The purpose of this rulemaking is to establish a process in Environmental Resource Permitting rules to allow the completed phase of permitted surface water management system construction project to be transferred to the operation phase prior to ...  

  •  

    WATER MANAGEMENT DISTRICTS
    Southwest Florida Water Management District

    RULE NO: RULE TITLE
    40D-4.331: Modification of Permits
    PURPOSE AND EFFECT: The purpose of this rulemaking is to establish a process in Environmental Resource Permitting rules to allow the completed phase of permitted surface water management system construction project to be transferred to the operation phase prior to completion of the entire project. The effect of the rule revisions will be to establish a uniform procedure whereby permittees may request that independently functioning phases of a construction project authorized by an ERP be transferred to the operation phase and to the responsible operation and maintenance entity while allowing the originally issued permit to remain active until completion of construction of the entire project. Minor amendments are also made to the ERP general conditions concerning requirements for transferring a construction permit to the operation phase.
    SUBJECT AREA TO BE ADDRESSED: Amend Rule 40D-4.331, F.A.C., to provide that a request to transfer an independently functioning portion of a permitted system to operation phase shall include an application for formal modification of the construction permit. Amend Rule 40D-4.351, F.A.C., to provide that a request to transfer a constructed portion of a permitted system to operation phase shall include information demonstrating that the constructed portion is capable of functioning independently in compliance with permit conditions. Amend Rule 40D-4.381, F.A.C., to revise the general conditions for ERPs to clarify that in order to transfer responsibility for operation and maintenance of a permitted surface water management system, the Permittee shall complete, at a minimum, compensation for impacts to wetlands or other surface waters as well as construction of the surface water management system, and that the permit will not be transferred to the operation and maintenance entity until the operation phase becomes effective.
    SPECIFIC AUTHORITY: 373.044, 373.113, 373.149, 373.171 FS.
    LAW IMPLEMENTED: 373.042, 373.403, 373.409, 373.413, 373.414, 373.416, 373.426, 373.429, 403.805 FS.
    IF REQUESTED IN WRITING AND NOT DEEMED UNNECESSARY BY THE AGENCY HEAD, A RULE DEVELOPMENT WORKSHOP WILL BE NOTICED IN THE NEXT AVAILABLE FLORIDA ADMINISTRATIVE WEEKLY.
    THE PERSON TO BE CONTACTED REGARDING THE PROPOSED RULE DEVELOPMENT AND A COPY OF THE PRELIMINARY DRAFT, IF AVAILABLE, IS: Martha A. Moore, Senior Attorney, Office of General Counsel, 2379 Broad Street, Brooksville, FL 34604-6899, (352) 796-7211, extension 4651.

    THE PRELIMINARY TEXT OF THE PROPOSED RULE DEVELOPMENT IS:

    40D-4.331 Modification of Permits.

    An application for modification of an Environmental Resource Permit shall be processed in accordance with this rule, unless the permit is revoked, suspended or expired.

    (1) No change.

    (2) Applications to modify a construction permit shall be made by formal or letter modification:

    (a) Formal modifications. By formal application and review using the same criteria as new applications, pursuant to Rules 40D-4.101, 40D-4.301, and 40D-4.302, F.A.C., unless

    the proposed modification involves an outparcel construction within a permitted commercial project. A request for modification involving construction within an outparcel of a permitted commercial or industrial development should be made using the form “General Environmental Resource Permit Application for Modification Related to Outparcel Construction Within Permitted Commercial Projects”, adopted by reference in Rule 40D-1.659, F.A.C.

    1. Except for those projects meeting the criteria for letter modifications in subsection (b), an alteration of the design of the surface water management system shall be reviewed in accordance with the same criteria as new applications pursuant to Rules 40D-4.101, 40D-4.301 and 40D-4.302, F.A.C.

    2. A request for modification involving construction within an outparcel of a permitted commercial or industrial development should be made using District Form No. LEG-R.001.00(2/05), adopted by reference in Rule 40D-1.659, F.A.C.

