62-17.293. Fees, Disbursement of Funds, Contracts  


Effective on Wednesday, February 13, 2008
  • 1(1) The Department will take no action on any notice-of-intent, application, or petition for modification until it has received the appropriate fee described below. All fees shall be paid by check made payable to the “Department of Environmental Protection”.

    40(a) Notice of Intent: $2,500.

    46(b) Application fee, comprised of the amounts in subparagraphs 1. and 2., as applicable:

    601. Fuel, site type, and net generating capacity and fuel:

     

     

    70TYPE/CAPACITY

    71FEE

     

    72Nuclear

    73$200,000

     

    75Fossil fuel (coal, oil or emulsified bitumen, except gas) 500

    85$200,000

     

    87MW or larger

     

     

    90Fossil fuel (coal, oil, or emulsified bitumen, except gas) less

    100$175,000 plus (b)2.

     

    104than 500 MW

     

     

    107Gas-fired, 100 MW or larger

    112$150,000 plus (b)2.

     

    116Waste-To-Energy,

    117$150,000 plus (b)2.

     

    121100 MW or larger

     

     

    125Gas-fired or Waste-To-Energy less than 100 MW; Solar or

    134$125,000 plus (b)2.

     

    138other, any size

     

     

    141Combined Cycle fueled by associated coal gasification

    148$150,000 plus (b)2.

     

    152facilities or oil heavier than #2

     

     

    158Combined Cycle fueled by gas or distillate oil, 350 MW or

    169$125,000 plus (b)2.

     

    173larger

     

     

    174Combined Cycle fueled by gas or distillate oil, less than 350

    185$100,000 plus (b)2.

     

    189MW

     

    1902. Associated linear facilites.

    194For associated linear facilities such as transmission lines, rail lines, or gas or oil pipelines which are proposed to be certified, a fee of $500 per mile of linear facility, as measured from the edge of the powerblock to the offsite terminus of the linear facility, is required in addition to the specified application fee, up to a maximum total fee of $200,000.

    258(c) Modifications.

    2601. No fee is required for modifications pursuant to Section 270403.516(1)(a) 271or (b), F.S.

    2742. The fee for any other modification 281shall be based on the number of agencies whose review is required in order to modify the Conditions of Certification due to the proposed equipment redesign, change in site size, type, increase in generating capacity proposed, or change in an associated linear facility location. The number of agencies whose review is required shall be determined by the Department based on the changes proposed to the Conditions of Certification. The fee shall be:

    353a.354One agency 356$10,000.

    358b.359Two agencies361$20,000.

    363c.364Three or more agencies368$30,000.

    3703. If the licensee files a request for a hearing pursuant to Section 383403.516(1)(c)3., F.S., 385the amount of the fee to be transferred to the Division of Administrative Hearings shall be remitted to the Division by the Department within 60 days after the referral of the request to the Division420.

    421(d) Supplemental applications. A supplemental application fee comprised of the amounts in subparagraphs 1. and 2. as applicable:

    4391. Supplemental generating capacity to be added and fuel:

     

    448TYPE/CAPACITY OF

     

     

    450SUPPLEMENTAL UNITS

    452FEE

     

    453Nuclear

    454$75,000

     

    456Fossil fuel (coal, oil, or emulsified bitumen, except gas)

    465$75,000

     

    467500 MW or larger

     

     

    471Fossil fuel (coal, oil, or emulsified bitumen, except gas) less than 500 MW

    484$65,000

     

    486Gas-fired, 100 MW or larger

    491$65,000

     

    493Waste-To-Energy, 100 MW or larger

    498$60,000

     

    500Gas-fired or Waste-To-Energy, less than 100 MW; solar or other, any size

    512$50,000

     

    514Combined Cycle fueled by associated coal gasification facilities or oil

    524$75,000

     

    526heavier than #2

     

     

    529Combined Cycle fueled by gas or distillate oil

    537$50,000

    5392. Additional associated linear facilities.

    544For associated linear facilities such as transmission lines, rail lines, or gas or oil pipelines which are proposed to be certified in addition to those previously certified, a fee of $500 per mile of linear facility, as measured from the edge of the powerblock to the offsite terminus of the linear facility, is required in addition to the specified application fee, up to a maximum total fee of $75,000.

    614(2) The following applies to management of the fees:

    623(a) The department shall retain the percentages specified in 632403.518(2)(a) 633and (d), F.S.

    636(b) The portion of the fee to be transferred to the Division of Administrative Hearings shall be remitted within 60 days after the following events:

    6611. Assignment of an administrative law judge to conduct the initial exercise of duties, pursuant to Section 678403.518(2)(b)1., F.S.

    6802. The issuance of the recommended order on land use, pursuant to Section 693403.508(1)(d), F.S.

    6953. The issuance of the recommended order on certification, pursuant to Section 707403.508(2)(a), F.S.

    709(c) In order to receive reimbursement for participation in the proceedings, the affected agencies must submit invoices for reimbursement to the Department’s Siting Coordination Office for a validity review prior to processing by the Department’s Bureau of Finance & Accounting. The invoices must be submitted no later than 45 days after final action by the Siting Board or after notification of withdrawal of the application. Invoices received after the deadline shall not be deemed eligible for reimbursement unless good cause is demonstrated to the department. Each invoice must be accompanied by an itemization of the time and expenses incurred in accordance with state auditing procedures.

    814(d) Authorized agency expenses for affected agencies may only include direct costs for those items identified in Section 832403.518(2)(c)1., F.S.

    834(e) All contracts must be directly related to the evaluation of the application. Any agency intending to incur an expense for a contract for studies pursuant to Section 862403.507, F.S., 864must first obtain approval from the department for the amount and purpose of such expenditure. All such studies must be related to the jurisdiction of the agencies and must be directly related to the evaluation of the application.  Any such contract must specify that:

    9081. Receipt of the final results must be available in time for agency report submittals.

    9232. The studies shall be finalized in writing.

    9313. Final reimbursement to the contractor shall not occur unless complete results are submitted such that the schedule of subparagraph 1. can be met.

    9554. The contractor agrees to be available to act as a witness in certification proceedings.

    970Rulemaking Authority 972403.504 FS. 974Law Implemented 976403.518 FS. 978History–New 1-22-91, Amended 1-26-93, Formerly 17-17.293, Amended 2-1-99, 2-13-08.

     