DEPARTMENT OF CHILDREN AND FAMILIES
Sewer Line Replacement, Northeast Florida State Hospital
INVITATION TO BID
Proposals are requested from QUALIFIED STATE CERTIFIED, GENERAL OR PLUMBING CONTRACTORS by the State of Florida, Department of Children and Families, hereinafter referred to as OWNER, for the construction of:
PROJECT NO: DCF - 16235500
TITLE: NEFSH Building # 12 ( C ) SEWER LINE REPLACEMENT
SITE: Northeast Florida State Hospital, 7487 South State Road 121, Macclenny, Florida 32063, Building #12.
PREQUALIFICATION: Each prime Bidder shall be state-certified in accordance with Chapter 489, Florida Statutes, as a General or Plumbing Contractor. Bids from firms not able to furnish proof of the required certification are subject to disqualification.
PROPOSAL: Bids must be submitted in full and in accordance with the requirements of the Drawings and the General and Technical Specifications, which may be examined and obtained from the Project Manager:
P/M: Florida Department of Children and Families, Office of General Services, Design, and Construction. 1317 Winewood Blvd., Building #3, Room 205-F, Tallahassee, Florida 32399-0700
TEL#: (850)717-4303
EMAIL: jimmie.padgett@myflfamilies.com
BID DOCUMENTS: PDF Drawings and Specifications may be purchased from the Project Manager, by payment of printing and handling costs at the rate of $10.00 per bid set.
PRE-BID MEETING: A MANDATORY pre-bid meeting will be held on Thursday, NOVEMBER 19, 2015 at 10:00 a.m. local time. The meeting will be held at 7487 South State Road 121, Macclenny, Florida, Northeast Florida State Hospital, Maintenance & Facilities-Building #19
BONDING REQUIREMENTS: See Section B-11 for bid guarantee requirements. See Section C-5 for performance and payment bond requirements.
BID OPENING: Sealed bids will be received, and publicly opened and read aloud at:
DATE: November 30, 2015, Monday
TIME: 10:00 a.m. local time
LOCATION: 7487 South State Road 121, Macclenny, Florida, Northeast Florida State Hospital, Maintenance & Facilities-Building #19
Summary of Work: project is a 90 day duration from signed contract / Notice to Proceed.
1.Bid # 1. All work will take place at the Northeast Florida State Hospital Building # 12 C. The cast iron sewer lines under Build # 12 C (elevated floor above the ground) needs to be removed and replaced with SCH 40 PVC (APX 500 lf) (contractor to verify). This work will stop where the pipe goes underground. The cast iron pipe underground to the clay pipe that is under the sidewalk is not in this scope of work. Try to reuse the hangers if possible. The toilet floor flanges and piping coming down through the floor do not need replacing. Cut the old pipe as close as possible to the floor and attach new pipe. Clean out sewer line sludge (dry or wet) and put in a sealed drum (protect ground from sludge spill/contamination). After the pipe sludge is removed, put all cast iron pipe in a dumpster and recycle the pipe. Provide documentation to DCF / NEFSH for the recycled pipe. When the drum is 80% full, seal drum and turn over to NEFSH Maintenance Department. This work will also include all ground protection and cleaning material to be placed in a sealed drum when pipe cleaning is completed. Contractor site is to be fenced off and secure.
2.Alternate # 1 is to supply and install sink p trap drains that supply water to the sewer lines we are replacing (first floor only). Contractor Verify quantity. Contractor will hold bid price for 120 days. This work might not happen if determined it is not needed or Alternate could be added in March or April 2016.