OTHER AGENCIES AND ORGANIZATIONS
FSU Student Union Replacement (FS-263)
Date 10/10/2019NOTICE TO BIDDERS
Sealed bids for furnishing all labor and material and performing all work necessary and incidental to the completion of
Bid Group
Bid Package No. & Description
Pre-Bid Date / Time
Bid Date / Time
1.3 – Cranes
Complete
Complete
2.1 - Abatement
Complete
Complete
2.2 – Demolition
Complete
Complete
2.3 – Auger Cast Piles
Complete
Complete
2.4 – Retaining Walls
Complete
Complete
3.1 – Temporary Concrete
Complete
Complete
3.2 – Concrete Foundations
Complete
Complete
3.03 – Cast in Place Concrete
Complete
Complete
4.1 – Temporary Masonry
Complete
Complete
5.01 – Structural and Misc. Steel
Complete
Complete
6.1 – Temporary Wood Loading Dock
Complete
Complete
7.05 – Waterproofing
Complete
Complete
7.1 – Temporary Roofing
Complete
Complete
8.1 – Temporary Doors Frames and Hardware
Complete
Complete
9.1 – Temporary Drywall and Framing
Complete
Complete
21.1 – Temporary Fire Protection
Complete
Complete
22.1 – Temporary Plumbing
Complete
Complete
23.1 – Site and Temporary HVAC
Complete
Complete
26.1 – Site and Temporary Electrical
Complete
Complete
31.1 – Sitework and Utilities
Complete
Complete
A
1.04 – Final Cleaning
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
A
1.05 – Steel Testing
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
A
2.04 – Davis Demolition
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
A
2.05 – Davis Abatement
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
A
3.05 – Site Concrete
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
A
3.06 – Polished Concrete
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
A
4.02 – Masonry, Precast Architectural Concrete & Cast Stone
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
A
5.02 – Misc. Metals and Ornamental Railings
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
B
7.03 – Roofing & Metal Panel Systems
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
7.04 – Applied Fireproofing & Intumescent Paint
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
7.06 – Damp Proofing & Weather Barriers
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
8.02 – Doors Frames and Hardware
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
8.03 – Glass & Glazing
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
8.05 – Overhead Doors & Grilles
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
9.02 – Metal Framing and Drywall
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
9.03 – Acoustical Ceilings & Treatments
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
9.04 – Hard Tile
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
9.05 – Carpet & Resilient Floors
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
9.06 – Wood Floors
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
9.07 – Fluid Applied Flooring
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
B
9.09 – Paint, Coatings, Sealants & Wall Coverings
10/10/19 – 10:30 a.m.
11/06/19 – 2:00 p.m.
C
10.01 – Misc. Specialties
10/10/19 – 1:30 p.m.
11/07/19 – 2:00 p.m.
C
10.02 – Signage & Plaques
10/10/19 – 1:30 p.m.
11/07/19 – 2:00 p.m.
C
10.03 – Specialty & Operable Partitions
10/10/19 – 1:30 p.m.
11/07/19 – 2:00 p.m.
C
10.04 – Protective Canopies, Covers, and Pergolas
10/10/19 – 1:30 p.m.
11/07/19 – 2:00 p.m.
C
11.01 – Loading Dock Equipment
10/10/19 – 1:30 p.m.
11/07/19 – 2:00 p.m.
C
11.02 – Food Service Equipment
10/10/19 – 1:30 p.m.
11/07/19 – 2:00 p.m.
C
11.03 – Athletic Equipment - Bowling Alley
10/10/19 – 1:30 p.m.
11/07/19 – 2:00 p.m.
C
12.01 – Casework and Millwork
10/10/19 – 1:30 p.m.
11/07/19 – 2:00 p.m.
C
14.01 – Elevators
10/10/19 – 1:30 p.m.
11/07/19 – 2:00 p.m.
D
21.02 – Fire Protection
10/10/19 – 3:00 p.m.
11/07/19 – 2:00 p.m.
D
22.02 – Plumbing
10/10/19 – 3:00 p.m.
11/07/19 – 2:00 p.m.
D
23.02 - HVAC
10/10/19 – 3:00 p.m.
11/07/19 – 2:00 p.m.
D
26.02 – Electrical, Fire Alarm and Data
10/10/19 – 3:00 p.m.
11/07/19 – 2:00 p.m.
A
31.02 – Sitework – Earthwork, Utilities & Paving
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
A
32.01 – Unit Pavers
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
A
32.02 – Fencing & Gates
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
A
32.03 – Landscaping & Irrigation
10/10/19 – 9:00 a.m.
