62-730.292. Public Notice for Hazardous Waste Permits and Other Authorizations.  


Effective on Tuesday, April 23, 2013
  • 1(1) The pre-application public meeting requirements of 840 CFR 124.31 11[as adopted in subsection 1562-730.200(3), 16F.A.C.] apply to:

    19(a) Initial applications for construction or operation of a hazardous waste treatment, storage or disposal facility; and

    36(b) Operation permit renewals which propose a significant change in facility operations.

    48(2) The following applicants shall comply with the requirements of Section 59403.722(12), F.S.61:

    62(a) The applicant for a permit to construct or operate a hazardous waste treatment, storage or disposal facility; and

    81(b) The applicant for a modification or renewal of a construction or operation permit.

    95(3) The owner or operator shall cause notice of the Department’s action to be published in a major local newspaper or newspapers of general circulation within 30 calendar days of receipt of:

    127(a) The Department’s notice of intent to issue, modify, renew or terminate a hazardous waste permit; variance; or closure equivalency demonstration;

    148(b) An executed copy of an authorization from the Department to implement a clean closure plan;

    164(c) Approval by the Department of a remediation plan under 17440 CFR Part 270 178Subpart H [as adopted in subsection 18462-730.220(1), 185F.A.C.]; and/or

    187(d) A clean closure determination.

    192(4) The owner or operator shall cause the Department’s intent to issue a construction or operation permit (including modifications and renewals) to be broadcast over a local radio station.

    221(5) The notice for any hazardous waste permit or other hazardous waste authorization (except a variance and a clean closure determination) shall provide a 45-day period during which any person may comment on the Department’s action or request an informal public meeting and a substantially affected party may request a hearing pursuant to Sections 275120.569 276and 277120.57, F.S. 279The notice period for a variance pursuant to 28740 CFR 260.31, 290260.32 and 260.33 [as adopted in subsection 29762-730.021, 298F.A.C.] shall be 30 days. The notice period for any other hazardous waste variance shall be 15 days. The notice period for a clean closure determination shall be 21 days in accordance with subsection 33262-110.106(2), 333F.A.C. Each notice shall contain instructions on how to examine a copy of the agency action and how members of the public can avail themselves of these rights and opportunities.

    363(6) The applicant shall provide the Department with proof of the publication and broadcast required by this section within 14 days of the receipt of proof of publication, but no later than 45 days after the applicant receives the Department’s action.

    404(7) If within the applicable time limit after publication and broadcast as required in this section the Department receives written notice of opposition to the agency’s intention to issue such authorization and a request for a hearing, the Department shall provide for a hearing pursuant to Sections 451120.569 452and 453120.57, F.S., 455if requested by a substantially affected party or an informal public meeting if requested by any other person. The Department shall provide at least 30 days public notice prior to the holding of such hearing or meeting. Failure to request a hearing within the applicable time period shall constitute a waiver of the right to a hearing under Sections 514120.569 515and 516120.57, F.S.

    518Rulemaking Authority 520403.061, 521403.087, 522403.704, 523403.721, 524403.722 FS. 526Law Implemented 528403.151, 529403.704, 530403.707, 531403.721, 532403.722 FS. 534History– New 1-29-06, Amended 4-23-13.

     