St. Petersburg College
Olympia Building, Tarpon Springs Campus
Remodel/Renovate for Classrooms/Labs
Olympia Building 597-C-07-5
Pinellas County
Palm Harbor, Florida
Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the St. Petersburg College Remodel/Renovate for Classrooms/Labs, Olympia Building Project 597-C-07-5 hereby solicits sealed proposals for the referenced project in accordance with the proposal documents to include but not limited to the following:
The Scope of Work for this project includes but is not limited to the following:
The phased renovation of the Olympia Building. Subcontractor request for proposal #1 includes: aerial photos, fencing, demolition, concrete, masonry, structural steel, below grade waterproofing, temporary electric and temporary HVAC. Demolition activities at the site are expected to begin in late May 2009.
A pre-proposal meeting will be held at 10:00 a.m. (Local Time); Thursday, April 23, 2009 at the following location:
Olympia Building Jobsite Construction Office
Olympia Building: Tarpon Spring Campus
600 Klosterman Road
Palm Harbor, FL 34683
Deadline for receipt of RFP #1 Proposal Packages has been set for 2:00 p.m., April 30, 2009. Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., of the day specified above, will be returned unopened.
All interested subcontractors must be pre-qualified or have completed the pre-qualification process within the last year. Deadline for receipt of prequalification packets is April 3, 2009. Please contact the following person to obtain information or documents about the pre-qualification requirements for this project:
Jonathan Griffith, Estimator
Phone: (727)535-6407 Fax: (727)539-8485
St. Petersburg College and Peter R. Brown Construction, Inc. are committed to provide equal opportunity and strongly encourage all interested M/WBE and SBE firms to submit proposals.
One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost. Drawings will be available April 15, 2009. Trade contractors are responsible for the cost of shipping. Additional sets may be purchased directly from the copy center. Copy center information will be distributed with the Proposal Packages.
St. Petersburg College and Peter R. Brown Construction, Inc. reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities.
No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing by April 24, 2009. The Owner and Architect will not accept calls regarding this project.