RULE NO: RULE TITLE
61C-5.001: Standards Adopted; Exclusions; and Conflicts
a 60 day variance from Sections 399.02(5)(a), 399.02(5)(b) and 399.061(4), F.S., which makes the construction permit holder responsible for correcting violations and periodic tests, makes the owner responsible for the safe operation of the elevator ...
- NOTICE IS HEREBY GIVEN that on June 01, 2009, the Division of Hotels and Restaurants, Bureau of Elevator Safety, received a petition for a 60 day variance from Sections 399.02(5)(a), 399.02(5)(b) and 399.061(4), F.S., which makes the construction permit holder responsible for correcting violations and periodic tests, makes the owner responsible for the safe operation of the elevator and gives the division the authority to issue an order to correct any violation and reinspect the elevator. The request was received from Monica Giglio on behalf of Villa DRste Condominium Association in Venice, FL (VW 2009-182).
A copy of the Petition for Variance or Waiver may be obtained by contacting: Mark Boutin, Bureau of Elevator Safety, 1940 North Monroe Street, Tallahassee, Florida 32399-1013.
Document Information
- Contact:
- Mark Boutin, Bureau of Elevator Safety, 1940 North Monroe Street, Tallahassee, Florida 32399-1013.
- Related Rules: (1)
- 61C-5.001. Elevators, Dumbwaiters, Escalators, Moving Walks, Manlifts, Inclined and Vertical Wheelchair Lifts and Inclined Stairway Chairlifts
- Contact: