Other Agencies and Organizations, Departmental  


  • Notice of Request for Proposals

    TAMPA POLICE DEPARTMENT

    DISTRICT THREE SUBSTATION

    HILLSBOROUGH COUNTY

    TAMPA, FL

    Peter R. Brown Construction, Inc. (CGC-061419), the Construction Manager for the CITY OF TAMPA & TAMPA POLICE DEPARTMENT DISTRICT THREE SUBSTATION hereby solicits sealed proposals for the following trades for the referenced project in accordance with the proposal documents to include but not limited to the following:

     

    01B

    Final Cleaning & Window Cleaning

    09B

    Drywall

    15B

    Plumbing

    02C

    Fencing & Gate Operators

    09C

    Porcelain & Ceramic Tile

    15C

    HVAC

    02D

    Landscaping & Irrigation

    09D

    Acoustical Treatment

    16A

    Electrical

    03A

    Cast-in-Place Concrete

    09F

    Carpet & VCT

    17A

    Security, Fire Alarm & Structured Cabling

    04A

    Masonry

    09G

    Painting

     

     

    05A

    Structural & Miscellaneous Steel

    10A

    Specialties

     

     

    06A

    Cabinets

    11A

    Audio-Visual Equipment

     

     

    07B

    Built-up Roofing

    11B

    Residential Appliances

     

     

    07C

    Waterproofing & Joint Sealants

    11C

    Detention Furnishings

     

     

    08A

    Doors, Frames, Hardware & Installation

    13B

    Fuel Storage Tanks/Piping

     

     

    08D

    Aluminum Storefronts & Glazed Curtain Wall

    12A

    Window Treatment

     

     

    09A

    Exterior Plastering (Stucco)

    15A

    Fire Sprinklers

     

     

     

    A pre-proposal meeting will be held at 10:00AM local time; Tuesday June 27, 2006 at the following location:

    Lee Davis Neighborhood Service Center

    Auditorium

    2402 North 22nd Street

    Tampa, FL  33605

    Deadline for receipt of All Proposal Packages has been set for 2:00 P.M. on July 18, 2006.  Only proposals received on or before the time and date listed will be considered. All proposals received after 2:00 PM, of the day specified above, will be returned unopened.

    Submission of Proposal:

    If the proposal is sent by US Mail, the sealed envelope shall be addressed as follows:

    Peter R. Brown Construction, Inc.

    Attention: Estimating Department

    PO Box 4100

    Clearwater, FL  33758

    SEALED PROPOSAL ENCLOSED

    Tampa Police Department District Three Substation

    If the proposal is sent by overnight carrier (i.e. Fed-Ex, UPS, etc) or hand delivered, the sealed envelope shall be addressed as follows:

    Peter R. Brown Construction, Inc.

    Attention: Estimating Department

    13830 58th Street North

    Suite 401

    Clearwater, FL  33758

    SEALED PROPOSAL ENCLOSED

    Tampa Police Department District Three Substation

    All trade contractors must be pre-qualified prior to submitting a proposal.  A copy of the pre-qualification form can be received by contacting Peter R. Brown Construction, Estimating Department at 727-535-6407 or faxing a letter of interest to 727-539-8485.

    City of Tampa and Peter R. Brown Construction, Inc. are committed to provide equal opportunity and strongly encourage all interested M/WBE and SBE firms to submit proposals.

    One set of plans and specifications will be supplied to all pre-qualified trade contractors at no cost.  Drawings will be available June 27, 2006.  Trade contractors are responsible for the cost of shipping.  Additional sets may be purchased directly from the copy center.  Copy center information will be distributed with the Proposal Packages.

    City of Tampa and Peter R. Brown Construction, Inc. reserve the right to accept or reject any and all proposals in whole or part and to waive informalities and irregularities. 

    No verbal instruction or directives will be accepted regarding this project during the proposal period.  All instructions or directives must be clarified through written Addenda of Supplements.  All questions regarding the work should be directed to the Construction Manager, in writing within five (5) calendar days of the proposal due date.  The Owner and Architect will not accept calls regarding this project.

Document Information