Other Agencies and Organizations, J. Kokolakis Contracting, Inc.  

  •  

    OTHER AGENCIES AND ORGANIZATIONS

    J. Kokolakis Contracting, Inc.

    DMA Sarasota FMS #14 Renovations

    Notice of Request for Proposals

    State of Florida Department of Military Affairs (DMA)

    Sarasota FMS #14 Renovations (Project No. 214006)

    J. Kokolakis Contracting, Inc. (JKC) (CGC-062093), the Design-Builder for the Sarasota FMS #14 Renovations hereby solicits sealed proposals for the referenced project in accordance with the proposal documents to include but not limited to the following:

    The Scope of Work for this project includes, but is not limited to the following:

    1A

    Testing and Inspections

    8C

    Glass and Glazing

    1B

    Surveying

    9A

    Framing, Insulation, and Drywall

    2A

    Site Work

    9B

    ACT

    2B

    Demolition

    9C

    Vinyl Tile Flooring

    3A

    Concrete

    9D

    Resinous Flooring

    4A

    Unit Masonry

    9E

    Ceramic Tile

    5A

    Structural Steel

    9F

    Paints and Coatings

    6A

    Wood Framing

    10A

    Specialties

    6B

    Cabinets and Millwork

    13A

    Pre-Engineered Structures

    7A

    Roofing

    14A

    Cranes

    7B

    Joint Sealants

    15A

    Plumbing

    8A

    Doors and Hardware

    15B

    HVAC

    8B

    Overhead Coiling Doors

    16A

    Electrical

    Drawings will be made available on 3/18/15. Drawings will be available via the JKC ISqFt portal. Each interested subcontractor will be provided an Invitation to Bid (ITB). Subcontractors are responsible for all shipping and printing costs.

    A pre-proposal meeting will be held on Wednesday, 3/25/15, at 10:00 a.m. at the offices of J. Kokolakis Contracting, Inc. (202 East Center Street, Tarpon Springs, FL 34689). Please advise us of your attendance by 3/20/15.

    No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Design-Builder, in writing by 3/27/15 to estimatingfl@jkokolakis.com. The Owner and Architect will not accept calls regarding this project.

    All interested subcontractors must be pre-qualified. Subcontractors must submit pre-qualification prior to 4/1/15 in order to be considered for this project. Pre-qualification information will be provided upon request using JKC ISqFt portal. Requests for pre-qualification information should be transmitted to bperry@jkokolakis.com and estimatingfl@jkokolakis.com.

    The DMA and JKC are committed to providing equal opportunity and strongly encourage all interested M/WBE and SBE firms to submit proposals.

    Deadline for receipt of Proposal Packages (Listed Above) has been set for Tuesday, 4/8/15, at 2:00 p.m.. Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., of the day specified above, will be returned unopened.

    The DMA and JKC reserve the right to accept or reject any and all proposal in whole or part to waive informalities and irregularities.

    All future updates regarding this project will only be posted to pre-qualified bidders only.

Document Information