DEPARTMENT OF EDUCATION
University of FloridaProject: UF-394 PK Yonge Phase II Middle & High School Wing (PK Campus)
NOTICE TO PROFESSIONAL CONSULTANTS:
The University of Florida Board of Trustees announces that Professional Services in the discipline of architecture will be required for the project listed below:
Project: UF-394 PK Yonge Phase II Middle & High School Wing (PK Campus)
In 2008, PK Yonge contracted with Fielding Nair International to help program the entire campus based on BRPH Architects master plan. This step has completed the conceptual drawings and layouts for the entire campus replacement. This project includes the completion of design documents for the middle and high school building Phase II of the master plan, created during the above mentioned conceptual planning. The project consists of the demolition of some existing facilities to make space for the new two story approximately 75,000 GSF facility that will provide new teaching space for middle and high school.
The estimated construction budget is approximately $14,900,000.00, including (site improvements, underground utilities, other). The project will be delivered using the Construction Manager At-Risk method. Platinum LEED (Leadership in Energy and Environmental Design) certification for schools by the U.S. Green Building Council is a mandatory Minimum.
The selected firm will provide design, construction documents and construction administration services for the referenced project. Plans and specifications for University of Florida projects are subject to reuse in accordance with the provisions of Section 287.055, Florida Statutes.
Blanket design professional liability insurance will be required from the architect, mechanical, electrical, plumbing, fire protection and structural engineering subconsultants for this project and will be provided as a part of Basic Services.
Applicants will be evaluated on the basis of their past performance, experience, personnel, design ability, references, workload, and responses to questions posed both in the shortlist and interview phases. The Selection Committee may reject all proposals and stop the selection process at any time.
At the time of application, the applicant and its landscape architectural and engineering consultants must possess current design licenses from the appropriate governing board and be properly registered to practice its profession in the State of Florida. If the applicant is a corporation, must be chartered by the Florida Department of State to operate in Florida.
Applicants desiring to provide professional services for the project shall submit a proposal only after thoroughly reviewing the facilities program, Project Fact Sheet, and other background information. The proposal shall be prepared as specified in the PQS Instructions and shall include:
1. A Letter of Application that concisely illustrates the applicant’s understanding of the scope of services, design intent, schedule, and other goals and considerations as outlined in the Project Fact Sheet and facilities program.
2. A completed, project-specific "Professional Qualifications Supplement” (PQS) proposal with signed certification. Applications on any other form will not be considered.
3. Resumes, LEED accreditation, and other pertinent credentials for all proposed staff (applicant and consultants).
4. Proof of the applicant’s corporate status in Florida (if applicable) and copies of current licenses for applicant and all engineering and landscape architecture consultants from the appropriate governing board.
5. Proof of the applicant’s and all engineering consultants’ ability to be insured for the level of professional liability coverage demanded for this project.
As required by Section 287.133, Florida Statutes, an applicant may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected professional must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $15,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.
Incomplete proposals will be disqualified. Submittal materials will not be returned.
Additional information to assist the applicant in preparing a complete proposal – including the project-specific PQS forms, instructions, Project Fact Sheet, facilities program, UF Design Services Guide, UF Design and Construction Standards, standard University of Florida Owner-Professional agreement, and other project and process information – can be found on the Facilities Planning & Construction website.
Finalists may be provided with supplemental interview requirements and criteria as needed.
Provide the number of copies prescribed in the Project Fact Sheet. Submittals must be received in the Facilities Planning & Construction office by 3:00 p.m. local time, Friday, January 18, 2013. Facsimile (FAX) submittals are not acceptable and will not be considered.
Facilities Planning & Construction
232 Stadium / P.O. Box 115050
Gainesville, FL 32611-5050
Telephone: 352-273-4000; Fax: 352-273-4034
Internet: www.facilities.ufl.edu