Purpose and effect is to amplify and clarify the meaning of “degree of control necessary for the Engineer of Record.”  


  • RULE NO: RULE TITLE
    61G15-18.011: Definitions
    PURPOSE AND EFFECT: Purpose and effect is to amplify and clarify the meaning of “degree of control necessary for the Engineer of Record.”
    SUBJECT AREA TO BE ADDRESSED: Definitions.
    SPECIFIC AUTHORITY: 471.008, 471.013(1)(a)1., 2. FS.
    LAW IMPLEMENTED: 471.003(2)(f), 471.005(7), 471.005(6), 471.013(1)(a)1., 2., 471.023(1), 471.025(3), 471.033(1)(j) FS.
    IF REQUESTED IN WRITING AND NOT DEEMED UNNECESSARY BY THE AGENCY HEAD, A RULE DEVELOPMENT WORKSHOP WILL BE NOTICED IN THE NEXT AVAILABLE FLORIDA ADMINISTRATIVE WEEKLY.
    THE PERSON TO BE CONTACTED REGARDING THE PROPOSED RULE DEVELOPMENT AND A COPY OF THE PRELIMINARY DRAFT, IF AVAILABLE, IS: Carrie Flynn, Executive Director, Board of Professional Engineers, 2507 Callaway Road, Suite 200, Tallahassee, Florida 32301

    THE PRELIMINARY TEXT OF THE PROPOSED RULE DEVELOPMENT IS:

    61G15-18.011 Definitions.

    As used in Chapter 471, F.S., and in these rules where the context will permit the following terms have the following meanings:

    (1) “Responsible Charge” shall mean that degree of control an engineer is required to maintain over engineering decisions made personally or by others over which the engineer exercises supervisory direction and control authority. The engineer in responsible charge is the Engineer of Record as defined in subsection 61G15-30.002(1), F.A.C.

    (a) The degree of control necessary for the Engineer of Record shall be such that the engineer:

    1. through 2. No change.

    3. Approves the inclusion of standard engineering design details into the engineering work. Standard engineering design details include details mandated or directed to be contained in engineering documents by governmental agencies (such as the Florida Department of Transportation); and details contained in engineering design manuals and catalogues that are generally accepted as authoritative in the engineering profession. In order to approve the inclusion of such details the Engineer of Record must conduct such reasonable analysis of the content of the standard detail(s) as is necessary in the sound professional judgment of the Engineer of Record to be assured that the inclusion of such detail(s) into the engineering work is acceptable engineering practice.

    (b) through (d) No change.

    (2) through (6) No change.

    Specific Authority 471.008, 471.013(1)(a)1., 2. FS. Law Implemented 471.003(2)(f), 471.005(7), 471.005(6), 471.013(1)(a)1., 2., 471.023(1), 471.025(3), 471.033(1)(j) FS. History–New 6-23-80, Amended 12-19-82, 11-22-83, Formerly 21H-18.11, Amended 1-16-91, 4-4-93, Formerly 21H-18.011, Amended 12-22-99, 4-19-01, 10-16-02, 9-15-04, 6-5-08,_________.

Document Information

Subject:
Definitions.
Purpose:
Purpose and effect is to amplify and clarify the meaning of “degree of control necessary for the Engineer of Record.”
Rulemaking Authority:
471.008, 471.013(1)(a)1., 2. FS.
Law:
471.003(2)(f), 471.005(7), 471.005(6), 471.013(1)(a)1., 2., 471.023(1), 471.025(3), 471.033(1)(j) FS.
Contact:
Carrie Flynn, Executive Director, Board of Professional Engineers, 2507 Callaway Road, Suite 200, Tallahassee, Florida 32301
Related Rules: (1)
61G15-18.011. Definitions