Other Agencies and Organizations, Sarasota Memorial Hospital  


  • Request for Statements of Qualifications to Contract for Architectural and Engineering Professional Services for Medical Walk-In Clinic on S. Tamiami Trail for Sarasota County Public Hospital Board

    Request for Statements of Qualifications to Contract for Architectural and Engineering Professional Services for Medical Walk-In Clinic on S. Tamiami Trail for the Sarasota County Public Hospital BoarD

    Request for Statements of Qualifications

    TO CONTRACT FOR ARCHITECTURAL AND ENGINEERING

    PROFESSIONAL SERVICES FOR MEDICAL WALK-IN CLINIC ON S. TAMIAMI TRAIL

    FOR THE SARASOTA COUNTY PUBLIC HOSPITAL BOARD SARASOTA MEMORIAL HOSPITAL

    SARASOTA, FLORIDA

    The Sarasota County Public Hospital Board of Sarasota County, Florida is accepting statements of qualifications from Architectural/Engineering Consulting firms. The scope of work may include programming, demolition drawings, schematic design, design development, construction documents, and construction administration for all architectural, civil, site work, mechanical, electrical, plumbing, fire protection, and structural design work for the exterior renovation and interior construction of a 5,700 square foot, plus or minus, 1 story walk-in clinic building to be sited on a parcel located on S. Tamiami Tr. north of Stickney Point Road in Sarasota County. Firms to submit include Architectural/ Engineering firms or an association of firms under the direction of the Architect. Services required may include architectural, civil, mechanical, electrical, plumbing, fire protection, and structural. Firms are required to submit 5 bound qualification statements that include at least the following data, in the order listed below:

    1.    A copy of Florida Professional and Corporate Registration certificates.

    2.    Proof of General and Professional Liability Insurability.

    3.    Proof if the firm or any of the associations are a Minority Business Enterprise.

    4.    Proposed design team with resumes.

    5.    Completed medical walk-in center projects.

    6.    Additional information the respondent considers relevant for this submittal.

    Comments:

    1.    The Hospital reserves the right to reject any or all submittals and to discontinue the selection process at any time.

    2.    The Hospital reserves the right to request information or the submittal of documentation in addition to that set forth above.

    3.    Questions regarding submissions shall be directed to:

    Tom Perigo

    (941)685-9066

    4.    Only the person listed as the contact person shall be contacted. No other SMH staff, administrators, or board members shall be contacted. Failure to comply could result in immediate disqualification at the discretion of the Director of Architecture and Construction.

    Submissions shall be titled

    Sarasota Memorial Health Care System

    Statement of Qualifications for the Walk-in Clinic on South Tamiami Trail

    Qualification Statements shall be received no later than Thursday, November 4, 2010, 2:00 p.m. Submittals received after this time will remain unopened and available for pick up.

    Attention:

    Tom Perigo

    Sarasota Memorial Health Care System

    1515 S. Osprey, Ave., Building A

    Sarasota, Florida 34239-3555

    A public meeting will be held at Sarasota Memorial Hospital main campus, Tuesday November 23, 2010, 12:00 Noon – 2:00 p.m., in the main campus auditorium. The top three firms will be ranked.

    Negotiations with the number one ranked firm shall begin Monday November 29, 2010. Sarasota Memorial Health Care System (SMHCS) will have 15 working days to negotiate an agreement with the number one ranked firm. If unsuccessful within 15 working days SMHCS will begin negotiations with the number two ranked firm, and have 15 working days to reach an agreement. If unsuccessful within 15 working days SMHCS will begin negotiations with the number three ranked firm and have 15 working days to reach an agreement. If SMHCS cannot reach agreement with any of the top three ranked teams, this Request for Qualifications will be deemed terminated.

Document Information