  • Annex III – Data Center Build-out

    St. Petersburg College

    Annex III – Data Center Build-out

    Pinellas County

    Clearwater, FL

    Peter R. Brown Construction, Inc. is currently soliciting qualified subcontractors for the St. Petersburg College Annex III Data Center Build-out.

    The Scope of Work for this project consists of installing an emergency power system at an existing facility.

    The demolition of the existing emergency back-up equipment and the demolition of an existing roof-top HVAC unit and related ductwork.

    The emergency power system includes but is not limited to a new 3300-gallon above-ground diesel fuel tank, 900kw pad-mounted generator, 300Kva UPS housing (100Kva installed with expansion capacity for 300Kva) and a 30-minute back-up battery, related automatic transfer switches, panels, equipment racks, wiring and conduit.

    Additionally, the existing inergen fire suppression system will be re-routed and modified to accommodate the data center, the existing access floor will be partially replaced, the existing roof will be patched where disturbed by this work, drywall partitions and ceilings will be repaired as needed and all walls inside the existing data room and areas disturbed by this work will be painted.

    The deadline for receipt of All Proposal Packages has been set for 2:00 p.m. on July, 10 2007. Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., of the day specified above, will be returned unopened.

    All interested subcontractors must be pre-qualified or have completed the pre-qualification process within the last year. Please contact the following person to obtain information or documents about the pre-qualification requirements for this project:

    Jenny Sanchez, Estimating Assistant

    Phone: (727)535-6407 – Fax: (727)539-8485

    St. Petersburg College and Peter R. Brown Construction, Inc. are committed to provide equal opportunity and strongly encourage all interested MBE, M/WBE and SBE firms to submit proposals.

    St. Petersburg College and Peter R. Brown Construction, Inc. reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities.

    No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing within seven (7) business days of the proposal due date. The Owner and Architect will not accept calls regarding this project.