This rule chapter amendment provides for electronic application for qualification with the Department and certification of current capacity. Although not included in the rule development notice, an amendment to Rule 14-22.009, F.A.C., is needed ...
RULE NO: RULE TITLE
14-22.0011: General Procedural Requirements
14-22.002: Regulations Covering Qualification of Contractors
14-22.006: Current Capacity Rating
14-22.009: Over-Bidding
14-22.012: Suspension, Revocation, or Denial of Qualification
14-22.0121: Reapplication and Reinstatement
14-22.0141: Contractor Non-Responsibility
14-22.015: Forms
PURPOSE AND EFFECT: This rule chapter amendment provides for electronic application for qualification with the Department and certification of current capacity. Although not included in the rule development notice, an amendment to Rule 14-22.009, F.A.C., is needed because there is a cross reference to one of the rules being amended.
SUMMARY: The contractor application for qualification process is being amended to establish an electronic application submittal. Although not included in the rule development notice, an editorial amendment to Rule 14-22.009, F.A.C., is needed because there is a cross reference in one of the rules being amended.
SUMMARY OF STATEMENT OF ESTIMATED REGULATORY COSTS: No Statement of Estimated Regulatory Cost was prepared.
Any person who wishes to provide information regarding a statement of estimated regulatory costs, or provide a proposal for a lower cost regulatory alternative must do so in writing within 21 days of this notice.
SPECIFIC AUTHORITY: 334.044(2), 337.14(1) FS.
LAW IMPLEMENTED: 120.569, 337.11(3)(b), 337.11(5)(a) 1.-3., 337.11 (7)(b)1., 337.11(7)(c), 337.14, 337.16, 337.165, 337.167 FS.
IF REQUESTED WITHIN 21 DAYS OF THE DATE OF THIS NOTICE, A HEARING WILL BE SCHEDULED AND ANNOUNCED IN FAW.
THE PERSON TO BE CONTACTED REGARDING THE PROPOSED RULE IS: James C. Myers, Clerk of Agency Proceedings, Florida Department of Transportation, Office of the General Counsel, 605 Suwannee Street, Mail Station 58, Tallahassee, Florida 32399-0458
THE FULL TEXT OF THE PROPOSED RULE IS:14-22.0011 General Procedural Requirements.
(1) This rule chapter sets forth requirements for applicants to be certified by the Department as qualified to bid for the performance of road, bridge, or public transportation construction contracts, in excess of $250,000.
(2) Except for the provisions of Rules 14-22.012 and 14-22.0141, F.A.C., this rule chapter does not apply to bidders who wish to bid on construction contracts of $250,000 or less, or other contracts not having to do with the construction of roads, bridges, or other public transportation projects, or where the Department has waived the qualification requirements of Construction projects having a contract price of less than $500,000 due to the determination that the projects are of a noncritical nature and that waiver of qualification requirements will not endanger public health, safety, or property.
(3) through (4)(b)5. No change.
Specific Authority 334.044(2), 337.14(1) FS. Law Implemented 120.569, 337.11(3)(b), 337.11(5)(a)1.-3., 337.11(7)(b)1., 337.11(7)(c), 337.14, 337.16, 337.165, 337.167 FS. History–New 11-10-82, Amended 8-25-83, Formerly 14-22.011, Amended 12-20-89, 1-4-94, 7-1-95, Amended 8-6-96, 1-17-99, 7-8-01, 6-27-04,________.
14-22.002 Regulations Covering Qualification of Contractors.
(1) Application for Qualification.
