NOTICE TO CONSTRUCTION MANAGERS:
The University of Florida Board of Trustees, announces that construction management services will be required for the project listed below:
Project No.: UF-207, Project and Location:
The project is in the Design Development phase. The construction management services will consist of a written constructability analysis, value analysis with cost alternatives, and the development of a Guaranteed Maximum Price (GMP) at 60% Construction Document phase. If the GMP is accepted construction will commence. The construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fee or to arrive at an acceptable GMP within the time provided in the agreement may result in the termination of the construction manager's contract. Selection of finalists for interviews will be made on the basis of construction manager qualifications, including experience and ability; past experience; bonding capacity; record-keeping/administrative ability, critical path scheduling expertise; cost estimating; cost control ability; quality control capability; and qualification of the firm's personnel, staff and consultants. Finalists will be provided with a copy of the building program and the latest documentation prepared by the project architect/engineer, a deion of the final interview requirements and a copy of the standard
Firms desiring to provide construction management services for the project shall submit a letter of application and a completed project specific "Construction Manager Qualifications Supplement" available from the website: www.facilities.ufl.edu. Proposals must not exceed 40 pages, including the Construction Manager Qualifications Supplement and letter of application. Pages must be numbered consecutively. Submittals that do not comply with these requirements or do not include the requested data will not be considered. No submittal material will be returned. All applicants must be licensed to practice as general contractors in the State of
Eight bound copies of the required proposal must be received in the Facilities Planning & Construction Division office by 3:00 PM local time on Thursday, March 16, 2006. Facsimile (FAX) submittals are not acceptable and will not be considered.
Facilities Planning & Construction
232 Stadium /
Telephone: 352-392-1256.
FAX: 352-392-6378
Internet: www.facilities.ufl.edu