    3. A request to transfer an independently functioning portion of a permitted system to operation phase shall include an application for formal modification of the construction permit to identify the constructed phase separate from the remaining unconstructed project.

    (b) Except for projects identified in subsection (2)(a), applications to modify a permit may be made bBy letter, provided the requested modification does not:

    1. through 6. No change.

    (3) through (4) No change.

    Specific Authority 373.044, 373.113, 373.149, 373.171 FS. Law Implemented 373.413, 373.416(1), 373.429, 403.805 FS. History– Readopted 10-5-74, Formerly 16J-4.13, Amended 10-1-84, 3-1-88, 10-1-88, 6-29-93, 10-3-95, 7-23-96, 2-1-05, 2-6-07,________.

     

    40D-4.351 Transfer of Permits.

    (1) No change.

    (2) Conversion to Operation Phase.

    (a) through (c) No change.

    (d) A request to transfer a portion of a permitted system to operation phase shall include a demonstration by the applicant that the constructed portion of the system is capable of functioning independently in compliance with all conditions for permit issuance. Such a request shall be accompanied by a formal application to modify the existing construction permit to identify the constructed phase separate from the remaining unconstructed project. The 45 day time period allowed to convert a construction permit to operation phase shall not commence until the formal modification of the construction permit is issued.

    Specific Authority 373.044, 373.113 FS. Law Implemented 373.413, 373.416(2), 403.805 FS. History–New 10-1-84, Amended 6-29-93, 10-3-95, 7-22-03, 2-1-05, 5-4-05,________.

     

    40D-4.381 General Conditions.

    (1) The following general conditions shall be a part of all permits issued pursuant to this chapter and Chapter 40D-40, F.A.C.

    (a) through (g) No change.

    (h) The permittee shall complete, at a minimum, construction of all aspects of the surface water management system, including wetland compensation for impacts to wetlands or other surface waters (grading, mulching, planting), compensation for floodplain encroachment or loss of historic basin storage, water quality treatment features, and discharge control facilities prior to beneficial occupancy or use of the development being served by this system and prior to transfer of responsibility for operation and maintenance of the system to a local government or other responsible entity.

    (i) through (k) No change.

    (l) Each phase or independent portion of the permitted system must be completed in accordance with the permitted plans and permit conditions prior to conversion to operation phase and the occupation of the site or operation of site infrastructure located within the area served by that portion or phase of the system. Each phase or independent portion of the system must be completed in accordance with the permitted plans and permit conditions prior to transfer of responsibility for operation and maintenance of that phase or portion of the system to a local government or other responsible entity.

    (m) through (n) No change.

    (o) The operation phase of this permit shall not become effective until the permittee has complied with the requirements of the conditions in subsection (1) above, the District in accordance with subsections 2.6 through 2.6.3 of the Basis of Review, adopted by reference in Rule 40D-4.091, F.A.C., determines the system to be in compliance with the permitted plans, and the entity approved by the District accepts responsibility for operation and maintenance of the system. The permit shall may not be transferred to the operation and maintenance entity approved by the District until the operation phase of the permit becomes effective. Following inspection and approval of the permitted system by the District, the permittee shall request transfer of the permit to the responsible operation and maintenance entity approved by the District, if different from the permittee. Until the permit is transferred pursuant to subsection 2.6.1 of the Basis of Review, adopted by reference in Rule 40D-4.091, F.A.C., the permittee shall be liable for compliance with the terms of the permit.

    (p) through (x) No change.

    (2) No change.

    Specific Authority 373.044, 373.113, 373.149, 373.171 FS. Law Implemented 373.042, 373.403, 373.409, 373.413, 373.414, 373.416, 373.426 FS. History–Readopted 10-5-74, Amended 12-31-74, 6-7-78, Formerly 16J-4.06(7), 16J-4.11, 16J-4.10(3), Amended 10-1-84, 3-1-88, 10-3-95, 10-16-96, 10-11-01, 2-19-04,________.