Richard Eric Smith.; As to whether the type of work performed by Petitioner, installing pre-engineered or integrated equipment, of which some work is subcontracted, would require a license in the State of Florida, and if so which license is required....  

  •  

    DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION

    Construction Industry Licensing Board

    NOTICE IS HEREBY GIVEN that on March 25, 2016, the Construction Industry Licensing Board has received the petition for declaratory statement from Richard Eric Smith. The petition seeks the agencys opinion as to the applicability of Sections 489.105(3)(a), (b), (d) and (q) F.S., as it applies to the petitioner.

    As to whether the type of work performed by Petitioner, installing pre-engineered or integrated equipment, of which some work is subcontracted, would require a license in the State of Florida, and if so which license is required. Except for good cause shown, motions for leave to intervene must be filed within 21 days after publication of this notice.

    A copy of the Petition for Declaratory Statement may be obtained by contacting: Daniel Biggins, Executive Director, Construction Industry Licensing Board, 1940 North Monroe Street, Tallahassee, FL 32399-0783.

Document Information

Meeting:
Sections 489.105(3)(a), (b), (d) and (q) F.S.,
Contact:
Daniel Biggins, Executive Director, Construction Industry Licensing Board, 1940 North Monroe Street, Tallahassee, FL 32399-0783.