Emergency Variance from Rule 2.7.4.1, A.S.M.E. 17.1, 2000 edition, as adopted by Chapter 3001.2, 2004 Florida Building, requiring 7'0'' clearance in machine room spaces. The petition was received from Lee Rigby of Vertical Assessments, on behalf of ...  


  • NOTICE IS HEREBY GIVEN that on May 31, 2006 the Bureau of Elevator Safety, received a petition for Emergency Variance from Rule 2.7.4.1, A.S.M.E. 17.1, 2000 edition, as adopted by Chapter 3001.2, 2004 Florida Building, requiring 7'0'' clearance in machine room spaces. The petition was received from Lee Rigby of Vertical Assessments, on behalf of Dunes IV, 281 Grande Way, Naples, Florida (Petition VW 2006-149).
    A copy of the Petition for Variance or Waiver may be obtained by contacting: Mark Boutin, Bureau of Elevator Safety, 1940 North Monroe Street, Tallahassee, Florida 32399-1013.
    The Bureau of Elevator Safety will accept comments concerning the Petition for 14 days from the date of publication of this notice. To be considered, comments must be received on or before 5:00 p.m.

Document Information

Contact:
Mark Boutin, Bureau of Elevator Safety, 1940 North Monroe Street, Tallahassee, Florida 32399-1013. The Bureau of Elevator Safety will accept comments concerning the Petition for 14 days from the date of publication of this notice. To be considered, comments must be received on or before 5:00 p.m.