Florida Administrative Code (Last Updated: December 2, 2024) |
62. Department of Environmental Protection |
D62. Departmental |
62-672. Minimum Requirements For Earthen Dams Used In Phosphate Mining And Beneficiation Operations And For Dikes Used In Phosphogypsum Stack System Impoundments |
62-672. Minimum Requirements For Earthen Dams Used In Phosphate Mining And Beneficiation Operations And For Dikes Used In Phosphogypsum Stack System Impoundments
62-672.100. General (Repealed) |
62-672.200. Definitions |
62-672.300. Construction of New Dams |
62-672.400. Operational Requirements |
62-672.500. Inspections |
62-672.550. Contingency Plans |
62-672.570. Non-Clay Phosphate Mining Impoundments |
62-672.600. Construction of New Perimeter Earthen Dikes |
62-672.620. Assessment of Existing Perimeter Earthen Dikes (Repealed) |
62-672.650. Operational Requirements for Perimeter Earthen Dikes |
62-672.670. Inspection and Maintenance Requirements for Perimeter Earthen Dikes |
62-672.700. Construction of New Phosphogypsum Stacks |
62-672.720. Assessment of Existing Phosphogypsum Stacks (Repealed) |
62-672.750. Procedures for Raising Phosphogypsum Stacks |
62-672.760. Procedures for Decanting Process Water from Top of Phosphogypsum Stack |
62-672.770. Phosphogypsum Stack Inspection and Maintenance |
62-672.780. Phosphogypsum Stack System, Operation Plans |
62-672.800. Training |
62-672.850. Contingency Plans |
62-672.870. Emergency Measures |