NOTICE TO CONSTRUCTION MANAGERS
Florida A&M University (FAMU), announces that construction management services will be required for: Project No.: FM-316, Gore Education Complex Remodeling,
This project consists of renovations to the existing Gore Education Complex, a 71,366 gsf four-story facility constructed in 1968 and renovated ($1,200,000) in 1988, which houses the college of Education, School of General Studies and various departments of the College of Arts and Sciences. The scope of renovation includes but is not limited to, restoration of the buildings envelope, replacement of the buildings plumbing and air conditioning system, replacement of the electrical wiring (electrical upgrades), complete roof replacement, asbestos abatement, correction of life safety, ADA standards, and technology upgrades. Upgrading of existing teaching pool located on an adjacent site.
The site is surrounded by a remarkably diverse representation of architectural styles in the presence of Sunshine Manor, Tucker Hall, Carnegie Library, Coleman Library, and quadrangle which are a portion of the National Historic District. Consideration should be given to site design improvements and how this addition relates to
The estimated construction budget is $15,140,478.
The contract for construction management services will consist of two phases. Phase one is pre-construction services, for which the construction manager will be paid a fixed fee. Phase one services include value engineering, constructability analyses, development of a cost model, estimating, and the development of a Guaranteed Maximum Price (GMP) at 75% Construction Document phase. If the GMP is accepted, phase two, the construction phase, will be implemented. In phase two of the contract, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fee for phase one of the contract, or to arrive at an acceptable GMP within the time provided in the agreement may result in the termination of the construction managers contract.
Selection of finalists for interviews will be made on the basis of construction manager qualifications, including experience and ability; past experience; bonding capacity; record-keeping/administrative ability, critical path scheduling expertise; cost estimating; cost control ability; quality control capability; qualification of the firms personnel, staff and consultants; and ability to meet the minority business enterprise participation requirements. Finalists will be provided with a copy of the building program, the latest documentation prepared by the project architect/engineer and a description of the final interview requirements. The Selection Committee may reject all proposals and stop the selection process at any time. The construction manager shall have no ownership, entrepreneurial or financial affiliation with the selected architect/engineer involved with this project.
Firms desiring to provide construction management services for the project shall submit a letter of application and a completed FAMU Construction Manager Qualifications Supplement. Proposals must not exceed 80 pages, including the Construction Manager Qualifications Supplement and letter of application. Pages must be numbered consecutively. Submittals which do not comply with these requirements or do not include the requested data will not be considered. No submittal material will be returned.
All applicants must be licensed to practice as general contractors in the State of
The FAMU Construction Manager Qualifications Supplement forms and the Project Fact Sheet may be obtained by contacting Samuel Houston, Director of Planning, Office of Facilities Planning and Construction by e-mail: samuel. houston@famu.edu and/or phone (850)599-8001, Fax (850)561-2289.
Eight (8) ring, comb or coil/spiral (no hard, solid or tack) bound copies of the required proposal data shall be submitted to: Samuel J. Houston, Director of Planning, Office of Facilities Planning and Construction,
Submittals must be received in the Facilities Planning and Construction Office by 12:00 p.m. (Noon) local time, November 21, 2007. Facsimile (FAX) or E-Mail submittals are not acceptable and will not be considered.