedings with regard
189to issuance of a field permit for a beach access road to the
202County by Respondent Department of Environmental Protection
209(DEP).
210Subsequently, the Petition For Administrative Hearing was
217referred to the Division of Administrative Hearings for conduct
226of formal proceedings.
229Final hearing was convened on April 18, 1997, at which
239Respondents jointly presented the testimony of two witnesses and
248three exhibits which were admitted into evidence. Petitioner
256testified in his own behalf and presented one composite exhibit
266which was admitted into evidence. No transcript of the final
276hearing was provided.
279The parties proposed recommended orders have been reviewed
287and utilized in the preparation of this recommended order.
296FINDINGS OF FACT
2991. On April 11, 1996, th e County applied for a permit from
312DEP to install a beach access road constructed of oyster shell or
324dolomite over an area 275 feet in length by 12 feet wide at the
338stumphole area on Cape San Blas. The County owned the property
349at the site where a crude road bed to the beach already existed.
3622. On that same date, County Manager Donald Butler met with
373a DEP field engineer, William Fokes, on the site to determine the
385linear footage that would be necessary for the access road at the
397stumphole area. Fokes then issued the field permit for the
407access road to be constructed of oyster shell or dolomite over an
419area 275 feet in length by 12 feet wide.
4283. Since beach driving is permitted by the County in the
439area, the access road aids in preventing illegal crossing of
449beach dunes by motorists to get to the beach. Prior to issuance
461of the field permit and construction of the access road, the only
473legal motorist access to the beach was seven miles away.
4834. Permits to drive on the beach are issued by the County .
496DEP rules require that all applicants proposing to conduct
505permitted activities on a beach use a designated beach access.
515This road will allow access to conduct permitted activities,
524thereby preserving and enhancing public beach access.
5315. DEP will not permit a project that is expected to
542adversely impact the beach dune system. Although seaward of the
552Coastal Construction Control Line (CCCL) in the County, the area
562which is the subject of this field permit contained no dunes or
574vegetation since Hurricane Opal had flattened the area.
5826. Such a project cannot be permitted if the project will
593adversely impact existing upland property or property of others.
602In the instant case, neither the Petitioners property, which is
612located two miles away from the project site, or property of
623other owners in the area will be adversely impacted.
6327. The road is designed to be a non-rigid, pervious
642structure which causes less impact to any existing dune system.
652The road site is located on County property and provides logical
663and appropriate access.
6668. The construction of the road did not violate DEP
676prohibitions on permitting activities having adverse impact to
684marine turtles since the construction permit expired prior to the
694turtle nesting season.
6979. A requirement of field permit issuance is that the
707applicant and the DEP area engineer meet on site and review the
719project. This event occurred on April 11, 1996, when Butler and
730Fokes met on the site. Fokes determined that the project was
741within field permitting guidelines and issued the permit.
74910. Fokes was authorized to issue the field permit because
759the project fell in DEPs category of a driveway or similar
770activity. Expected impacts of construction of the access road
779and a driveway are deemed similar by DEP.
78711. Subsequent review by DEP staff of Fokes issuance of
797the field permit determined that sufficient information had been
806provided to him for issuance of the permit, that the project
817falls in the category of minor activity and that no adverse
828impact to dunes, property of others, beach access or nesting
838marine turtles is expected.
842CONCLUSIONS OF LAW
84512. The Division of Administrative Hearings has
852jurisdiction over this subject matter and the parties to this
862action pursuant to Section 120.57(1), Florida Statutes.
86913. The County, as applicant for the permit, has the
879ultimate burden of proof in demonstrating entitlement to subject
888permit. Department of Transportation v. J.W.C. Company, Inc. ,
896396 So. 2d 778 (Fla. 1 st DCA 1981).
90514. Permits are required for construction seaward of the
914CCL. Section 161.053, Florida Statutes.
91915. The applicant has demonstrated compliance with special
927siting and design criteria contained in Section 161.053, Florida
936Statutes, and Rule 62B-33.005, Florida Administrative Code,
943requiring that the project ensure protection of the beach dune
953system, proposed or existing structures, adjacent properties and
961preservation of public beach access.
966RECOMMENDATION
967Based upon the foregoing findings of fact and the
976conclusions of law, it is,
981RECOMMENDED:
982That a final order be entered confirming the grant of the
993field permit which is the subject of this proceeding.
1002DONE and ENTERED this 9 th day of May, 1997, in Tallahassee,
1014Leon County, Florida.
