Other Agencies and Organizations, Departmental  


  • Notice of Request for Proposals

    School District of Hillsborough County

    Newsome High School 24-Classroom Addition

    Lithia, Florida

    Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the School District of Hillsborough County Newsome High School 24-classroom Addition hereby solicits sealed proposals for all trades for the referenced project in accordance with the proposal documents to include but not limited to the following:

    The scope of work of this project includes complete site work and construction of a new 20,774 square foot two-story building including concrete and masonry construction, steel bar joist and deck, built up roof, and standard School District interior finishes and accessories. The mechanical scope of work includes roof top package units, and plumbing. The electric scope of work includes both high and low voltage including fire alarm, security, data, clocks, intercom, and TV.

    A pre-proposal meeting will be held at 10:00 a.m. local time; Tuesday June 28, 2007, Attendance is encouraged at the following location:

    Newsome High School

    Administration Main Office

    16550 Fishhawk Blvd.

    Lithia, FL

    Deadline for receipt of All Proposal Packages has been set for 2:00 p.m., on Tuesday, July 10, 2007. Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 p.m., on the day specified above, will be returned unopened.

    All trade contractors must be pre-qualified prior to submitting a proposal. A copy of the pre-qualification form can be received by contacting Joe Ostrowski at Peter R. Brown Construction, Inc. Estimating Department, (727)535-6407 or faxing a letter of interest to (727)539-8485.

    The School District of Hillsborough County and Peter R. Brown Construction, Inc. are committed to provide equal opportunity and strongly encourage all interested M/WBE and SBE firms to submit proposals.

    One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost. Drawings will be available June 20, 2007. Trade contractors are responsible for the cost of shipping. Additional sets may be purchased directly from the copy center. Copy center information will be distributed with the Proposal Packages.

    School District of Hillsborough and Peter R. Brown Construction, Inc. reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities.

    No verbal instruction or directives will be accepted regarding this project during the proposal period. All instructions or directives must be clarified through written Addenda or Supplements. All questions regarding the work should be directed to the Construction Manager, in writing by 6/26/07. The Owner and Architect will not accept calls regarding this project.

Document Information