Florida Administrative Code (Last Updated: November 11, 2024) |
25. Public Service Commission |
D25. Departmental |
25-6. Electric Service By Electric Public Utilities |
25-6.002. Application and Scope |
25-6.003. Definitions |
25-6.004. Reference to Commission (Repealed) |
25-6.014. Records and Reports in General |
25-6.015. Location and Preservation of Records |
25-6.016. Maps and Records |
25-6.018. Records of Interruptions and Commission Notification of Threats to Bulk Power Supply Integrity or Major Interruptions of Service |
25-6.019. Notification of Events |
25-6.020. Record of Applications for Service |
25-6.021. Records of Complaints |
25-6.022. Record of Metering Devices and Metering Device Tests |
25-6.030. Storm Protection Plan |
25-6.031. Storm Protection Plan Cost Recovery Clause |
25-6.033. Tariffs |
25-6.034. Standard of Construction |
25-6.035. Adequacy of Resources |
25-6.036. Inspection of Plant |
25-6.037. Extent of System Which Utility Shall Operate and Maintain |
25-6.038. Change in Character of Service |
25-6.039. Safety |
25-6.040. Grounding of Primary and Secondary Distribution System Circuits |
25-6.042. Response to Commission Staff Inquiries (Repealed) |
25-6.043. Investor-Owned Electric Utility Petition for Rate Increase; Commission Designee |
25-6.044. Continuity of Service |
25-6.046. Voltage Standards |
25-6.047. Constant Current Standards (Repealed) |
25-6.048. Limiting Connected Load |
25-6.049. Measuring Customer Service |
25-6.050. Location of Meters |
25-6.052. Test Procedures and Accuracies of Consumption Metering Devices |
25-6.054. Laboratory Standards |
25-6.055. Portable Standards |
25-6.056. Metering Device Test Plans |
25-6.058. Determination of Average Meter Error |
25-6.059. Meter Test by Request |
25-6.060. Meter Test - Refereed Dispute |
25-6.061. Relocation of Poles |
25-6.062. Inspection of Wires and Equipment |
25-6.064. Extension of Facilities; Contribution in Aid of Construction |
25-6.065. Interconnection and Metering of Customer-Owned Renewable Generation |
25-6.074. Applicability |
25-6.075. Definitions |
25-6.076. Rights of Way and Easements |
25-6.077. Installation of Underground Distribution Systems Within New Subdivisions |
25-6.078. Schedule of Charges |
25-6.080. Advances by Applicant |
25-6.081. Construction Practices (Repealed) |
25-6.082. Records and Reports (Repealed) |
25-6.093. Information to Customers |
25-6.094. Complaints and Service Requests |
25-6.095. Initiation of Service |
25-6.097. Customer Deposits |
25-6.099. Meter Readings |
25-6.100. Customer Billings |
25-6.101. Delinquent Bills |
25-6.102. Conjunctive Billing |
25-6.103. Adjustment of Bills for Meter Error |
25-6.104. Unauthorized Use of Energy |
25-6.105. Refusal or Discontinuance of Service by Utility |
25-6.106. Underbillings and Overbillings of Energy |
25-6.109. Refunds |
25-6.115. Facility Charges for Conversion of Existing Overhead Investor-owned Distribution Facilities |
25-6.0131. Regulatory Assessment Fees; Investor-owned Electric Companies, Municipal Electric Utilities, Rural Electric Cooperatives |
25-6.135. Annual Reports |
25-6.140. Test Year Notification; Proposed Agency Action Notification |
25-6.0141. Allowance for Funds Used During Construction |
25-6.0142. Uniform Retirement Units for Electric Utilities |
25-6.0143. Use of Accumulated Provision Accounts 228.1, 228.2, and 228.4 |
25-6.0144. Fair Value of Energy Produced While Testing Electric Generating Units |
25-6.0151. Audit Access to Records |
25-6.0183. Electric Utility Procedures for Generating Capacity Shortage Emergencies |
25-6.0185. Electric Utility Procedures for Long-Term Energy Emergencies |
25-6.0341. Location of the Utility’s Electric Distribution Facilities |
25-6.0342. Electric Infrastructure Storm Hardening |
25-6.0343. Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements |
25-6.0345. Safety Standards for Construction of New Transmission and Distribution Facilities |
25-6.0346. Quarterly Reports of Work Orders and Safety Compliance |
25-6.0423. Nuclear or Integrated Gasification Combined Cycle Power Plant Cost Recovery |
25-6.0424. Petition for Mid-Course Correction |
25-6.0425. Rate Adjustment Applications and Procedures |
25-6.0426. Recovery of Economic Development Expenses |
25-6.0431. Petition for a Limited Proceeding |
25-6.0435. Interim Rate Relief |
25-6.0436. Depreciation |
25-6.0437. Cost of Service Load Research |
25-6.0438. Non-Firm Electric Service - Terms and Conditions |
25-6.0439. Territorial Agreements and Disputes for Electric Utilities - Definitions |
25-6.0440. Territorial Agreements for Electric Utilities |
25-6.0441. Territorial Disputes for Electric Utilities |
25-6.0442. Customer Participation |
25-6.0455. Annual Distribution Service Reliability Report |
25-6.1351. Cost Allocation and Affiliate Transactions |
25-6.1352. Earnings Surveillance Report |
25-6.1353. Forecasted Earnings Surveillance Report |
25-6.04361. Subcategorization of Electric Plant for Depreciation Studies and Rate Design |
25-6.04364. Electric Utilities Dismantlement Studies |
25-6.04365. Nuclear Decommissioning |