Other Agencies and Organizations, Departmental  

  • Notice of Request for Proposals

     

    City of Sanibel

    New Community Recreation Center

    Lee County 

    Sanibel, FL 

     

    Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the City of Sanibel New Community Recreation Center project hereby solicits sealed proposals for the following trades for the referenced project in accordance with the proposal documents to include but not limited to the following:

     

    02A

    Site Work

    08B

    Sliding Wood-Framed Glass Doors & Wood Windows

    10B

    Pre-fabricated Walkway Covers

    02B

    Demolition

    08C

    Overhead Coiling Doors

    10C

    Operable Panel Partitions

    02C

    Fencing (Chain Link & Aluminum)

    08D

    Aluminum Storefronts & Glazed Curtain Wall

    10D

    Exterior Sun Control Devices

    03A

    Cast-in-Place Concrete

    08E

    Polycarbonate Roof System

    11A

    Projection Screens

    04A

    Masonry

    09A

    Exterior Plastering

    11B

    Residential Appliances

    05A

    Structural & Miscellaneous Steel

    09B

    Drywall

    11C

    Gymnasium Equipment

    06A

    Cabinets

    09C

    Ceramic Tile

    12A

    Window Treatment

    06B

    Wood Trusses

    09D

    Acoustical Treatment

    13A

    Swimming Pool Construction

    07A

    Metal Roofing & Wall Panels

    09E

    Resilient Wood Floor System

    15A

    Fire Sprinklers

    07B

    Built-up Roofing

    09F

    Carpet & VCT

    15B

    Plumbing

    07C

    Waterproofing & Joint Sealants

    09G

    Painting

    15C

    HVAC

    08A

    Doors, Frames, Hardware & Installation

    10A

    Specialties

    16A

    Electrical

     

    Proposal Packages will be available to all pre-qualified contractors approximately April 4, 2006.  A pre-proposal meeting will be held at 10:00 a.m. local time; Wednesday April 26, 2006 at the following location:

     

    City of Sanibel

    Community Recreation Center 

    4980 Sanibel-Captive Road 

    Sanibel, FL  33957 

     

    Deadline for receipt of All Proposal Packages has been set for 2:00 P.M. on May 19, 2006.  Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 PM, of the day specified above, will be returned unopened.

     

    Submission of Proposal:

    If the proposal is sent by US Mail, the sealed envelope shall be addressed as follows:

    Peter R. Brown Construction, Inc.

    Attention: Estimating Department

    PO Box 4100 

    Clearwater, FL  33758 

    SEALED PROPOSAL ENCLOSED

    CITY OF SANIBEL

    NEW COMMUNITY RECREATION CENTER

     

    If the proposal is sent by overnight carrier (i.e. Fed-Ex, UPS, etc) or hand delivered, the sealed envelope shall be addressed as follows:

    Peter R. Brown Construction, Inc.

    Attention: Estimating Department

    13830 58th Street North 

    Suite 401 

    Clearwater, FL  33758 

    SEALED PROPOSAL ENCLOSED

    CITY OF SANIBEL

    NEW COMMUNITY RECREATION CENTER

     

    All trade contractors must be pre-qualified prior to submitting a proposal.  A copy of the pre-qualification form can be received by contacting one of the following:

    Jim Cummings, Director of Estimating

    Joe Ostrowski, Senior Estimator

    Jenny Sanchez, Estimating Assistant

    Phone: 727-535-6407

    Fax: 727-539-8485

     

    The City of Sanibel and Peter R. Brown Construction, Inc. are committed to provide equal opportunity and strongly encourage all interested M/WBE and SBE firms to submit proposals.

     

    One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost.  Drawings will be available April 4, 2006.  Trade contractors are responsible for the cost of shipping.  Additional sets may be purchased directly from the copy center.  Copy center information will be distributed with the Proposal Packages.

     

    The City of Sanibel and Peter R. Brown Construction, Inc. reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities

     

     

     

Document Information