PROPOSALS ARE REQUESTED FROM QUALIFIED GENERAL CONTRACTORS BY THE
State of
PROJECT NO: 120187
ACCOUNTING CODE: MILCON FY08 2085
PROJECT NAME & LOCATION: REGIONAL TRAINING INSTITUTE, PHASE 3,
PROJECT DESCRIPTION: Phase 3 for this project consisted of
PREQUALIFICATION: Each bidder whose field is governed by Chapter 399, 455, 489, and 633 of the Florida Statutes for licensure or certification must submit prequalification data of their eligibility with their bid or prior to the bid opening. After the bid opening, the low bidder must qualify in accordance with Rule 60D-5.004, F.A.C. A copy of the requirements is included in the Non-Technical Specifications Level IV/V, Instructions to Bidders under Section B-2 Bidder Qualification Requirements and Procedures. Note: A completed experience questionnaire and financial statement form number DBC 5085 (Exhibit 3) must be submitted with bid.
BID SECURITY: Bids/Proposals in total excess of $100,000.00, the bidder must provide with bid, a good faith deposit in the amount of 5% of the bid by way of a bid bond from a surety insurer authorized to do business in the STATE OF
PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BONDS are required from any persons or parties entering into a formal contract with the STATE OF
Any questions from proposers concerning this solicitation shall be submitted in writing, identifying the submitter, to the Architectural-Engineering Firm listed below, attention: Mr. Scott Herlitzka, Project Manager at e-mail scott.herlitzka@jacobs.com. No questions will be accepted after January 25, 2008, 4:00 p.m. Only e-mail inquiries acceptable. The last day for posting the last addenda is February 4, 2008.
All questions and answers/changes to the solicitation will be provided in writing by addenda via e-mail or fax to each registered plan holder and posted on the DMS Vendor Bid System (VBS). It is the prospective contractors responsibility to check periodically for any information updates to the solicitation which is posted to the VBS. The Department of Military Affairs bears no responsibility for any delays, or resulting impacts, associated with a prospective contractors failure to obtain information made available through the DMS Vendor Bid System.
MANDATORY PRE-BID MEETING
DATE AND TIME: January 16, 2008, 10:00 a.m. local time
PLACE:
All interested parties should call Mrs. Bobbie Smith at (904)823-0256 to be placed on the access list by 4:30 p.m. January 15, 2008. All General Contractors interested in bidding on this project are required to attend this pre-bid meeting.
Sealed bids will be received, publicly opened and read aloud on: (BIDS MUST BE SUBMITTED PRIOR TO BID OPENING NO LATE BIDS WILL BE ACCEPTED):
DATE AND TIME: February 12, 2008, 3:00 p.m. Local time
PLACE: Robert F. Ensslin National Guard Armory,
MARK ENVELOPES: ATTN: SEALED BIDS for: Project No. 120187, REGIONAL TRAINING INSTITUTE, PHASE III, CBJTC, ATTN: Michele Dobbs 0255/Bobbie Smith 0256.
BID/PROPOSAL: All responses must be submitted in a sealed package and shall be clearly marked on the outside of package with the above information. Department of Military Affairs is not responsible for the opening of any solicitation package which is not properly marked. It is the respondents responsibility to assure its response is submitted to the place and time indicated in this solicitation. Also, all responses must be in full accordance with the requirements of the Drawings, Specifications, Bidding Conditions and Contractual Conditions, and Non-Technical Specifications, which have been prepared by the Engineer as listed, and may be obtained as follows:
Drawings, Specifications, Bidding Conditions and Contractual Conditions, which may be examined and obtained on January 4, 2008 after 3:00 p.m. local time from the:
ARCHITECT‑ENGINEER: JACOBS FACILITIES INC. MR. JEFF VARITEK
Jacobs Facilities, Inc.
TELEPHONE: (407)903-5285
DEPOSIT: $250.00 per set of Drawings and Specifications is required with a limit of (2) sets per General Contractor or Prime Bidder and one set per mechanical subcontractor and/or electrical subcontractor. Make checks payable to: Jacobs Facilties Inc.. The deposit shall only be returned to those General Contractors, or Prime Bidders, mechanical subcontractors and/or electrical subcontractors, who, after having examined the Drawings and Specifications submit a bid (in the case of mechanical and/or electrical subcontractors submission of a bid to a prime bidder), and return the Drawings and Specifications in good condition within fifteen (15) days of the date of receipt of bids.
All technical questions shall be directed to the A/E Mr. Scott Herlitzka until close of business January 25, 2008 at e-mail scott.herlitzka@jacobs.com. No questions will be accepted after January 25, 2008 4:00 p.m. Only e-mail inquiries acceptable. The last day for posting the last addenda is February 4, 2008.