40A-44.411. Completion Report  


Effective on Tuesday, August 6, 2013
  • 1Within 30 days after the completion of construction or alteration of any project for which a permit was granted under this chapter, the permittee shall file with the District a completion report prepared and certified in accordance with the certification requirements of subsection 4440A-44.301(7), 45F.A.C.

    46(1) The “As-Built Certification and Completion Report5354Form Nos. A44-B 57or 58A44-C 59amended 607-1-92, which are hereby incorporated by reference, shall identify the permit number and shall certify that the project was completed according to the specifications and standards identified in the application and all conditions stipulated by the District. Copies can be obtained by contacting the District, or online at 108http://www.flrules.org/Gateway/Reference.asp?No=Ref-02965 110or 111http://www.flrules.org/Gateway/Reference.asp?No=Ref-02966 113or at the District’s 117website www.nwfwater.com. 119Any minor deviations not subject to the requirements of Rule 12940A-44.331, 130F.A.C., for the permitted facility shall be identified in the report and shall be accompanied by supporting engineering documentation.

    149(2) The project shall not be determined fully complete and shall not be used to impound or convey water until the required “As-Built Certification and Completion Report,” Form Nos. A44-B and A44-C, is submitted to, and verified by a final inspection by, the District.

    194Rulemaking Authority 196373.044, 197373.113, 198373.418, 199403.0877 FS. 201Law Implemented 203373.117, 204373.419, 205373.423, 206403.0877(4) FS. 208History–New 10-1-84, Amended 8-1-89, 7-1-92, 8-6-13.

     

Rulemaking Events:

Historical Versions(1)

Select effective date to view different version.

Reference Materials (2)