Other Agencies and Organizations, Ajax Building Corporation  

  •  

    OTHER AGENCIES AND ORGANIZATIONS

    Ajax Building Corporation

    FSU Student Union Replacement (FS-263)

    NOTICE TO BIDDERS

    Sealed bids for furnishing all labor and material and performing all work necessary and incidental to the completion of

    Bid Group

    Bid Package No. & Description

    Pre-Bid Date / Time

    Bid Date / Time

     

    1.3 – Cranes

    Complete

    Complete

     

    2.1 - Abatement

    Complete

    Complete

     

    2.2 – Demolition

    Complete

    Complete

     

    2.3 – Auger Cast Piles

    Complete

    Complete

     

    2.4 – Retaining Walls

    Complete

    Complete

     

    3.1 – Temporary Concrete

    Complete

    Complete

     

    3.2 – Concrete Foundations

    Complete

    Complete

     

    3.03 – Cast in Place Concrete

    Complete

    Complete

     

    4.1 – Temporary Masonry

    Complete

    Complete

     

    5.01 – Structural and Misc. Steel

    Complete

    Complete

     

    6.1 – Temporary Wood Loading Dock

    Complete

    Complete

     

    7.05 – Waterproofing

    Complete

    Complete

     

    7.1 – Temporary Roofing

    Complete

    Complete

     

    8.1 – Temporary Doors Frames and Hardware

    Complete

    Complete

     

    9.1 – Temporary Drywall and Framing

    Complete

    Complete

     

    21.1 – Temporary Fire Protection

    Complete

    Complete

     

    22.1 – Temporary Plumbing

    Complete

    Complete

     

    23.1 – Site and Temporary HVAC

    Complete

    Complete

     

    26.1 – Site and Temporary Electrical

    Complete

    Complete

     

    31.1 – Sitework and Utilities

    Complete

    Complete

    A

    1.04 – Final Cleaning

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    A

    1.05 – Steel Testing

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    A

    2.04 – Davis Demolition

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    A

    2.05 – Davis Abatement

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    A

    3.05 – Site Concrete

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    A

    3.06 – Polished Concrete

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    A

    4.02 – Masonry, Precast Architectural Concrete & Cast Stone

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    A

    5.02 – Misc. Metals and Ornamental Railings

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    B

    7.03 – Roofing & Metal Panel Systems

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    7.04 – Applied Fireproofing & Intumescent Paint

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    7.06 – Damp Proofing & Weather Barriers

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    8.02 – Doors Frames and Hardware

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    8.03 – Glass & Glazing

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    8.05 – Overhead Doors & Grilles

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    9.02 – Metal Framing and Drywall

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    9.03 – Acoustical Ceilings & Treatments

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    9.04 – Hard Tile

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    9.05 – Carpet & Resilient Floors

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    9.06 – Wood Floors

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    9.07 – Fluid Applied Flooring

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    B

    9.09 – Paint, Coatings, Sealants & Wall Coverings

    10/10/19 – 10:30 a.m.

    11/06/19 – 2:00 p.m.

    C

    10.01 – Misc. Specialties

    10/10/19 – 1:30 p.m.

    11/07/19 – 2:00 p.m.

    C

    10.02 – Signage & Plaques

    10/10/19 – 1:30 p.m.

    11/07/19 – 2:00 p.m.

    C

    10.03 – Specialty & Operable Partitions

    10/10/19 – 1:30 p.m.

    11/07/19 – 2:00 p.m.

    C

    10.04 – Protective Canopies, Covers, and Pergolas

    10/10/19 – 1:30 p.m.

    11/07/19 – 2:00 p.m.

    C

    11.01 – Loading Dock Equipment

    10/10/19 – 1:30 p.m.

    11/07/19 – 2:00 p.m.

    C

    11.02 – Food Service Equipment

    10/10/19 – 1:30 p.m.

    11/07/19 – 2:00 p.m.

    C

    11.03 – Athletic Equipment - Bowling Alley

    10/10/19 – 1:30 p.m.

    11/07/19 – 2:00 p.m.

    C

    12.01 – Casework and Millwork

    10/10/19 – 1:30 p.m.

    11/07/19 – 2:00 p.m.

    C

    14.01 – Elevators

    10/10/19 – 1:30 p.m.

    11/07/19 – 2:00 p.m.

    D

    21.02 – Fire Protection

    10/10/19 – 3:00 p.m.

    11/07/19 – 2:00 p.m.

    D

    22.02 – Plumbing

    10/10/19 – 3:00 p.m.

    11/07/19 – 2:00 p.m.

    D

    23.02 - HVAC

    10/10/19 – 3:00 p.m.

    11/07/19 – 2:00 p.m.

    D

    26.02 – Electrical, Fire Alarm and Data

    10/10/19 – 3:00 p.m.

