The FDOT is preparing design plans to widen State Road (SR) 40 in Marion County. The design of SR 40 is divided into two project segments: Segment 1 runs from the end of the existing four lanes near Silver Springs to just east of County Road (CR) ...  

  •  

    DEPARTMENT OF TRANSPORTATION

    The Florida Department of Transportation (FDOT), District Five announces a public meeting to which all persons are invited.

    DATE AND TIME: Tuesday, November 15, 2016, Open House from 5:30 p.m. to 7:30 p.m., Presentation at 6:00 p.m.

    PLACE: Ocklawaha Bridge Baptist Church located at 14100 NE Highway 40 in Silver Springs, Florida 34488

    GENERAL SUBJECT MATTER TO BE CONSIDERED: The FDOT is preparing design plans to widen State Road (SR) 40 in Marion County. The design of SR 40 is divided into two project segments: Segment 1 runs from the end of the existing four lanes near Silver Springs to just east of County Road (CR) 314; Segment 2 begins just east of CR 314 and ends just east of CR 314A. The total project length is 11.2 miles. In both segments, the proposed improvements include widening SR 40 to a four-lane, divided roadway. Access changes are also proposed at two locations within the first segment. The design plans for the first segment include a 12-foot-wide multi-use trail along the north side of SR 40 from the end of the existing four lanes to the Ocklawaha Bridge. The Segment 1 trail switches to the south side of the roadway from the Ocklawaha Bridge to East of County Road 314. The design for the second segment continues the 12-foot-wide multi-use trail along the south side of SR 40 to west of CR 314A where it will be a 10-foot-wide sidewalk to the end of the widening. Access changes are also proposed at two locations within the first segment. The Financial Project ID (FPID) numbers are: 410674-2-32-01, 410674-3-32-01.

    The hearing is being held to present and obtain comments about the proposed widening plans for both segments of SR 40. The hearing is being held as an open house from 5:30 p.m.to 7:30 p.m. There will be a brief presentation at 6:00 p.m., after which participants may provide comments to all present. Representatives from the design team will be available to discuss the project and answer questions before and after the presentation.

    A copy of the agenda may be obtained by contacting: Kathleen Enot, FDOT Project Manager at (386)943-5149 or by e-mail at kathleen.enot@dot.state.fl.us.

    Pursuant to the provisions of the Americans with Disabilities Act, any person requiring special accommodations to participate in this workshop/meeting is asked to advise the agency at least 7 days before the workshop/meeting by contacting: Kathleen Enot, FDOT Project Manager at (386)943-5149 or by e-mail at kathleen.enot@dot.state.fl.us. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1(800)955-8771 (TDD) or 1(800)955-8770 (Voice).

    For more information, you may contact: Additional information on the project is also available at www.sr40eastmarion.com.