Southern Boulevard/State Road 80 Bridge Replacement project, from Washington Road to State Road A1A/South Ocean Boulevard, in Palm Beach County. (FIN: 419013-1-52-01) The Southern Boulevard Bridge Replacement Project consists of replacing the ...
OTHER AGENCIES AND ORGANIZATIONS
The Florida Department of Transportation (FDOT), District Four, announces a public meeting to which all persons are invited.
DATE AND TIME: Wednesday, March 15, 2017, 5:30 p.m. – 7:30 p.m.
PLACE: St. Catherine Greek Orthodox Church Cultural Center, 110 Southern Boulevard, West Palm Beach, FL 33405
GENERAL SUBJECT MATTER TO BE CONSIDERED: Southern Boulevard/State Road 80 Bridge Replacement project, from Washington Road to State Road A1A/South Ocean Boulevard, in Palm Beach County. (FIN: 419013-1-52-01)
The Southern Boulevard Bridge Replacement Project consists of replacing the existing bascule bridge and tide relief bridge over the Intracoastal Waterway and Lake Worth Lagoon between the Town of Palm Beach and City of West Palm Beach. New decorative lighting, pedestrian features, traffic signals and drainage are included. A temporary bridge will be built north of the existing bridge to maintain traffic while the replacement bascule bridge is under construction. Construction will begin in spring 2017 and be completed by late 2020. The estimated construction cost is $93 million.
During the informal open house, attendees will have the opportunity to review renderings of the new bascule bridge, the construction plans and traffic control plans. FDOT staff and consultant staff members will be available to discuss the project and answer questions.
Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability, or family status. Persons who require translation services (free of charge) should contact: Angel Streeter Gardner, Public Information Officer, (561)702-9096, Angel.Gardner@qcausa.com.
A copy of the agenda may be obtained by contacting: Angel Streeter Gardner, Public Information Officer, (561)702-9096, Angel.Gardner@qcausa.com.
Pursuant to the provisions of the Americans with Disabilities Act, any person requiring special accommodations to participate in this workshop/meeting is asked to advise the agency at least 7 days before the workshop/meeting by contacting: Angel Streeter Gardner, Public Information Officer, (561)702-9096, Angel.Gardner@qcausa.com. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, 1(800)955-8771 (TDD) or 1(800)955-8770 (Voice).
For more information, you may contact: Angel Streeter Gardner, Public Information Officer, (561)702-9096, Angel.Gardner@qcausa.com. Additional information is available on the project website at www.southernblvdbridge.com.
Document Information
- Subject:
- Southern Boulevard/State Road 80 Bridge Replacement project, from Washington Road to State Road A1A/South Ocean Boulevard, in Palm Beach County. (FIN: 419013-1-52-01) The Southern Boulevard Bridge Replacement Project consists of replacing the existing bascule bridge and tide relief bridge over the Intracoastal Waterway and Lake Worth Lagoon between the Town of Palm Beach and City of West Palm Beach. New decorative lighting, pedestrian features, traffic signals and drainage are included. A ...
- Meeting:
- public meeting
- Contact:
- Angel Streeter Gardner, Public Information Officer, at (561) 702-9096 or by email at Angel.Gardner@qcausa.com.