    The Florida International University Board of Trustees announces that construction management services will be required for the project identified below:

    Project Name and Number: Baseball Stadium Renovation, FM160429

    Project Location: Modesto Maidique Campus, Miami, Florida

    Project Description: This Project is to alter and renovate existing ground floor spaces in the FIU Baseball Stadium Building at the Modesto Maidique Campus. The work includes alterations to the existing Home Team Locker Room and adjoining restroom/shower stalls. The Project now plans to include the relocation of the existing Men’s Public Restroom and, as an “Additive Alternate,” renovation of the existing Women’s Public Restroom. The Project includes site improvements at the Dugout Suite.

    The work will include expanding the existing Home Team Locker Room to accommodate 40 lockers and a larger restroom with individual showers. The Locker Room improvements will include a lounge, possibly with a study area, a break room and a room to remove and store cleats. Relocation of the Men’s Public Restroom to adjoin the existing Woman’s Public Restroom is critical to gaining space for the aforementioned expansion. The Project may also include Life Safety upgrades and various waterproofing measures throughout the building.

    The Baseball Stadium Project plans to renovate the following spaces/square feet:

    Home Team Locker Room, Lounge and Men’s and Woman’s Public Restroom

    – 4,200 sf (renovated space)

    Dugout Suite – 660 sf (renovated space)

    Based on the scope of work described above, the total construction cost is approximately $1,455,000.00 and the total project cost is $2,000,000. FIU has made a commitment that projects be designed and built with the goal of meeting the USGBC's “LEED Silver" certification rating level. This Project shall comply with Florida Statutes 255.251 Energy Conservation and Sustainable Buildings Act including 255.252 (3) and (4) and, in accordance with Florida Administrative Code 60D-4.006 Life Cycle Cost Analysis Requirements, careful consideration must be given to alternatives which reduce the operating and maintenance costs for this Project.

    Architectural and Engineering Design is being performed by MCHarry & Associates and SDM Consulting Engineers and Construction Documents are nearing completion but are not available for review at this time. Project scope may be increased by the University, in its sole discretion, to include additional spaces/square feet should a funding source for such scope increases be identified prior to project completion. The total construction cost and the total project cost may increase, at the University’s sole discretion.

    Applicants are hereby notified that in the event the University is unable to secure full funding necessary for either the initial project components or added components, the University intends to proceed only with design and construction of fully funded project components and phase(s), if any.

    INSTRUCTIONS: Firms desiring to provide construction management services for the project shall submit a letter of application and a completed Construction Manager Qualifications Supplement (CMQS) form. Proposals must not exceed 80 pages, including the CMQS and letter of application. Pages must be numbered consecutively. Submittals, which do not comply with these requirements or do not include the requested data, will not be considered. No submittal material will be returned.

    Submit Nine (9) bound copies of the required proposal data and one CD/DVD or USB Flash Drive copy of the complete proposal in Adobe Acrobat PDF format of the above requested data bound in the order listed. Applications that do not comply with the above instructions will not be considered. Application material will not be returned.

    The University reserves the right to suspend or discontinue the selection process at any time and to return or reject any or all submissions of qualifications without obligation to the respondent. The award of this contract is subject to availability of funds.

    The Construction Manager Qualifications Supplement (CMQS) form and the Project Fact Sheet, which describes the selection process schedule for this Project and additional information regarding the Project scope, may be obtained from the web-site http://facilities.fiu.edu/projects/FM160429.htm. Requests for meetings by individual firms will not be granted. Once the firm acquires the required forms, questions may be directed to Facilities Planning at (305)348-4090 or via email to griffith@fiu.edu  and cc: stuart.grant@fiu.edu.

    GENERAL REQUIREMENTS: All applicants must be licensed to practice as general contractors in the State of Florida at the time of application. Corporations must be registered to operate in the State of Florida by the Department of State, Division of Corporations, at the time of application. As required by Section 287.133, Florida Statutes, a construction management firm may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected construction management firm must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $15,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.

    FIU HAS CREATED STANDARD CONTRACT FORMS AND STANDARD INSURANCE REQUIREMENTS APPLICABLE TO A/E’S FOR A/E AND OTHER LICENSED PROFESSIONAL SERVICES TO PROVIDE FOR AN EFFICIENT AND EFFECTIVE PROCESS.  THESE FORMS ARE AVAILABLE FOR REVIEW AND CAN BE FOUND AT http://facilities.fiu.edu/formsandstandards.htm .

    ALL APPLICANTS SHOULD REVIEW THE APPLICABLE FIU CONTRACT FORM AND STANDARD INSURANCE REQUIREMENTS CAREFULLY PRIOR TO MAKING A DECISION AS TO WHETHER OR NOT TO RESPOND TO THIS ADVERTISEMENT.

    Submittals must be received between 8:30 a.m. and 12:30 P.M. OR 1:30 p.m. and 4:00 p.m. local time, Friday, December 2, 2016. Submittals will not be accepted before or after the times and date stated above and must be delivered to Florida International University, Facilities Planning, Campus Support Complex, Room #142, Modesto A. Maidique Campus, Miami, Florida 33199 to be valid. Facsimile (FAX) submittals are not acceptable and will not be considered.