received a Petition for Variance from Rules 2.1.1.2, 2.1.1.3, 2.7.6, 2.20.1, and 2.20.9, A.S.M.E. 17.1, 2000 edition, as adopted by Rule 61C-5.001, F.A.C., which require a machine room, steel ropes and non welded terminations, from Rick Dayton of ...
Bureau of Elevator Safety received Petitions for Variance from
Rules 2.1.1.2, 2.1.1.3, 2.7.6, 2.20.1, and 2.20.9, A.S.M.E. 17.1,
2000 edition, as adopted by Rule 61C-5.001, F.A.C., which
require a machine room, steel ropes and non welded
terminations, from Tim Hawthorne of Otis Elevator Company.
The Petitioner is requesting a variance to allow the installation
of Gen2™ elevator systems in the following locations: Florida
Hospital Altamonte (Petition VW 2005-186).
A copy of the Petitions can be obtained from: Mark Boutin,
Bureau of Elevator Safety, 1940 North Monroe Street,
Tallahassee, Florida 32399-1013.
The Bureau of Elevator Safety will accept comments
concerning the Petition for 14 days from the date of publication
of this notice. To be considered, comments must be received on
or before 5:00 p.m.