Notice of Request for Proposals
REMODEL RENOVATE-REROOF ANNEX TWO
EPICENTER CAMPUS #186-J-07-1
Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for
02B |
Selective Demolition |
07C |
Joint Sealants |
03A |
Cast-in-Place & Tilt Wall Concrete |
08A |
Doors, Frames & Hardware |
04A |
Masonry |
08D |
Storefront |
05A |
Structural Steel |
09G |
Painting |
07B |
Built-up Roofing |
|
|
A pre-proposal meeting will be held at 10:00 a.m. (Local Time), November 15, 2007 (The above referenced trades)
A pre-proposal meeting will be held at 10:00 a.m. (Local Time), March 16, 2008 (All other trades) at the following location:
Project Site
Deadline for receipt of Proposal Packages 02B, 03A, 04A, 05A, 07B, 07C, 08A, 08D, 09G has been set for 2:00 p.m., November 27, 2007.
Deadline for receipt of All Other Proposal Packages has been set for 2:00 p.m., April 8, 2008.
Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., of the day specified above, will be returned unopened.
All trade contractors must be pre-qualified prior to submitting a proposal. A copy of the pre-qualification form can be received by contacting Peter R. Brown Construction, Inc., Estimating Department at (727)535-6407 or faxing a letter of interest to (727)539-8485.
One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost. Drawings will be available for Proposal Packages 02B, 03A, 04A, 05A, 07B, 07C, 08A, 08D, 09G: October 24, 2007 and All Other Trades February 26, 2008. Trade contractors are responsible for the cost of shipping. Additional sets may be purchased directly from the copy center. Copy center information will be distributed with the Proposal Packages.
No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing by: Proposal Packages 02B, 03A, 04A, 05A, 07B, 07C, 08A, 08D, 09G November 19, 2007 and All Other Trades March 31, 2007. The Owner and Architect will not accept calls regarding this project.