Home »
2017 Issues »
Vol. 43, No. 227 (11/27/2017) » A public information meeting is being held regarding an off-system design project to replace the existing Barracuda Bridge over the Canal Brandano waterway in New Smyrna Beach.
The proposed bridge will be longer than the existing bridge and will ...
A public information meeting is being held regarding an off-system design project to replace the existing Barracuda Bridge over the Canal Brandano waterway in New Smyrna Beach.
The proposed bridge will be longer than the existing bridge and will ...