Proposals are requested from QUALIFIED REGISTERED General Contractor, Building Contractor, or Specialty Contractor by the State of Florida, Department of Children and Families, hereinafter referred to as OWNER, for the construction of:
PROJECT NO: DCF - 16230220
TITLE: New Steel Support Structure to Replacement Existing Steel Steam Line support mounted on top of the Concrete Canopy at the Northeast Florida State Hospital.
SITE: Northeast Florida State Hospital, 7487 South State Road 121, Macclenny, Florida 32063.
PREQUALIFICATION: Each prime Bidder shall be state-certified in accordance with Chapter 489, Florida Statutes, as a General Contractor, Building Contractor, or Specialty Contractor. Bids from firms not able to furnish proof of the required certification are subject to disqualification.
PROPOSAL: Bids must be submitted in full in accordance with the requirements of the Drawings and the General and Technical Specifications, which may be examined and obtained from the ARCHITECT/ENGINEER/ PROJECT MANAGER:
A/E: Department of Children and Families, Office of General Services, Design, and Construction. 1317 Winewood Boulevard, Building #3, Room 205-F, Tallahassee, Florida 32399
TEL#: (850)717-4303
E-MAIL: jimmie.padgett@myflfamilies.com
BID DOCUMENTS: Full sets of Drawings and Specifications may be purchased from the ARCHITECT/ENGINEER/PROJECT MANAGER, by payment of printing and handling costs at the rate of $10.00 per bid set.
MANDATORY PRE-BID MEETING: A mandatory pre-bid meeting will be held on Thursday, April 6, 2017 at 10:00 a.m. Eastern (local) time. The meeting will be held at Northeast Florida State Hospital, 7487 South State Road 121, Macclenny Florida 32063, building # 19 (Maintenance) conference room.
BONDING REQUIREMENTS: See Section B-11 for bid guarantee requirements. See Section C-5 for performance and payment bond requirements.
BID OPENING: Sealed bids will be received, publicly opened and read aloud at the location below:
DATE: May 4, 2017, Thursday
TIME: 10:00 a.m., Eastern (local) time
LOCATION: Northeast Florida State Hospital, 7487 South State Road 121, Macclenny Florida 32063, building # 19 (Maintenance) conference room.
The project scope of work is to supply and install a new steel structure straddling over the concrete canopy to support the existing steam pipes. This scope of work includes the installing the concrete footers for the steel columns, with rebar and anchor bolts. Then remove the existing steel structure supporting the steam line on top of the concrete canopy. Re-support any electrical or communication lines from atop of the concrete roof to the new steel structure.
Anticipated Start-up date is May 14, 2017. Contingent on release of funds.