62-306.400. Eligibility for Generation of Credits  


Effective on Monday, January 11, 2016
  • 1(1) Activities that are 5potentially 6eligible to generate credits include, 11but are not limited to16:

    17(a) Installation or modification of water pollution control equipment 26or activities that are not required to meet TBELs, WQBELs, or other pollution control obligations, and reduce nutrient loads below the baseline48.

    49(b) Operational changes or the modification of a process or process equipment that reduce the quantity of water discharged through reuse, recycling, water conservation, or other measures and thereby reduce the load of nutrients discharged. 84Credits may be generated when a permitted surface water discharge facility closes its operations or ceases discharging to surface waters, but the credits shall only be valid while the permit remains in effect.

    117(c) Implementation of structural nonpoint source management controls.

    125(d) Installation, operation and maintenance of new drainage projects designed to treat stormwater.

    138(e) Implementation by agricultural operations of soil or water treatment technologies or water-quality enhancing production practices or systems that are confirmed in writing by DACS to reduce nutrient loads below the baseline.

    170(f) Other pollution controls, 174technologies 175or management practices with a demonstrated ability to reduce 184nutrient loads below the baseline established in a BMAP or RAP.

    195(g) A documented change in land use that goes beyond normal crop rotations or other standard agronomic practices that results in a reduction of nutrient loads below the baseline land use in the TMDL, BMAP or RAP.

    232(2) Activities that are not eligible to generate credits include:

    242(a) A reduction in nutrient loading that is required under a regulatory program, 255including a BMAP or RAP260. However, reductions beyond those required under a regulatory program shall be eligible to generate credits.

    276(b) Implementation of BMPs that are required under 284a permit or the adopted BMAP or RAP.

    292(3) For estimated credits, the Department will calculate the number of credits generated using the same method used to calculate nutrient loading during TMDL, BMAP or RAP development. For an agricultural nonpoint source, the entity must undergo an onsite assessment to identify the specific BMPs that are applicable to the agricultural operation from the suite of adopted BMPs for the type of agricultural operation, assisted by DACS; submit to DACS a BMP checklist and a signed Notice of Intent to implement the applicable BMPs; and fully implement the BMPs as required under Section 385403.067, F.S., 387before the Department will authorize credits for reductions beyond those expected from the applicable BMPs.

    402(4) An entity must fully comply with its baseline nutrient load to be eligible for credits resulting from management actions that reduce the nutrient load below the baseline. For an entity that is not a source of nutrients and is not covered by an individual or categorical load allocation, the entity may generate credits if it demonstrates in accordance with this chapter that it will reduce nutrient loads to the waterbody.

    473Rulemaking Authority 475403.067(9) FS. 477Law Implemented 479403.067(8)-480(10) FS. History–New 9-6-10, Amended 1-11-16.

     

Rulemaking Events:

Historical Versions(1)

Select effective date to view different version.

Related Statutes: