Department of Education, Florida State University  


  • Construction Manager FSU School Additions

    NOTICE TO CONSTRUCTION MANAGERS

    Florida State University, State of Florida, announces that construction management services will be required for the project listed below.

    Project No. FS-206

    Project and Location:          Florida State University School Additions

                                                    Florida State University School, Tallahassee, Florida

    The project consists of the design and construction of three new classroom buildings, containing four classrooms in each building and totaling approximately 20,058 gsf. The buildings will be strategically located on the existing FSU School campus, which is located at 3000 School House Road, Tallahassee, FL 32311. Funding for this project will be phased, with an initial project amount for Phase I of $5,000,000, of which approximately $3,989,000 will be used for construction. Funding for Phase II of the project is estimated to be approximately $8,000,000. The construction management team will be selected to perform professional services on Phase I of the project, and upon the satisfactory performance of services for Phase I, and at the discretion of the owner, their agreement may be amended to include the performance of services for subsequent phases of the project. The selected firm will be required to have bonding capacity for Phases I and II of the project. The contract for construction management services will consist of two phases. Phase one is pre-construction services, for which the construction manager will be paid a fixed fee. Phase one services include value engineering, constructability analyses, development of a cost model, estimating, and the development of a Guaranteed Maximum Price (GMP) at 50% Construction Document phase. If the GMP is accepted, phase two, the construction phase, will be implemented. In phase two of the contract, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts, encouraging the inclusion of Minority Business Enterprises (MBEs). Failure to negotiate an acceptable fixed fee for phase one of the contract, or to arrive at an acceptable GMP within the time provided in the agreement may result in the termination of the construction manager’s contract. Selection of finalists for interviews will be made on the basis of construction manager qualifications, including experience and ability; past experience; bonding capacity; recordkeeping/administrative ability, critical path scheduling expertise; cost estimating; cost control ability; quality control capability; and qualifications of the firm’s personnel, staff and consultants.

    Finalists will be provided with the latest documentation prepared by the project architect/engineer, a description of the final interview requirements and, if requested, a copy of the standard Florida State University’s construction management agreement. The Selection Committee may reject all proposals and stop the selection process at any time. The construction manager shall have no ownership, entrepreneurial or financial affiliation with the selected architect/engineer involved with this project.

    Instructions:

    Firms desiring to provide construction management services for the project shall submit a letter of application and the completed Florida State University “Construction Manager Qualifications Supplement.” Proposals must not exceed 80 pages, including the Construction Manager Qualifications Supplement and letter of application. Pages must be numbered consecutively. Submittals which do not comply with these requirements or do not include the requested data will not be considered. No submittal material will be returned. All applicants must be licensed to practice as general contractors in the State of Florida at the time of application. Corporations must be registered to operate in the State of Florida by the Department of State, Division of Corporations, at the time of application. As required by Section 287.133, Florida Statutes, a construction management firm may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected construction management firm must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $50,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.

    The Florida State University Construction Manager Qualifications Supplement forms and the Project Fact Sheet may be obtained through the website at www.fpc.fsu.edu or by contacting:

                    Lynetta Mills, Facilities Design and Construction

                    109 Mendenhall Maintenance Building A, Florida

                    State University, Tallahassee, Florida 32306-4152

                    (850)644-2843 telephone, (850)644-8351 facsimile

    For further information on the project, contact Marvin Beard, Assistant Director, at the address and phone listed above.

    Six bound copies of the required proposal data shall be submitted. Submittals must be received at the address listed above by 2:00 p.m. (Local Time), on Tuesday, April, 15, 2008.

    Facsimile (FAX) or electronic submittals are not acceptable and will not be considered. All applicants will be notified of the results of the short listing via the Facilities Design and Construction web site at www.fpc.fsu.edu.

Document Information