(a) Persons or firms who desire to qualify with the Department in order to bid for the performance of road, bridge, or public transportation construction projects in excess of $250,000, shall file annually with the Department two copies of an electronic application for qualification. An application for qualification shall be filed electronically on the website http://www.dot.state.fl.us/cc-admin/default.htm. Information regarding the electronic application can be obtained by writing to the Department at the address listed below. Persons or firms may obtain information on how to obtain a user name and password to use the electronic application filing process by contacting the Contracts Administration Office at the address below. The electronic application will consist of requested information on the Applicant, Applicant’s stakeholder, Applicant’s affiliates, and would include the Applicant firm’s background, current and historical contract detail, construction experience, and expertise, financial information and requested work classes. Persons or firms shall also file two hard copies of including audited financial statements as required by this section via hand delivery or mail to Department of Transportation, Contracts Administration Office, 605 Suwannee Street, MS 55, Room 60, Haydon Burns Building, Tallahassee, Florida 32399-0455. For purposes of this rule, “filing” is defined as receipt of the application and audited financial statements by the Contracts Administration Office, MS 55, Room 60, Haydon Burns Building, 605 Suwannee Street, Tallahassee, Florida 32399-0455.
(b) through (b)5. No change.
Specific Authority 334.044(2), 337.14(1), 337.167 FS. Law Implemented 337.14, 337.164, 337.167 FS. History–Formerly Chapter 14-8, Amended 7-1-67, 8-20-68, 5-9-70, 1-6-72, 9-24-75, Formerly 14-22.01(1), (2), (3), Amended 3-23-79, 11-10-82, 8-25-83, 10-1-85, Formerly 14-22.02, Amended 12-20-89, 6-27-90, 1-4-94, 7-1-95, 6-27-04, 5-15-06,________.
14-22.006 Current Capacity Rating.
(1) through (2) No change.
(3) In order for the Department to have the information required to determine a bidder’s Current Capacity, it is necessary that the bidder certify the total dollar amount of all work the bidder has underway submit on the day of the letting, a Certification of Current Capacity, Form 375-020-22, Rev. 05/05, that shall be executed under oath. This certification shall be accomplished electronically in the manner directed by the Department concurrently with form must be included in the bid submittal for the first letting in the calendar month that the bidder submits a bid. Failure to submit this document shall result in a determination that all bids submitted by the bidder for that letting are disqualified and are rejected, pursuant to Rule 14-22.009, F.A.C. The Department shall include instructions to meet this requirement the Certification of Current Capacity, Form 375-020-22, Rev. 05/05 with the proposal documents issued to the bidder.
(4) In submitting this preparing the cCertification of Current Capacity, Form 375-020-22, Rev. 05/05 the following shall apply:
(a) through (c) No change.
Specific Authority 334.044(2), 337.14(1) FS. Law Implemented 337.11(3)(b), 337.11(5)(a)1.-3., 337.11(7)(b)1., 337.11(7)(c), 337.14, 337.164 FS. History–Formerly Chapter 14-8, Amended 7-1-67, 8-20-68, 5-9-70, 1-6-72, 7-24-75, Formerly 14-22.01(8), Amended 3-23-79, 11-10-82, 8-25-83, 10-1-85, Formerly 14-22.06, Amended 12-20-89, 6-27-90, 1-4-94, 7-1-95, 7-2-95, 12-18-05, 5-15-06,________.
14-22.009 Over-Bidding.
(1) Any bid that exceeds the Current Capacity of the bidder shall be disqualified and rejected unless the bidder fulfills the requirements of subsection 14-22.009(3), F.A.C.
(2) In the event a bidder submits the low bid on two or more projects in the same letting where the aggregate dollar amount of the bids is greater than the Current Capacity of the bidder, and the bidder is unable to increase its Current Capacity by fulfilling the requirements of subsection 14-22.009(3), F.A.C., the Department shall select the particular project or projects for award that will result in the least cost to the Department.
(3) Before the Department takes action under the provisions of either of the preceding two paragraphs, the bidder shall be notified in writing of the Department’s action and, except for the AF provisions of sub-subparagraph 14-22.003(2)(a)2.a., F.A.C., above, shall be allowed a period of 10 days from the date the bid was opened to submit a cCertification of work underway pursuant to Rule 14-22.006, F.A.C. Current Capacity form.
(4) The determination of the successful bidder on any project or projects in which bids have been disqualified under the provisions of this section shall be made without consideration of the disqualified bid(s).