1017___________________________________
1018DON W. DAVIS
1021Administrative Law Judge
1024Division of Administrative Hearings
1028The DeSoto Building
10311230 Apalachee Parkway
1034Tallahassee, Florida 32399-3060
1037(904) 488-9675 SUNCOM 278-9675
1041Fax Filing (904) 921-6847
1045Filed with the Clerk of the
1051Division of Administrative Hearings th
1056this 9 day of May, 1997.
1062COPIES FURNISHED:
1064Lynette L. Ciardulli, Esquire
1068Department of Environmental Protection
10723900 Commonwealth Boulevard, Mail Station 35
1078Tallahassee, FL 32399-3000
1081Michael Paulsson, Pro Se
1085Route 1, Box 347B
1089Port St. Joe, FL 32456
1094Timothy J. McFarland, Esquire
1098Post Office Box 202
1102Port St. Joe, FL 32457
1107Virginia B. Wetherell, Secretary
1111Department of Environmental Protection
11153900 Commonwealth Boulevard
1118Tallahassee, FL 32399-3000
1121Perry Odom, Esquire
1124Department of Environmental Protection
11283900 Commonwealth Boulevard
1131Tallahassee, FL 32399-3000
1134NOTICE OF RIGHT TO SUBMIT EXCEPTIONS
1140All parties have the right to submit written exceptions within 15
1151days from the date of this recommended order. Any exceptions to
1162this recommended order should be filed with the agency that will
1173issue the final order in this case.
- Date
- Proceedings
- Date: 06/16/1997
- Proceedings: Final Order filed.
- Date: 05/09/1997
- Proceedings: Recommended Order sent out. Hearing Date 04/18/97.
- Date: 04/30/1997
- Proceedings: Respondent, Department of Environmental Protection`s, Motion to Accept its Proposed Recommended Order as Timely; Respondent Department of Environmental Protection`s Proposed Recommended Order filed.
- Date: 04/28/1997
- Proceedings: Letter to DWD from M. Paulsson Re: A Short Revue filed.
- Date: 04/18/1997
- Proceedings: CASE STATUS: Hearing Held.
- Date: 04/16/1997
- Proceedings: Department of Environmental Protection`s First Interrogatories to Respondent, Gulf County (filed via facisimile) filed.
- Date: 03/25/1997
- Proceedings: Order Designating Location of Hearing sent out. (hearing set for 4/18/97; 9:30am; Port St. Joe)
- Date: 03/10/1997
- Proceedings: (Card) Letter to WAB from M. Paulsson (RE: confirming that Judge has copy of photo of road that Petitioner marked) filed.
- Date: 02/27/1997
- Proceedings: Order Rescheduling Hearing sent out. (hearing rescheduled for 4/18/97; 9:30am; Port St. Joe)
- Date: 02/26/1997
- Proceedings: Department of Environmental Protection`s Motion to Compel Answers to Discovery filed.
- Date: 02/21/1997
- Proceedings: Letter to WAB from M. Paulsson (RE: available dates for hearing) filed.
- Date: 02/20/1997
- Proceedings: (Timothy McFarland) Notice of Filing Proposed List of Tentative Hearing Dates; Cover Letter (filed via facsimile).
- Date: 02/06/1997
- Proceedings: Order sent out. (Respondent`s unopposed motion for continuance is granted; parties to file available hearing dates by 2/20/97)
- Date: 01/31/1997
- Proceedings: (Gulf County) Motion for Continuance (filed via facsimile).
- Date: 12/11/1996
- Proceedings: (DEP) (2) Notice and Certificate of Service of Interrogatories filed.
- Date: 11/12/1996
- Proceedings: Notice of Hearing sent out. (hearing set for 2/5/97; 9:30am; Port St. Joe)
- Date: 10/30/1996
- Proceedings: Letter to CCA from M. Paulsson Re: Response to initial order; Letter to Sir from M. Paulsson Re: Requesting informal hearing; Letter to Ms. Weatherell from M. Paulsson Re Requesting hearing; Pictures filed.
- Date: 10/24/1996
- Proceedings: Department of Environmental Protection`s Response to Initial Order filed.
- Date: 10/09/1996
- Proceedings: Initial Order issued.
- Date: 09/26/1996
- Proceedings: Request for Assignment of Hearing Officer and Notice of Preservation of Record; Agency Field Permit Approval; Request for Formal Hearing, letter form filed.