INVITATION TO BID
The State of Florida, Department of Military Affairs (DMA), Construction & Facility Management Office (CFMO) requests bids from State of Florida registered licensed General Building Contractors, (GC), for the following projects; 2 Pre-Engineered Metal Buildings located at Snake Creek Weekend Training Site (WETS), Miramar, FL and Outside Plant (OSP) Communications Cable Installers for Fiber Optic Cable Installation located at Camp Blanding Joint Training Center, Starke, FL.
FOR COMPLETE
FUNDING: The State of Floridas performance and obligation to pay under this contract is contingent upon availability of funding and an annual appropriation by the Legislature.
BID OPENING DATE: As stated on the Vendor Bid System (late bids will not be accepted)
MANDATORY PRE-BID/SITE VISIT DATE: As stated on the Vendor Bid System.
PROJECT 1: Two Multi-purpose (pre-engineered metal buildings)
STATEMENT OF WORK: 211100 One (1) 80' 0'' x 50' 0'' pre-engineered steel building and one (1) 80' 0'' x 30' 0'' pre-engineered steel building, including concrete foundations, concrete floor slabs, gypsum wallboard system, HVAC system, electrical, lighting and plumbing, including underground sanitary sewer and water service. See drawings & specifications obtained from A/E listed in Vendor Bid System solicitation.
PROJECT 2: Fiber Optic to MOUT & CACTF Range
STATEMENT OF WORK: 211079 The project will require the provisioning and installation of conduits, hand holes, pull boxes and fiber optic cable extending several miles from a point of beginning to the Combined Arms Collective Training Facility (CACTF) at the Camp Blanding Joint Training Center. The Department reserves the right to reject any and all submissions or accept minor irregularities in the best interest of the DMA.
POINT OF CONTACT: Department of Military Affairs, Construction & Facility Management Office, Contracting Branch, (904)823-0255, (904)823-0256 or e-mail: cfmocontracting@ng.army.mil.
Faxed or e-mailed bids are not acceptable and will not be considered. All instructions must be complied with and requested data must be included in order for your firm to be considered for this project. All information received will be maintained with the Department and will not be returned.
Request for private meetings by individual firms will not be granted. No individual verbal communication shall take place between any applicants and the Owners or Owners representatives. Request for any additional information, clarifications, or technical questions must be requested in writing.