Specific Authority 334.044(2), 337.14(1) FS. Law Implemented 337.11(3)(b), 337.11(5)(a)1.-3., 337.11 (7)(b)1., 337.11(7)(c), 337.14, 337.165 FS. History–Formerly Chapter 14-8, Amended 7-1-67, 8-20-68, 5-9-70, 1-6-72, 9-24-75, Formerly 14-22.01(11), Amended 3-23-79, 11-10-82, 8-25-83, Formerly 14-22.09, Amended 12-20-89, 1-4-94, 7-1-95, 7-2-95, 7-8-01, 12-18-05,_________.
14-22.012 Suspension, Revocation, or Denial of Qualification.
(1) through (1)(a)2. No change.
3. The contractor made or submitted to the Department false, deceptive, or fraudulent statements, certifications, or materials in any claim for payment or any information required by any Department contract, including the cCertification of work underway Current Capacity to the Department.
4. through (6) No change.
Specific Authority 334.044(2), 337.14(1) FS. Law Implemented 334.044(27), 337.11, 337.14, 337.16, 337.165, 337.167 FS. History–Formerly Chapter 14-8, Amended 7-1-67, 8-20-68, 5-9-70, 1-6-72, 9-24-75, Formerly 14-22.01(11), Amended 3-23-79, 11-10-82, 8-25-83, 10-1-85, Formerly 14-22.12, Amended 12-20-89, 1-4-94, 7-1-95, 7-2-95, 2-16-99, 7-8-01, 6-27-04,__________.
14-22.0121 Reapplication and Reinstatement.
(1) through (2) No change.
(3) If the petition for reapplication or reinstatement is granted, the contractor must file a current Application for Qualification, Form 375-020-32, Rev. 12/98, with the Contracts Administration Office, MS 55, Room 60, Haydon Burns Building, 605 Suwannee Street, Tallahassee, Florida 32399-0455. Reinstatement shall not be effective until issuance of a Certificate of Qualification. The financial statements submitted with the reinstatement application must comply with subsection 14-22.002(2), F.A.C.
Specific Authority 334.044(2), 337.14(1), 337.167(2) FS. Law Implemented 337.14, 337.16, 337.164, 337.165, 337.167 FS. History–New 8-25-83, Amended 10-1-85, Formerly 14-22.121, Amended 12-20-89, 1-4-94,_________.
14-22.0141 Contractor Non-Responsibility.
(1) Contractors who wish to bid for the performance of construction contracts less than or equal to $250,000, or any maintenance contracts, are presumed to be responsible bidders unless the Department determines that good cause exists to declare the contractor non-responsible, which shall include the following:
(a) One of the circumstances specified in Section 337.16(2), Florida Statutes, occurs;
(b) The contractor or its affiliate defaulted on any contract, or the contract surety assumed control of or financial responsibility for, any contract of the contractor;
(c) The contractor’s qualification to bid is suspended, revoked, or denied by any public agency or semi-public agency;
(d) The contractor made or submitted to the Department false, deceptive, or fraudulent statements, certifications, or materials in any claim for payments or any information required by any Department contract;
(e) The contractor failed to comply with contract requirements, or failed to follow Department direction in the execution of a contract;
(f) The contractor did not pay its subcontractors or suppliers in a timely manner or in compliance with contract documents;
(g) The contractor or affiliate(s) has been convicted of a contract crime, as provided in Section 337.165, F.S.;
(h) An affiliate of the contractor has previously been determined by the Department to be non-responsible, and the specified period of suspension, revocation, or denial remains in effect.
(i) The contractor has demonstrated instances of poor or unsatisfactory performance, deficient management resulting in project delay, poor quality workmanship, a history of payment of liquidated damages, untimely completion of projects where liquidated damages were not paid, uncooperative attitude, contract litigation, claims, or defaults.
(j) When the Department determines that any other circumstance constituting “good cause” under Section 337.16(2), Florida Statutes, exists.
(2) Determination of Contractor Non-Responsibility. The Contractor will be determined to be non-responsible and ineligible to bid on Department contracts for a period of time, based on the seriousness of the deficiency.