11/06/19 – 2:00 p.m.
** Dates are subject to change. Notice will be given to Pre-Qualified bidders.
for FSU Student Union Replacement (FS-263) will be received by Ajax Building Company, LLC at 1080 Commerce Blvd., Midway, Florida 32343, until 2:00 p.m. Local Time, on the above referenced dates.
Bidders may submit their Bid Proposal at either location.
Pre-Bid Conferences will be held at 1080 Commerce Blvd., Midway, Florida 32343 at the above listed dates and times. Pre-Bid Conferences are not mandatory although bidders are encouraged to attend.
Interested bidders are required to complete Ajax Building Company, LLC’s pre-qualification process. Only bidders meeting pre-qualification criteria may bid. Bidders must submit a completed experience questionnaire and financial statement on the form entitled “Bidder Qualifications Questionnaire”, incorporated herein by reference. The subcontractor’s financial condition must demonstrate that adequate fixed and liquid assets and equipment are available to properly perform the Subcontract. Bids may be considered non-responsive if bidder has not completed the prequalification process.
For contractors, businesses and trades that are regulated by licensing, bidder must be licensed in the State of Florida.
Plans for FSU Student Union Replacement (FS-263) are scheduled to be made available electronically on 09/30/2019, and Bid Packages are scheduled to be made available electronically on 10/11/2019. Interested bidders will receive an invitation to join Ajax Building Company, LLC’s Procore Project Management System where they may obtain the Bid Documents (drawings, specifications, bid packages, addenda and other bid documents).
No bids may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days.
Proposals shall be sealed and plainly marked, "Bid", with name of project, bid package number and description, name and address of bidder, time and date due.
If you are unable to physically submit your bid proposal in hard copy to Ajax Building Company, LLC, your bid proposal may be submitted via email to lthompson@ajaxbuilding.com prior to the bid closing date and time. If bid proposal is submitted via email, bidder shall scan the complete bid proposal submittal (including bid proposal form, bid proposal affidavit, bid security, and other documents as may be required) and email bid proposal submittal as one (1) electronic (PDF) document. Subject line of email shall be marked “Bid”, with name of project, bid package number and description. Ajax Building Company, LLC must receive the original hard copies of your complete bid proposal submittal (including bid proposal form, bid proposal affidavit, bid security, and other documents as may be required) in our office at 1080 Commerce Blvd., Midway, Florida 32343 no later than the close of business on the next business day after bids are due. Note: Zip files are not accepted by our email server. If submitting your bid via email, do not include any zip files in attachments. Ajax Building Company, LLC is not responsible for bids that are not received due to rejected emails or emails that have been designated as spam by the email server.
The Construction Manager reserves the right to reject any and all bids received and to waive any and all informalities or irregularities in regard thereto.
Bid Proposals Totaling $40,000 or Greater
Each bid totaling $40,000 or greater must be accompanied by a Bid Bond on the form enclosed in this Master Bid Package, certified check, or cashier's check in an amount no less than five percent (5%) of the total base bid amount as guarantee that the bidder will, if awarded the contract, enter into a written contract, satisfactory in form, containing a penalty clause and requiring workers' compensation and public liability insurance and approval of subcontractor by Ajax Building Company, LLC and shall be prepared to provide Payment and Performance Bonds on the forms enclosed in this Master Bid Package to Ajax in the full amount of the contract price within seven (7) days after acceptance.
Bid Proposals Totaling Less Than $40,000
Bid security and bonding requirements do not apply to bid proposals and subcontract awards totaling less than $40,000. At the discretion of Ajax Building Company, LLC, a shortened Subcontract Agreement form may be used for subcontract awards totaling less than $40,000.
Ajax Building Company, LLC – Project Contact Information
Title
Name
Phone
Email
Operations Manager
Jeremy Cox
(352)409-8997
jcox@ajaxbuilding.com
Senior Project Manager
Chris Kuhn
(850)510-3694
ckuhn@ajaxbuilding.com
Project Manager
Steve Wackes
(850)509-3124
swackes@ajaxbuilding.com
Project Engineer
Luke Thompson
(850)509-7458
lthompson@ajaxbuilding.com
Senior Superintendent
Wayne Wallace
(352)745-1887
wwallace@ajaxbuilding.com
Project Administrator
Jennifer Elkins
(850)308-7415
jray@ajaxbuilding.com