62-555.401. General Permit for Construction of Lead or Copper Corrosion Control, or Iron or Manganese Sequestration, Treatment Facilities for Small or Medium Public Water Systems  


Effective on Thursday, August 28, 2003
  • 1(1) 2A general permit is hereby granted to any small or medium system, as defined in Rule 1862-550.200, 19F.A.C., for the construction of lead or copper corrosion control treatment facilities, provided that the facilities are designed in accordance with Part III of this chapter and provided that:

    48(a) Per subsections 5162-4.530(1) 52and 5362-555.520(2), 54F.A.C., the system notifies the Department at least 30 days before beginning construction using Form 6962-555.900(18), 70Notice of Intent to Use the General Permit for Construction of Lead or Copper Corrosion Control, or Iron or Manganese Sequestration, Treatment Facilities for Small or Medium PWSs, as incorporated into subsection 10262-555.520(2), 103F.A.C. The completed notice form shall be submitted to the appropriate Department of Environmental Protection District Office or Approved County Health Department and shall be accompanied by the permit processing fee described in subsection 13762-555.520(6), 138F.A.C., and listed in paragraph 14362-4.050(4)(p), 144F.A.C.

    145(b) The selected lead or copper corrosion control treatment is consistent with the guidance and recommendations in the 163Lead and Copper Guidance Manual, Volume II: Corrosion Control Treatment 173as adopted in Rule 17762-555.335, 178F.A.C.

    179(2) A general permit is hereby granted to any small or medium system, as defined in Rule 19662-550.200, 197F.A.C., for the construction of iron or manganese sequestration treatment facilities, provided that the facilities are designed in accordance with Part III of this chapter and provided that, per subsections 22762-4.530(1) 228and 22962-555.520(2), 230F.A.C., the system notifies the Department at least 30 days before beginning construction using Form 24562-555.900(18), 246Notice of Intent to Use the General Permit for Construction of Lead or Copper Corrosion Control, or Iron or Manganese Sequestration, Treatment Facilities for Small or Medium PWSs, as incorporated into subsection 27862-555.520(2), 279F.A.C. The completed notice form shall be submitted to the appropriate Department of Environmental Protection District Office or Approved County Health Department and shall be accompanied by the permit processing fee described in subsection 31362-555.520(6), 314F.A.C., and listed in paragraph 31962-4.050(4)(p), 320F.A.C.

    321(3) 322This general permit is subject to the general conditions in Rule 33362-4.540, 334F.A.C., and the following specific conditions:

    340(a) If the treatment facilities being constructed under this general permit were designed under the responsible charge of a professional engineer, the permittee shall retain a Florida-licensed professional engineer in accordance with subsection 37362-555.530(3), 374F.A.C., to take responsible charge of inspecting construction of the facilities for the purpose of determining in general if the construction proceeds in compliance with this general permit, including the approved preliminary design report for the facilities.

    411(b) In accordance with subsection 41662-555.530(4), 417F.A.C., the permittee shall have complete record drawings produced for the treatment facilities being constructed under this general permit.

    436(c) To fulfill the requirements under subsection 44362-555.350(13), 444F.A.C., the permittee shall provide an operation and maintenance manual for the treatment facilities constructed under this general permit.

    463(d) Per Rule 46662-555.345, 467F.A.C., the permittee shall submit a certification of construction completion to the Department and obtain approval, or clearance, from the Department before placing any treatment facilities constructed under this general permit into operation for any purpose other than disinfection, testing for leaks, or testing equipment operation. This specific condition does not prohibit the permittee from cutting into existing water mains and returning the water mains to operation in accordance with subsection 53862-555.340(5), 539F.A.C., without the Department’s approval.

    544Specific Authority 546403.814(1), 547403.861(9) FS. 549Law Implemented 551403.0877, 552403.814(1), 553(4), 554403.861(7), 555(10) FS. History–New 12-10-96, Amended 8-28-03.

     