received a Petition for Variance from Rules 2.1.1.2, 2.1.1.3, 2.7.6, 2.20.1, and 2.20.9, A.S.M.E. 17.1, 2000 edition, as adopted by Rule 61C-5.001, F.A.C., which require a machine room, steel ropes and non welded terminations, from Rick Dayton of ...  

  • Bureau of Elevator Safety received Petitions for Variance from

    Rules 2.1.1.2, 2.1.1.3, 2.7.6, 2.20.1, and 2.20.9, A.S.M.E. 17.1,

    2000 edition, as adopted by Rule 61C-5.001, F.A.C., which

    require a machine room, steel ropes and non welded

    terminations, from Tim Hawthorne of Otis Elevator Company.

    The Petitioner is requesting a variance to allow the installation

    of Gen2™ elevator systems in the following locations: Florida

    Hospital Altamonte (Petition VW 2005-186).

    A copy of the Petitions can be obtained from: Mark Boutin,

    Bureau of Elevator Safety, 1940 North Monroe Street,

    Tallahassee, Florida 32399-1013.

    The Bureau of Elevator Safety will accept comments

    concerning the Petition for 14 days from the date of publication

    of this notice. To be considered, comments must be received on

    or before 5:00 p.m.