Use of University Facilities (Repealed)  

  •  

    DEPARTMENT OF EDUCATION
    Florida International University

    6C8-5.009 Use of University Facilities

    NOTICE TO CONSTRUCTION MANAGERS

    The Florida International University Board of Trustees announces that construction management services are required for the Project identified below:

     

    PROJECT NAME & NUMBER:BT-868 Parking Garage Six (“Project”)

    PROJECT LOCATION:Modesto A. Maidique Campus (MMC), Miami, Florida

    PROJECT DESCRIPTION:

    The University’s Department of Parking and Transportation plans to construct a new parking garage for approximately 2,000 cars on the MMC site currently designated as Parking Lot #1, located between SW 8th Street and SW 10th Street (University Drive - East Campus Circle) and between the 112th street campus entrance and the existing PG4 Garage.

    The Project will be similar in design and construction to the existing PG5 “Market Station” which is located about 900 feet east of the proposed site. In addition to parking on upper floors, the ground floor of the project may include a bus station, retail space, classrooms, offices and support spaces. These spaces may be constructed as unfinished shell space, fully built out concurrently with the garage or, alternatively, the area may be initially constructed as parking with some provisions for future conversion into enclosed space.

    The Project will involve construction of roadway improvements and access drives needed to facilitate traffic flow into, out of, and around the proposed garage. Adjacent features such as a traffic circle and a pedestrian bridge may also be incorporated into the Project.

    The Project is planned to occur in at least two major phases and may require multiple Guaranteed Maximum Prices (GMPs). Preliminary site demolition work, underground utilities work, foundations and other underground work will start as a first phase prior to new above-ground work. Work on the creation of shell space or build-out of the shell space may occur as additional phases after the parking garage is substantially complete. Funding sources for shell space and build-out of the shell space and for a bridge and some road work elements are unknown at this time and their construction is contingent on funding. FIU reserves the right to retain separate construction management firms to manage the construction of the shell space and build-out of the shell space and to do other improvements within and adjacent to Parking Garage Six as separate projects.

    The total building construction cost is currently estimated to be approximately $31,000,000. Construction Documents are expected to be completed in 2013 and all phases of construction must be completed in time for the start of the fall 2014 semester.

    INSTRUCTIONS: Firms desiring to provide construction management services for the project shall submit a letter of application and a completed Construction Manager Qualifications Supplement (CMQS) form. Proposals must not exceed 80 pages, including the CMQS and letter of application. Pages must be numbered consecutively. Submittals, which do not comply with these requirements or do not include the requested data, will not be considered. No submittal material will be returned.

    Submit ten (10) bound copies of the required proposal data and one CD copy of the complete proposal in Adobe Acrobat PDF format of the above requested data bound in the order listed. Applications that do not comply with the above instructions will not be considered. Application material will not be returned. The University reserves the right to suspend or discontinue the selection process at any time and to return or reject any or all submissions of qualifications without obligation to the respondent. The award of this contract is subject to availability of funds.

    The Construction Manager Qualifications Supplement (CMQS) form and the Project Fact Sheet, which describes the selection process schedule for this Project and additional information regarding the Project scope, may be obtained from the web-site http://facilities.fiu.edu/projects/BT-868PG6.htm. Requests for meetings by individual firms will not be granted. Once the firm acquires the required forms, questions may be directed to Facilities Planning at (305)348-4090 or via email to griffith@fiu.edu and cc: mazorras@fiu.edu.

    GENERAL REQUIREMENTS: All applicants must be licensed to practice as general contractors in the State of Florida at the time of application. Corporations must be registered to operate in the State of Florida by the Department of State, Division of Corporations, at the time of application. As required by Section 287.133, Florida Statutes, a construction management firm may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected construction management firm must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $15,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.

    FIU HAS CREATED STANDARD CONTRACT FORMS, GENERAL TERMS AND CONDITIONS OF THE CONTRACT FOR CONSTRUCTION AND STANDARD INSURANCE REQUIREMENTS APPLICABLE TO CM SERVICES TO PROVIDE FOR AN EFFICIENT AND EFFECTIVE PROCESS. THESE FORMS ARE AVAILABLE FOR REVIEW, AND CAN BE FOUND AT http://facilities.fiu.edu/formsandstandards.htm.

    ALL APPLICANTS SHOULD REVIEW THE APPLICABLE FIU CONTRACT FORM AND STANDARD INSURANCE REQUIREMENTS CAREFULLY PRIOR TO MAKING A DECISION AS TO WHETHER OR NOT TO RESPOND TO THIS ADVERTISEMENT.

    SUBMIT QUALIFICATIONS TO: Selection Committee, Florida International University, Facilities Planning, Campus Support Complex, 11555 S.W. 17th St., Room #142, Modesto A. Maidique Campus, Miami, Florida 33199. Submittals must be received between 8:30 a.m. and 12:30 p.m. or 1:30 p.m. and 4:00 p.m. local time, Friday, December 21st, 2012.

    Submittals will not be accepted before or after the times and date stated above. Facsimile (FAX) submittals are not acceptable and will not be considered.