To obtain public comments on the draft injection well permit for Peace River Regional Water Supply Authority, who applied on August 16, 2016 for a major modification of a permit to operate an injection well system (File No. 136595-014-UO/5Q, WACS ...
DEPARTMENT OF ENVIRONMENTAL PROTECTION
RULE NO.:RULE TITLE:
62-528.321Public Comments and Requests for Public Meetings for Underground Injection Control
The Department of Environmental Protection announces a public meeting to which all persons are invited.
DATE AND TIME: November 17, 2016, 10:00 a.m.
PLACE: Peace River Facility, 8998 Southwest County Road 769, Arcadia, Florida, 34269
GENERAL SUBJECT MATTER TO BE CONSIDERED: To obtain public comments on the draft injection well permit for Peace River Regional Water Supply Authority, who applied on August 16, 2016 for a major modification of a permit to operate an injection well system (File No. 136595-014-UO/5Q, WACS 40593). The project is located at the Peace River Water Treatment Plant (WTP), 8998 SW County Road 769, Arcadia, Florida 34269. The facility will modify a non-hazardous Class V injection well operation permit to allow cycle tests of aquifer storage and recovery (ASR) wells S-4 and S-20 using partially treated surface water. Recharge of the remaining nineteen ASR wells with potable water from the WTP will continue. ASR wells S-4 and S-20 will be recharged with 2 to 4 million gallons per day each. During the public comment period provided in Rule 62-528.315, F.A.C., any interested person may submit written comments on the draft permit. All comments shall be considered in making the final decision and shall be answered as provided in Rule 62-528.330, F.A.C.
A copy of the agenda may be obtained by contacting: Neil I. Campbell, Engineering Specialist, DEP, 2600 Blair Stone Road, MS 3530, Tallahassee, Florida 32299-2400, phone: (850)245-8612.
Pursuant to the provisions of the Americans with Disabilities Act, any person requiring special accommodations to participate in this workshop/meeting is asked to advise the agency at least 48 hours before the workshop/meeting by contacting: Neil I. Campbell, Engineering Specialist, DEP, 2600 Blair Stone Road, MS 3530, Tallahassee, Florida 32299-2400, phone: (850)245-8612. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1(800)955-8771 (TDD) or 1(800)955-8770 (Voice).
If any person decides to appeal any decision made by the Board with respect to any matter considered at this meeting or hearing, he/she will need to ensure that a verbatim record of the proceeding is made, which record includes the testimony and evidence from which the appeal is to be issued.
For more information, you may contact: Neil I. Campbell, Engineering Specialist, DEP, 2600 Blair Stone Road, MS 3530, Tallahassee, Florida 32299-2400, phone: (850)245-8612.
Document Information
- Hearing Meeting:
- Peace River Facility, 8998 Southwest County Road 769, Arcadia, Florida, 34269
- Subject:
- To obtain public comments on the draft injection well permit for Peace River Regional Water Supply Authority, who applied on August 16, 2016 for a major modification of a permit to operate an injection well system (File No. 136595-014-UO/5Q, WACS 40593). The project is located at the Peace River Water Treatment Plant (WTP), 8998 SW County Road 769, Arcadia, Florida 34269. The facility will modify a non-hazardous Class V injection well operation permit to allow cycle tests of aquifer storage and ...
- Meeting:
- public meeting
- Contact:
- Neil I. Campbell, Engineering Specialist, DEP, 2600 Blair Stone Road, MS 3530, Tallahassee, Florida 32299-2400, phone: 850.245.8612
- Related Rules: (1)
- 62-528.321. Public Comments and Requests for Public Meetings for Underground Injection Control