62-307.300. Implementation Procedures


Effective on Sunday, July 1, 2018
  • 1(21) As provided in an approved sampling and analysis plan, a nonpoint source discharger must ensure that water samples are taken at the frequency at all locations set forth in the approved sampling and analysis plan.

    38(2) The collected water samples must be tested in accordance with the approved sampling and analysis plan.

    55(3) Sample collection and analytical test methods on the collected samples shall be conducted in accordance with chapter 62-160, F.A.C.

    75(4) Monitoring records must be retained onsite for at least 5 years and be made available for inspection upon request.

    95(5) The nonpoint source discharger shall submit an annual report to the Department consistent with an approved sampling and analysis plan. The annual report must include all the laboratory analytical test results on the water samples taken.

    132(6) The Department shall verify implementation of nonagricultural nonpoint source BMPs required by section 146403.067(7), F.S., 148by inspection or other appropriate compliance mechanisms.

    155(7) The Department shall have all remedies available to it under Florida law, including those in Sections 172403.121, 173403.141, 174and 175403.161, F.S., 177to enforce compliance with this rule chapter or section 186403.067(7)(c), F.S.

    188Rulemaking Authority 190403.067 FS. 192Law Implemented 194403.067 FS. 196History–New 7-1-18.