Advertisement for Construction Management Services
NOTICE TO CONSTRUCTION MANAGERS:
The University of Florida Board of Trustees announces that CM-At-Risk services will be required for the project listed below:
Project: UF-604, UF Health Proton Therapy Institute Gantry Expansion (Jacksonville)
The project consists of expansion of the existing facility footprint to incorporate a new proton accelerator and gantry for additional patient treatments. It is anticipated to expand the building by approximately 10,000 SF over two floors with utilities being tied back into the existing building infrastructure. The existing patient corridor will be maintained and extended into the new expansion whereby maintaining patient circulation as it is in its current operations. The parking to the east side of the existing building will be eliminated for this project to occur.
The estimated construction budget is approximately $7,600,000, including building and all site and underground utilities improvement, surveys and material testing, etc. The project will be delivered using the Construction Manager at Risk delivery method and construction shall be “fast-tracked” in two consecutive phases to begin by summer of 2016. Phase I will include early package for site and possible foundation and phase II will include the building. Gold level LEED (Leadership in Energy and Environmental Design) design and construction in accordance to the U.S. Green Building Council is expected.
The contract for construction management services will consist of pre-construction and construction. Pre-construction services will begin at the Advanced Schematic Design stage and will include production of cost studies and estimates; value engineering; analysis of the design documents for constructability, coordination, detailing, materials, and systems; development and maintenance of the construction schedule; production of detailed jobsite management plans; development of strategies for the procurement of trade contracts; development of waste management strategies; and development of a Guaranteed Maximum Price (GMP) proposal based on 100% Construction Documents for each phase of the construction. If the GMP proposal is accepted and executed, the construction phase will be implemented. In this phase, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fees for phase one of the contract, or failure to arrive at an acceptable GMP budget within the time provided in the agreement, may result in the termination of the construction manager's contract.
Applicants will be evaluated on the basis of their past performance, experience, personnel, references, bonding capacity, workload, and responses to questions posed both in the shortlist and interview phases. The Selection Committee may reject all proposals and stop the selection process at any time.
At the time of application, the applicant must be licensed to practice as a general contractor in the State of Florida and, if the applicant is a corporation, must be chartered by the Florida Department of State to operate in Florida. The selected applicant will also be required to provide insurance coverage for General Liability, Automotive Liability, Workers’ Compensation, and Builder’s Risk.
Applicants desiring to provide construction management services for the project shall submit a proposal only after thoroughly reviewing the facilities program, Project Fact Sheet, and other background information. The proposal shall be prepared as specified in the CMQS Instructions and shall include:
1. A Letter of Application that concisely illustrates the applicant’s understanding of the scope of services, schedule, and other goals and considerations as outlined in the Project Fact Sheet and facilities program.
2. Company information and signed certification.
3. A completed, project-specific “CM Qualifications Supplement” (CMQS) proposal. Applications on any other form will not be considered.
4. Resumes, LEED accreditation, and other pertinent credentials for all proposed staff.
5. Proof of the applicant’s corporate status in Florida (if applicable) and a copy of the applicant firm’s current contracting license from the appropriate governing board.
6. Proof of applicant’s bonding capacity and liability insurance coverage.
If the applicant is a corporation, it must be chartered by the Florida Department of State to operate in Florida. As required by Section 287.133, Florida Statutes, an applicant may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected construction manager must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $15,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.
Incomplete proposals will be disqualified. Submittal materials will not be returned.
Additional information to assist the applicant in preparing a complete proposal – including the project-specific CMQS forms, instructions, Project Fact Sheet, facilities program, UF Design Services Guide, UF Design and Construction Standards, standard University of Florida Agreement for CM Services, and other project and process information – can be found on the Planning Design & Construction website.
Finalists may be provided with supplemental interview requirements and criteria as needed.
Provide the number of copies prescribed in the Project Fact Sheet. Submittals must be received in the Planning Design & Construction office by 3:00 PM local time on Thursday, January 14, 2016. Facsimile (FAX) submittals are not acceptable and will not be considered.
UF Planning Design & Construction
245 Gale Lemerand Drive / P.O. Box 115050
Gainesville, FL 32611-5050
Telephone: (352)273-4000
Internet: www.facilities.ufl.edu