61E1-2.002. Areas of Competency and Content  


Effective on Wednesday, February 15, 1989
  • 1(1) The Asbestos Contractors Examination shall include questions and problems normally connected with the basic fundamentals of asbestos abatement procedures and the business knowledge related thereto. The examination will be in two sections, and the topics which will be covered and the weight for each are as follows:

    49BUSINESS KNOWLEDGE PORTION

    521. Maintaining Cash Flow (4%)

    57A. Insure adequate funding

    612. Estimating and Bidding (8%)

    66A. Estimate using takeoffs

    70B. Check bid specification completeness

    75C. Determine the proper bid

    803. Negotiating and Interpreting Contracts and Agreements (20%)

    88A. Negotiate and interpret contracts and agreements with general contractors

    98B. Negotiate and interpret contracts and agreements with consumers

    107C. Negotiate and interpret contracts and agreements with subcontractors

    116D. Negotiate and interpret contracts and agreements with asbestos consultant

    126E. Negotiate and interpret contracts and agreements with suppliers

    1354. Processing Change Orders (8%)

    140A. Process change orders

    144B. Negotiate and interpret change order agreements

    1515. Purchasing Control (4%)

    155A. Maintain records by job

    1606. Scheduling contracts (10%)

    164A. Schedule materials

    167B. Schedule personnel

    170C. Schedule equipment

    1737. Insurance and Bonding (14%)

    178A. Acquire worker’s compensation insurance

    183B. Acquire liability insurance

    187C. Obtain completed work insurance

    192D. Acquire asset insurance

    196E. Obtain performance/bid bonds

    2008. Contracting Laws and Rules (10%)

    206A. Comply with state and federal laws

    213B. Obtain permits

    216C. Obtain required inspections

    2209. Managing Personnel (16%)

    224A. Train personnel on safety procedures

    230B. Monitor and evaluate field personnel

    236C. Train personnel on work procedures

    242D. Comply with labor laws

    247E. Monitor and evaluate office personnel

    25310. Payroll and Sales Tax Laws (6%)

    260A. Comply with income tax/FICA laws

    266B. Comply with unemployment tax laws

    272TECHNICAL KNOWLEDGE PORTION

    2751. Submittals/Notices (10%)

    278A. Send required notices

    282B. Maintain logs and records

    2872. Protecting Personnel (20%)

    291A. Train personnel on use of protective equipment

    299B. Establish an emergency plan

    304C. Conduct personnel exposure monitoring

    309D. Conduct safety training

    3133. Preparing for Abatement (35%)

    318A. Prepare site

    321B. Design/set up procedures

    325C. Establish entry and exit procedures

    331D. Handle and store supplies

    336E. Obtain/identify necessary equipment

    340F. Set up decontamination unit

    3454. Abatement Procedures (15%)

    349A. Conduct abatement procedures

    353B. Provide for safe handling of materials

    360C. Secure necessary equipment

    3645. Post-abatement Procedures (20%)

    368A. Conduct sampling/monitoring

    371B. Dispose of materials

    375C. Cleanup area

    378D. Restore site

    381(2) The Asbestos Consultants Examination shall include questions and problems on subjects normally connected with the basic fundamentals of the design of asbestos abatement projects, plans and specifications. The examination topics which will be covered and the weight for each are as follows:

    4241. Preparing and Evaluating Adherence to Technical Specifications (40%)

    433A. Process the required documentation of local, state, and federal Government

    444B. Identify the components necessary for shop drawing

    452C. Identify the components necessary of submittals

    459D. Select proper schedules

    463E. Plan personnel protection

    467F. Design emergency plan

    471G. Plan medical monitoring procedures

    476H. Plan entry and exit procedures

    482I. Plan enclosures

    485J. Specify work area isolation markers

    491K. Plan personnel decontamination units

    496L. Plan temporary site facilities

    501M. Plan abatement procedures

    505N. Select method of handling materials

    511O. Identify equipment

    514P. Plan sampling/monitoring

    517Q. Plan material disposal

    521R. Plan area cleanup

    525S. Plan site restoration

    5292. Preparing and Evaluating Adherence to Non-technical Specifications (10%)

    538A. Evaluate insurance

    541B. Pre-qualify contractors

    544C. Describe scope of work

    549D. Identify the general conditions

    554E. Identify the special conditions

    559F. Identify the component for bidding

    5653. Administering Contracts (10%)

    569A. Estimate quantities

    572B. Evaluate contracts

    575C. Conduct pre-construction conference

    579D. Conduct on-site monitoring of abatement procedures

    586E. Conduct on-site monitoring of abatement procedures

    593F. Negotiate change orders

    597G. Project closeout

    600H. Prepare final documentation

    6044. Identifying Probable Location of Asbestos (10%)

    611A. Review plans and specifications including as-built of existing facilities

    621B. Identify building and mechanical systems

    627C. Determine dates of additions

    6325. Conducting On-site Inspections (10%)

    637A. Perform visual survey

    641B. Perform bulk sampling

    645C. Obtain occupant exposure assessments

    650D. Interpret lab analysis

    6546. Preparing, Conducting, and Evaluating Abatement Management Plans (10%)

    663A. Determine responsive actions

    667B. Prepare operations and maintenance plan

    673C. Train personnel

    676D. Prepare written plan

    6807. Conduct and Evaluate Sampling and Monitoring Procedures (10%)

    689A. Monitor workers and occupants

    694B. Conduct pre-abatement and abatement monitoring

    700C. Conduct clearance testing

    704Specific Authority 455.307 FS. Law Implemented 710455.217, 711455.303 FS. History–New 2-15-89, Formerly 21-23.002.