Notice of Request for Proposals-Revised
ST. PETERSBURG COLLEGE PROJECT #597-B-06-5
REMODEL/RENOVATE FOR CLASSROOMS/LABS
(PHASE 1) OLYMPIA BUILDING TARPON SPRINGS CAMPUS PINELLAS COUNTY
PALM HARBOR, FLORIDA
Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the St. Petersburg College remodel renovate for classrooms/labs Phase 1 Olympia Building Tarpon Springs Campus hereby solicits sealed proposals for the referenced project in accordance with the proposal documents to include but not limited to the following:
The Scope of Work for this project includes but is not limited to the following:
Construction includes a new water cooled chiller for the Olympia Building located at the St. Petersburg College Tarpon Springs Campus. A cooling tower and chiller will be added to the existing campus chiller plant. The associated chilled water lines will be extended to the Olympia Building for future building renovation. Demolition and renovation at the existing plant is required for the installation of the new equipment. Electrical scope includes upgrading the existing panels and connections of equipment. A new fire alarm system will be installed throughout. Other trades associated with the new equipment installation are sod, asphalt, concrete, steel, roofing, stucco, paint and plumbing.
A pre-proposal meeting will be held at 2:00 (Local Time); May 30, 2008 at the following location:
St. Petersburg College Tarpon Springs Campus
600 Klosterman Rd.
Palm Harbor, Florida 34683
School Café on the corner of Klosterman and U.S.19
Directly adjacent to the campus
Deadline for receipt of All Proposal Packages has been set for 2:00 p.m., June 17, 2008. Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., of the day specified above, will be returned unopened.
All interested subcontractors must be pre-qualified or have completed the pre-qualification process within the last year. Prequalification documents must have been submitted by March 7, 2008 to be considered for this project. Please contact the following person to obtain information about the pre-qualification requirements for this project:
Joe Ostrowski, Senior Estimator
Phone: (727)535-6407 Fax: (727)539-8485
St. Petersburg College and Peter R. Brown Construction, Inc. are committed to provide equal opportunity and strongly encourage all interested M/WBE and SBE firms to submit proposals.
One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost. Drawings will be available May 22, 2008. Trade contractors are responsible for the cost of shipping. Additional sets may be purchased directly from the copy center. Copy center information will be distributed with the Proposal Packages.
St. Petersburg College and Peter R. Brown Construction, Inc. reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities.
No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing by June 5, 2008. The Owner and Architect will not accept calls regarding this project.