(a) Examples of factors affecting the seriousness of a deficiency are:
1. Impacts on project schedule, cost, or quality of work;
2. Unsafe conditions allowed to exist;
3. Complaints from the public;
4. Delay or interference with the bidding process
5. The potential for repetition;
6. Integrity of the public construction process; and
7. Effect on the health, safety, and welfare of the public.
(b) The time frames associated with paragraphs 14-22.012(1)(a) through (b), F.A.C., shall be used as factors for the determination of seriousness of Contractor Non-Responsibility.
(c)(b) This rule does not limit the Department’s ability to reject a bid submitted by a contractor, or cancel an award, for a particular contract based upon the contractor being non-responsible.
(3) Notice of intended agency action under this section will be provided in accordance with Rule 28-106.111, F.A.C. The Department’s action will become final unless a timely petition for a hearing is filed in accordance with Rules 28-106.104, 28-106.201 and 28-106.301, F.A.C. In order to be timely, the petition must be filed with the Department’s Clerk of Agency Proceedings within 21 days after receipt of the Department’s notice, in accordance with Rule 28-106.111, F.A.C.
Specific Authority 334.044(2) FS. Law Implemented 337.16(2) FS. History–New 4-11-95, Amended 12-7-97, 7-8-01, 6-27-04,________.
14-22.015 Forms.
The following forms are incorporated by reference as part of the rules of the Department and are available from the Contracts Administration Office, 605 Suwannee Street, Mail Station 55, Room 1-B, Tallahassee, Florida 32399-0455:
Form NumberDateTitle
375-020-3201/06Application for Qualification
375-020-2205/05Certification of Current Capacity
700-010-2509/05 Contractor Past Performance
Report375-020-3707/06Application for Qualification for
Emergency Debris RemovalSpecific Authority 334.044(2), 337.14(1) FS. Law Implemented 120.53(1)(b), 337.14, 337.167 FS. History–New 11-10-82, Amended 8-25-83, Formerly 14-22.15, Amended 12-20-89, 1-4-94, 7-1-95, 7-2-95, 7-8-01, 6-27-04, 12-18-05, 5-15-06, 11-5-06,________.
NAME OF PERSON ORIGINATING PROPOSED RULE: Juanita Moore, Manager, Contracts Administration Office
NAME OF SUPERVISOR OR PERSON WHO APPROVED THE PROPOSED RULE: Stephanie C. Kopelousos, Secretary
DATE PROPOSED RULE APPROVED BY AGENCY HEAD: October 8, 2007
DATE NOTICE OF PROPOSED RULE DEVELOPMENT PUBLISHED IN FAW: August 24, 2007
Document Information
- Comments Open:
- 10/19/2007
- Summary:
- The contractor application for qualification process is being amended to establish an electronic application submittal. Although not included in the rule development notice, an editorial amendment to Rule 14-22.009, F.A.C., is needed because there is a cross reference in one of the rules being amended.
- Purpose:
- This rule chapter amendment provides for electronic application for qualification with the Department and certification of current capacity. Although not included in the rule development notice, an amendment to Rule 14-22.009, F.A.C., is needed because there is a cross reference to one of the rules being amended.
- Rulemaking Authority:
- 334.044(2), 337.14(1) FS.
- Law:
- 120.569, 337.11(3)(b), 337.11(5)(a) 1.-3., 337.11 (7)(b)1., 337.11(7)(c), 337.14, 337.16, 337.165, 337.167 FS.
- Contact:
- James C. Myers, Clerk of Agency Proceedings, Florida Department of Transportation, Office of the General Counsel, 605 Suwannee Street, Mail Station 58, Tallahassee, Florida 32399-0458
- Related Rules: (8)
- 14-22.0011. General Procedural Requirements
- 14-22.002. Regulations Covering Qualification of Contractors
- 14-22.006. Current Capacity Rating
- 14-22.009. Over-Bidding
- 14-22.012. Suspension, Revocation, or Denial of Qualification
- More ...