Department of Corrections, Departmental  

  •  

    DEPARTMENT OF CORRECTIONS

    CHARLOTTE CORRECTIONAL INSTITUTION WATER TREATMENT PLANT MODIFICATIONS

    SECTION A – ADVERTISEMENT FOR BID

    PROPOSALS ARE REQUESTED FROM GENERAL CONTRACTORS BY THE STATE OF FLORIDA, DEPARTMENT OF CORRECTIONS, FOR THE CONSTRUCTION OF:

    PROJECT NO:EK-38

    PROJECT NAME AND LOCATION: Charlotte Correctional Institution WTP Modifications

    FOR: Miscellaneous Water Treatment Improvements including valve replacement, flocculator improvements, painting, clearwell inspection/cleaning, chlorine monitoring equipment installation and related work.

    PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BOND: If the construction contract award amount is $100,000.00 or less, a Performance Bond and a Labor And Material Payment Bond are not required.

    PUBLIC ENTITY CRIME INFORMATION STATEMENT: A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, F.S., for Category Two for a period of 36 months from the date of being placed on the convicted vendor list.

    PREQUALIFICATION: Each bidder whose field is governed by Chapters 399, 489 and 633, Florida Statutes, for licensure or certification must submit prequalification data of their eligibility to submit proposals five (5) calendar days prior to the bid opening date if not previously qualified by the Department for the current biennium (July 1 through June 30) of odd numbered years. Please call Ms. Sandra Rogers at (850)922-8855 for Prequalification Requirements. You must be prequalified five (5) days prior to bid opening. After the bid opening the low bidder must qualify in accordance with Rule 60D-5.004, F.A.C. A copy of the rule requirements is included in the Instruction To Bidders under Article B-2 “Bidder Qualification Requirements and Procedures”.

    Sealed bids will be received, publicly opened and read aloud on:

    DATE AND TIME: Monday, June 2, 2008, 2:00 p.m. (EDT)

    PLACE: Hartman & Associates, Inc., 4415 Metro Parkway, Suite 320, Fort Myers, FL 33916

    Any person with a qualified disability requiring special accommodations at the pre-bid conference and/or bid/proposal opening shall contact the person listed below at least (5) working days prior to the event. If you are hearing or speech impaired, please contact this office by using the Florida Relay Services which can be reached at 1(800)955-8771 (TDD).

    PROPOSAL: Bids must be submitted in full in accordance with the requirements of the Drawings, Specifications, Bidding Conditions and Contractual Conditions, which may be examined and obtained from the:

    ARCHITECT-ENGINEER Hartman & Associates, Inc., 4415 Metro Parkway, Suite 320, Fort Myers, Florida 33916

    TELEPHONE: (239)277-5155

    Drawings and specifications may be purchased for $125.00 per set from the Architect/Engineer.

    PRE-BID CONFERENCE: A NON mandatory pre-bid conference will be held on site at the Charlotte Correctional Institution Administrative Conference Room on May 13, 2008 at 10:00 a.m. The Charlotte Correctional Institution is located at 33123 Oil Well Road, Punta Gorda, FL 33955.

    CONTRACT AWARD: Bid Tabulation and Notice of Award Recommendation will be sent to all bidders by Facsimile (FAX), Return Receipt Required. If no protest is filed per Article B-20 of the Instructions to Bidders, “Bid Protests, Points of Entry”, the contract will be awarded by the Secretary, Department of Corrections. Right is reserved to reject any or all bids.

Document Information