    11/07/19 – 2:00 p.m.

    A

    31.02 – Sitework – Earthwork, Utilities & Paving

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    A

    32.01 – Unit Pavers

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    A

    32.02 – Fencing & Gates

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

    A

    32.03 – Landscaping & Irrigation

    10/10/19 – 9:00 a.m.

    11/06/19 – 2:00 p.m.

      ** Dates are subject to change.  Notice will be given to Pre-Qualified bidders.

    for FSU Student Union Replacement (FS-263) will be received by Ajax Building Company, LLC at 1080 Commerce Blvd., Midway, Florida 32343, until 2:00 p.m. Local Time, on the above referenced dates.

    Bidders may submit their Bid Proposal at either location.

    Pre-Bid Conferences will be held at 1080 Commerce Blvd., Midway, Florida 32343 at the above listed dates and times.  Pre-Bid Conferences are not mandatory although bidders are encouraged to attend.

    Interested bidders are required to complete Ajax Building Company, LLC’s pre-qualification process.  Only bidders meeting pre-qualification criteria may bid.  Bidders must submit a completed experience questionnaire and financial statement on the form entitled “Bidder Qualifications Questionnaire”, incorporated herein by reference.  The subcontractor’s financial condition must demonstrate that adequate fixed and liquid assets and equipment are available to properly perform the Subcontract.  Bids may be considered non-responsive if bidder has not completed the prequalification process.

    For contractors, businesses and trades that are regulated by licensing, bidder must be licensed in the State of Florida.

    Plans for FSU Student Union Replacement (FS-263) are scheduled to be made available electronically on 09/30/2019, and Bid Packages are scheduled to be made available electronically on 10/11/2019.  Interested bidders will receive an invitation to join Ajax Building Company, LLC’s Procore Project Management System where they may obtain the Bid Documents (drawings, specifications, bid packages, addenda and other bid documents).

    No bids may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days.

    Proposals shall be sealed and plainly marked, "Bid", with name of project, bid package number and description, name and address of bidder, time and date due.

    If you are unable to physically submit your bid proposal in hard copy to Ajax Building Company, LLC, your bid proposal may be submitted via email to lthompson@ajaxbuilding.com prior to the bid closing date and time.  If bid proposal is submitted via email, bidder shall scan the complete bid proposal submittal (including bid proposal form, bid proposal affidavit, bid security, and other documents as may be required) and email bid proposal submittal as one (1) electronic (PDF) document.  Subject line of email shall be marked “Bid”, with name of project, bid package number and description.  Ajax Building Company, LLC must receive the original hard copies of your complete bid proposal submittal (including bid proposal form, bid proposal affidavit, bid security, and other documents as may be required) in our office at 1080 Commerce Blvd., Midway, Florida 32343 no later than the close of business on the next business day after bids are due.  Note: Zip files are not accepted by our email server.  If submitting your bid via email, do not include any zip files in attachments.  Ajax Building Company, LLC is not responsible for bids that are not received due to rejected emails or emails that have been designated as spam by the email server.

    The Construction Manager reserves the right to reject any and all bids received and to waive any and all informalities or irregularities in regard thereto.

    Bid Proposals Totaling $40,000 or Greater

    Each bid totaling $40,000 or greater must be accompanied by a Bid Bond on the form enclosed in this Master Bid Package, certified check, or cashier's check in an amount no less than five percent (5%) of the total base bid amount as guarantee that the bidder will, if awarded the contract, enter into a written contract, satisfactory in form, containing a penalty clause and requiring workers' compensation and public liability insurance and approval of subcontractor by Ajax Building Company, LLC and shall be prepared to provide Payment and Performance Bonds on the forms enclosed in this Master Bid Package to Ajax in the full amount of the contract price within seven (7) days after acceptance.

    Bid Proposals Totaling Less Than $40,000

    Bid security and bonding requirements do not apply to bid proposals and subcontract awards totaling less than $40,000.  At the discretion of Ajax Building Company, LLC, a shortened Subcontract Agreement form may be used for subcontract awards totaling less than $40,000.

    Ajax Building Company, LLC – Project Contact Information

    Title

    Name

    Phone

    Email

     

     

     

     

    Operations Manager

    Jeremy Cox

    (352)409-8997

    jcox@ajaxbuilding.com

    Senior Project Manager

    Chris Kuhn

    (850)510-3694

    ckuhn@ajaxbuilding.com

    Project Manager

    Steve Wackes

    (850)509-3124

    swackes@ajaxbuilding.com

    Project Engineer

    Luke Thompson

    (850)509-7458

    lthompson@ajaxbuilding.com

    Senior Superintendent

    Wayne Wallace

    (352)745-1887

    wwallace@ajaxbuilding.com

    Project Administrator

    Jennifer Elkins

    (850)308-7415

    jray@ajaxbuilding.com

     

Document Information