NOTICE TO PROFESSIONAL CONSULTANTS
Florida Gulf Coast University Board of Trustees, announces that Professional Services in the discipline of engineering will be required for the project listed below:
Project No. BR-1061
Project and Location: Central Energy Plant-Expansion 2
Description of Project
This project pertains to the updating/expansion of Central Energy Plant equipment. It is not thought to include an expansion of the
The project will utilize the Public Open Bid method for delivery of construction.
The selected firm will provide design, construction documents, and administration services for the referenced project. The estimated cost of construction for the project is approximately $2,000,000 and the total project budget is $2,800,000.
Instructions:
Firms desiring to apply for consideration shall submit a letter of application.
The letter of application should have attached the following:
1. A completed Board of Regents Professional Qualifications Supplement, dated September 1999. Applications on any other form will not be considered.
2. A copy of the applicants current Professional Registration Certificate from the appropriate governing board. An applicant must be properly registered at the time of application to practice its profession in the State of
Submit five (5) copies of the above requested data bound in the order listed above. Applications, which do not comply with the above instructions, may be disqualified. Application materials will not be returned. The plans and specifications for State University System projects are subject to reuse in accordance with the provisions of Section 287.055, Florida Statutes. As required by Section 287.133, Florida Statutes, a consultant may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected consultant must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontract, or consultant in excess of $15,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.
Professional Qualifications Supplement forms, descriptive project information, and selection criteria may be obtained by contacting: Mr. Jack Fenwick, Director of Facility Planning,
Submittals must be received in the Facilities Planning Office, by 3:00 p.m. (Local Time), on November 13, 2007. Facsimile (FAX) submittals are not acceptable and will not be considered.