Department of Education, University of Florida  

  •  

    DEPARTMENT OF EDUCATION
    University of Florida

    UF Heavener Hall (CM)

    NOTICE TO CONSTRUCTION MANAGERS:

    The University of Florida Board of Trustees announces that CM-At-Risk services will be required for the project listed below:

    Project: UF-380, School of Business Building (Gainesville, FL)

    The project consists of the construction of a new 52,000 gross square foot classroom building for the Warrington College of Business Administration to support its undergraduate programs, plus site development and utilities infrastructure. The detailed scope of work is outlined in the Facilities Program, along with project-specific background, goals, and requirements.

    The overall project budget is approximately $21,400,000, with an estimated construction budget of $16.9M, and the goal is to complete and occupy the facility by or before June 2014. Minimum Gold LEED (Leadership in Energy and Environmental Design) certification by the U.S. Green Building Council is mandatory. Design and construction documents will be created using Building Information Modeling (BIM) software, and the CM is expected to use these models and participate in the creation of record (“as built”) models for the Owner’s use.

    The contract for construction management services will consist of two phases, pre-construction and construction. Pre-construction services will begin at the Program Verification / Conceptual Schematic Design stage and will include production of cost studies and estimates; value engineering; analysis of the design documents for constructability, coordination, detailing, materials, and systems; development and maintenance of the construction schedule; production of detailed jobsite management plans; development of strategies for the procurement of trade contracts; development of waste management and other sustainability strategies; and development of a Guaranteed Maximum Price (GMP) proposal based on 100% Construction or Bid Documents. If the GMP proposal is accepted and executed, the construction phase will be implemented. In this phase, the construction manager becomes the single point of responsibility for performance of the construction of the project and shall publicly bid trade contracts. Failure to negotiate an acceptable fixed fee for phase one of the contract, or failure to agree on the GMP may result in termination of the contract.

    Applicants will be evaluated on the basis of their past performance, experience, personnel, references, bonding capacity, safety record, workload, ability, approach, and responses to questions posed both in the shortlist and interview phases. The Selection Committee may reject all proposals and stop the selection process at any time.

    At the time of application, the applicant must be licensed to practice as a general contractor in the State of Florida and, if the applicant is a corporation, must be chartered by the Florida Department of State to operate in Florida. Joint venture applications will not be considered.

    Applicants desiring to provide construction management services for the project shall submit a proposal only after thoroughly reviewing the facilities program, Project Fact Sheet, and other background information. The proposal shall be prepared as specified in the CMQS Instructions and shall include:

    1. A Letter of Application that concisely illustrates the applicant’s understanding of the scope of services, schedule, and other goals and considerations as outlined in the Project Fact Sheet and facilities program.

    2. Company information and signed certification.

    3. A completed, project-specific “CM Qualifications Supplement” (CMQS) proposal. Applications on any other form will not be considered.

    4. Resumes, LEED accreditation, and other pertinent credentials for all proposed staff.

    5. Proof of the applicant’s corporate status in Florida (if applicable) and a copy of the applicant’s current contracting license from the appropriate governing board.

    6. Proof of applicant’s bonding capacity and liability insurance coverage.

    7. Proof of the applicant’s Experience Modification Rating (EMR) safety rating.

    As required by Section 287.133, Florida Statutes, an applicant may not submit a proposal for this project if it is on the convicted vendor list for a public entity crime committed within the past 36 months. The selected construction manager must warrant that it will neither utilize the services of, nor contract with, any supplier, subcontractor, or consultant in excess of $15,000.00 in connection with this project for a period of 36 months from the date of their being placed on the convicted vendor list.

    Incomplete proposals will be disqualified. Submittal materials will not be returned.

    Additional information to assist the applicant in preparing a complete proposal – including the project-specific CMQS forms, instructions, Project Fact Sheet, facilities program, UF Design Services Guide, UF Design and Construction Standards, standard University of Florida Agreement for CM Services, and other project and process information – can be found on the Facilities Planning & Construction website.

    Finalists may be provided with supplemental interview requirements and criteria as needed.

    Provide the number of copies prescribed in the Project Fact Sheet. Submittals must be received in the Facilities Planning & Construction office by 3:00 p.m. local time on Tuesday, June 5, 2012. Facsimile (FAX) submittals are not acceptable and will not be considered.

    Facilities Planning & Construction

    232 Stadium / P. O. Box 115050

    Gainesville, FL 32611-5050

    Telephone: (352)273-4000; Fax: (352)273-4034

    Internet: www.facilities.ufl.edu

    Notice of Bid/Request for Proposal

     

Document Information